Loading...
HomeMy WebLinkAbout20150869 Ver 2_Approval Letter_20160622Water Resources ENVIRONMENTAL OUALITY PAT MCCRORY Governnr DONALD R. VAN DER VAART Sc=crelun� S. JAY ZIMMERMAN (1iYCC(nr June 22, 2016 Craven County NCDWR Project No. 20150869 v.2 SR 1278 pipe replacement State Project No. 2C.025073 MODIFICATION of APPROVAL of 401 WATER QUALITY CERTIFICATION and NEUSE BUFFER AUTHORIZATION, with ADDITIONAL CONDITIONS Mr. Jay Johnson North Carolina Department of Transportation P.O. Box 1587 Greenville, NC 27835 Dear Mr. Johnson: You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of replacing three RCP's with a CAAP on an unnamed tributary to the Trent River on SR 1278 (Trent Rd) in Craven County: Site Number Stream (Ifj Buffer Zone Buffer Zone 1 s ft 2 s ft 1 30 1115 0 2 50 440 0 � 3 25 175 0 4 0 165 0 Total 105 1895 0 lYet Total 105 1,895 Im acts The project shall be constructed in accordance with your modified application dated received May 27, 2016. All the authorized activities and conditions associated with the original Water Quality Certification dated September 10. 2015 still apply except where superseded by this certification. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 3886. This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. This approval is also valid for the Neuse Riparian Buffer Rules (15A NCAC 2B .0233). In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation State of NoRh Carolina �Environmental Quality I Water Resources 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone',919-807-6300 as described in 15A NCAC 2B.0233. For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. Condition(s) of Certification: 1. This modification is applicable only to the additional proposed activities. All of the authorized activities and conditions of certification associated with the original Water Quality Certification dated September 10, 2015 still apply except where superseded by this certification. 2. A copy of this Water Quality Certification shall be maintained on site at the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. 'The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Sam M.Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Garcy Ward at (252)946-6481or garcy.ward@ncdenr.gov. Sincerely, � �� S. J Zimmerma D ector Division of Water Resources Electronic copy only distribution: Tom Steffens, US Army Corps of Engineers, Washington Field Office Jay Johnson, Division 2 Environmental Officer Garcy Wazd, NC Division of Water Resources Washington Regional Office File Copy Water Resources ENVIRONMEN1Al OUALITV NCDWR Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: County: PAT MCCRORY ��„vern�„� DONALD R. VAN DER VAART ����,����7r�� S. JAY ZIMMERMAN l )7YeL'Ir)7' Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agem's Certification [, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. S ignature: Date: Engineer's Certification Partial Final (, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Registration No. State of North Carolina IEnvironmental Qualiry � Water Resources 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone:919-807-6300