Loading...
HomeMy WebLinkAbout20160571 Ver 1_PCN REVISED SHEET 5_201606224. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Temporar T 01 - Choose one Choose Q2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require miti ation, then ou MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse � Tar-Pamlico �tawba QX ndleman Oth� 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number — mitigation impact impact Permanent (P) or required? (square (square Tem orar T feet feet g� P Greenway bridge E. Fork Deep River No 917 604 g2 P Greenway bridge Two Unnamed Tributaries in Wetland No 0 0 63 P Boardwalk and bridge Unnamed Tributary No 3,397 5,216 B4 P Greenway bridge Unnamed Tributary No 878 451 g5 P Greenway bridge Unnamed Tributary No 1,404 760 B6 P No 6h. Total Buffer Impacts: 6,596 7,031 6i. COmm2ntS: Trees and vegetation will be cut flush with the ground to construct elevated boardwalk and bridges in buffers. No grubbing will take place within the stream buffers. Page 5 of 10