HomeMy WebLinkAbout20041526 Ver 1_Staff Report_20061019Staff Report Project Num: 20041526
Name: NCDOT - Sr 1322-A
County: Caldwell
Location: Ut Husband Creek Gamewell
Latitude: +35°52'49"
SW Plan Location:
Owner: NC DOT Division 11
Contact Person: Tippett, Lyndo
Inspection Date: 10/19/2006
Reason for Inspection: Routine
On-Site Representative(s):
Primary Inspector: Michael R Parker
Secondary Inspector(s):
Phone: 828-296-4500
Question Areas:
Site Visit
Inspection Summary:
NCDOT is requesting a modification to WQ Certificatin No. 04-1526. They are asking for an additional eight (8) feet of impact and
dewatering of an unnamed tributary to Husband Creek Class "C" waters.
It is recommended that WQ Certification Nos. 3366 and 3404 be issued.
The 401 Certification was issued on October 23, 2006.
?550 P-,)c0
Version: 2 Status: Issued
Project Type: Pipe extension
Region: Asheville
Longitude: -81°38'15"
Title:
Phone:
Entry Time: 09:40 AM Exit Time: 10:15 AM
Inspection Type: Staff Report
Page: 1
Project Num: 20041526 Owner: NC DOT Division 11
Inspection Date: 10/19/2006 Inspection Type: Staff Report
Reason for Visit: Routine
Site Visit Yes No NA NE
Do impacts described in the application differ those seen in the field? ? M ? ?
If yes, please describe differences:
Are the Intermittent/Perennial calls different in the application? ? 0 ? ?
If yes, please describe differences, and how mitigation ratios are affected:
Are there additional impacts not described in the application? ? 0 ? ?
If yes, please describe and quantify:
Were the impacts in place prior to the application for the 401 Certification? ? M ? ?
Additional conditions recommended for the Certification:
Recommended project modifications:
Is this a modification request to an existing Certification? 0 ? ? ?
Are there additional stromwater conditions that should be required due to the following classifications: ? M ? ?
# 303(d)list, Class WS, NSW, ORW, HQW
Describe:
Is this a subdivision or otherwise part of a larger project? ? 0 ? ?
# If yes, what phase is this?
Are there prior impacts from prior phases? ? M ? ?
If yes, what are the cumulative imacts for this project?
Possible secondary impacts noted:
Comment:
Page: 2