Loading...
HomeMy WebLinkAboutScope comments.pdfWater Resources ENVIRONMENTAL OUALITV PAT MCCRORY Gavemm� DONALD R. VAN DER VAART set�re�a.y S. JAY ZIMMERMAN Direclor June 14, 2016 MEMORANDUM To: Al Blanton, NCDOT Division 9 Design Construct Engineer ,,��,/�,�r�-1� From: Dave Wanucha, NC Division of Water Resources, Winston Salem Regional Office Subject: Scoping comments on proposed improvements/widening to NC 66 in Forsyth County, TIP U-5824 Reference your electronic correspondence dated June l, 2016 in which you requested comments for the referenced project. Preliminary analysis of the project reveals the potential for multiple impacts to streams and jurisdictional wetlands in the project area. More specifically, impacts to: Stream Name Old Field Creek Lowery Mill Creek Martin Mill Creek Notes: *Annrovec River Basin Stream Classificatic Roanoke B Yadkin Pee Dee WS-111 Yadkin Pee Dee WS-Ill TMDL for Mercury Stream Index Number 22-25-11 12-94-12-3-(0.5) 12-94-12-3-1 303(d) Listing* No No No Further investigations at a higher resolution should be undertaken to verify the presence of other streams and/or jurisdictional wetlands in the area. In the event that any jurisdictional areas are identified, the Division of Water Resources requests that NCDOT consider the following environmental issues for the proposed project. General Project Comments: Prior to an issuance of the 401 Water Quality Certification, the NCDOT is respectfully reminded that they will need to demonstrate the avoidance and minimization of impacts to wetlands (and streams) to the maximum extent practicaL In accordance with the Environmental Management Commission's Rules (15A NCAC 2H.0506[h]), mitigation will be required for impacts of greater than 1 acre to wetlands. In the event that mitigation is required, the mitigation plan shall be designed to replace appropriate lost functions and values. North Carolina Division of Mitigation Services may be available for assistance with wetland mitigation. 2. In accordance with the Environmental Management Commission's Rules (15A NCAC 2H.0506[h]), mitigation will be required for impacts of greater than I50 linear feet to any perennial stream. In the event that mitigation is required, the mitigation plan shall be designed to replace appropriate lost functions and values. The North Carolina Division of Mitigation Services may be available for assistance with stream mitigation. Future documentation, including the 401 Water Quality Certification Application, shall continue to include an itemized listing of the proposed wetland and stream impacts with corresponding mapping. State of North Carolina IEmironmental Quality I Water Resowces 1617 Mail Service Center. Raleigh, NoRh Carolina 27699-1617 Phone�.919-807-0300 4. The NCDWR is very concerned with sediment and erosion impacts that could result from this project. The NCDOT shall address these concerns by describing the potential impacts that may occur to the aquatic environments and any mitigating factors that would reduce the impacts. 5. An analysis of cumulative and secondary impacts anticipated as a result of this project is requ'ved. The type and detail of analysis shall conform to the NC Division of Water Resource Policy on the assessment of secondary and cumulative impacts dated April 10, 2004. 6. The NCDOT is respectfully reminded that all impacts, including but not limited to, bridging, fill, excavation and clearing, and rip rap to jurisdictional wetlands, streams, and riparian buffers need to be included in the final impact calculations. These impacts, in addition to any construction impacts, temporary or otherwise, also need to be included as part of the 401 Water Qualiry Certification Application. 7. Where streams must be crossed, the NCDWR prefers bridges be used in lieu of culverts. However, we realize that economic considerations often require the use of culverts. Please be advised that culverts should be countersunk to allow unimpeded passage by fish and other aquatic organisms. Moreover, in azeas where high quality wetlands or streams are impacted, a bridge may prove preferable. When applicable, the NCDOT should not install the bridge bents in the creek, to the maximum elctent practicable. 8. Whenever possible, the NCDWR prefers spanning siructures. Spanning structures usually do not require work within the stream or grubbing of the streambanks and do not require stream channel realignment. The horizontal and vertical clearances provided by bridges shall allow for human and wildlife passage beneath the structure. Fish passage and navigation by canoeists and boaters shali not be blocked. Bridge supports (benu) should not be placed in the stream when possible. 9. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated bufFers, etc.) before entering the stream. To meet the requirements of NCDOT's NPDES permit NCS0000250, please refer to the most recent version of the North Carolina Department of Transportation Stormwater Best Management Practices Toolbox manual for approved measures. 10. Sediment and erosion control measures should not be placed in wetlands or streams. 11. Borrow/waste azeas should avoid wetlands to the maacimum extent practicaL Impacts to wetlands in bonow/waste azeas will need to be presented in the 401 Water Quality Certification and could precipitate compensatory mitigation. 12. 'fhe 401 Water Quality Certification application will need to specifically address the proposed methods for stormwater management. More specifically, stormwater shall not be permitted to dischazge directly into streams or surface waters. 13. Based on the information presented in the document, the magnitude of impacts to wetlands and streams may require a Nationwide (NV� application to the Corps of Engineers and corresponding 401 Water Quality Certification. Please be advised that a 401 Water Qualiry Certification requires satisfactory protection of water quality to ensure that water quality standards are met and no wetland or stream uses aze lost. Final permit authorization will require the submittal of a formal application by the NCDOT and written concurrence from the NCDWR. Please be aware that any approval will be contingent on appropriate avoidance and minimization of wetland and stream impacts to the maximum extent practical, the development of an acceptable stormwater management plan, and the inclusion of appropriate mitigation plans where appropriate. 14. If concrete is used during construction, a dry work azea shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be dischazged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 15. If temporary access roads or detours aze constructed, the site shall be graded to its preconstruction contours and elevations. Disturbed areas shall be seeded or mulched to stabilize the soil and appropriate native woody species shall be planted. When using temporary structures the area shall be cleared but not grubbed. Cleazing the area with chain saws, mowers, bush-hogs, or other mechanized equipment and leaving the stumps and root mat intact allows the area to re-vegetate naturally and minimizes soil disturbance. 16. Unless otherwise authorized, placement of culverts and other structures in waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by the NCDWR. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. 17. If mulriple pipes or barrels aze required, they shall be designed to mimic natural stream cross section as closely as possible including pipes or ba�rels at flood plain elevation, floodplain benches, and/or sills may be required where appropriate. Widening the stream channel should be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. 18. If foundation test borings are necessary; it shall be noted in the document. Geotechnical work is approved under Genera1401 Certification Number 3883/Nationwide Permit No. 6 for Survey Activities. 19. Sediment and erosion control measures sufficient to protect water resources must be implemented and maintained in accordance with the most recent version of North Cazolina Sediment and Erosion Control Planning and Design Manual and the most recent version of NCS000250. 20. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of the NCDOT Construction and Maintenance Activiries manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 21. While the use ofNational Wetland Inventory (NWI) maps, NC Coastal Region Evaluation of Wetland Significance (NGCREWS) maps and soil survey maps are useful tools, their inherent inaccuracies requ've that qualified personnel perform onsite wetland delineations prior to permit approval. 22. Heary equipment should be operated from the bank rather than in stream channels in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into streams. This equipment shall be inspected daily and maintained to prevent contaminarion of surface waters from leaking fuels, lubricants, hydraulic fluids, or other toxic materials. 23. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. 24. Riparian vegetation (native trees and shrubs) shall be preserved to the maa�imum wctent possible. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. Thank you for requesting our input at this time. The NCDOT is reminded that issuance of a 401 Water Quality Certification requires that appropriate measures be instituted to ensure that water quality standards are met and designated uses aze not degraded or lost. If you have any questions or require additional information, please contact Dave Wanucha at (336)776-9703 or dave.wanucha@ncdenr.gov. Electronic copy only distribution: John Thomas, US Army Corps of Engineers, Raleigh Field Office Kristi Lynn Carpenter, NCDWR File Copy