Loading...
HomeMy WebLinkAbout20160564 Ver 1_Riparian Buffer Authorization_201606230 14 State of North Carolina Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1a. Name of project: West South Street Multi -family 1 b. County: Wake 1c. Nearest municipality: Raleigh 1d. Subdivision name: n/a 1e. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer 1f below. ❑ Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Owner Information 2a. Name on Recorded Deed: Lambert Development South Street LLC 2b. Deed Book and Page No. DB 016318, PG 01863 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): 2d. Responsible Party (for Corporations): Kerry Berman, Vice President 2e. Street address: 5 Hanover Square, Floor 14 2f. City, state, zip: New York, NY 10004 2g. Telephone no.: 212.785.0090 ext 225 2h. Fax no.: 212.785.7931 2i. Email address: kberman@lambertdevelopment.com 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: David Boyette 4b. Business name (if applicable): Stewart 4c. Street address: 421 Fayetteville Street, Suite 400 4d. City, state, zip: Raleigh, NC 27061 4e. Telephone no.: 919.866.4804 4f. Fax no.: 919.380.8752 4g. Email address: dboyette@stewartinc.com FORM: BA 10-2013 Page 1 of 4 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1703461141 1b. Site coordinates (in decimal degrees): Latitude: -78.6489 Longitude: 35.7718858 1 c. Property size: 0.24 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Rocky Branch 2b. Water Quality Classification of nearest receiving water: c 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is currently developed with an existing building and asphalt/gravel parking area. 3b. Attach an 8'/ x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/ x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 If (only the buffer for the steam is on our project site) 3e. Explain the purpose of the proposed project: Removal of existing impervious area and replacement of existing failing culvert. 3f. Describe the overall project in detail, including the type of equipment to be used: Project is to remove existing improvements within the buffer, replace the existing failing culvert and restore the buffer. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown Comments: See attached Stream Determination. 4b. If yes, who delineated the jurisdictional areas? Name (if known): Cheng Zhang Agency/ Consultant Company: NCDENR Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. April 1, 2016 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. After the existing improvements are removed and the culvert replaced, the property will be redeveloped with a multi -family building. The buffer will not be impacted in the future phase of the project. FORM: BA 10-2013 Page 2 of 4 C. Proposed Impacts Inventory Impact Justification and Mitigation 1. Avoidance and Minimization 1. Buffer Impacts Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 1a. Project is in which protected basin? ® Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section form. D of this Buffer impact number— Permanent (P) or Temporary (T) Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) B1 ❑ P ® T Culvert replacement Allowable UT to Rocky Branch ❑ Yes ® No 1815 2872 B2 ❑ P ❑ T 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No ❑ Yes ❑ No If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. B3 ❑ P ❑ T 2f. Comments: ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 1815 2872 1c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ED] Yes ❑ No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ❑ Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. 1a. If due to site constraints, a BMP other than a level spreader is proposed, please provide a ❑ Yes ® No plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP public (federal/state) land? Manual and attach a BMP Supplement Form. 1 b. F. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of ❑ Yes ® No public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes ® No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent For government transportation projects sent by First Class Mail via the US Postal Service: by delivery service (UPS, FedEx, etc.).- NC tc.):NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 For all other projects sent by First Class Mail For all other projects sent by delivery service via the US Postal Service (UPS, FedEx, etc.).- Karen tc.):Karen Higgins OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit NCDWR — 401 & Buffer Permitting Unit 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 FORM: BA 10-2013 Page 4 of 4