Please see the attached PCN Cover Letter and PCN requesting authorization to perform maintenance dredging along the
old NCDOT Ferry Channel on the Ocracoke Island side. Also attached to this email are surveys depicting the area to be
dredged. If you have any questions or need any additional information please contact me.
Thank you,
Catherine Peele
Environmental Specialist
Ferry Division
252 305 7288 mobile
cdpeele@ncdot.gov
159 Lucinda Drive
Powells Point, NC 27966
� , � � �M �r �
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
i .'a'
Transportation
June 6, 2016
Tracey Wheeler
Regulatory Project Manager
US Army Corps of Engineers
2407 West Fifth Street
Washington, NC 27889
Mrs. Wheeler,
PAT McCRORY
Governor
NICHOLAS J. TENNYSON
Secretary
The attached Pre-Construction Notification (PCN) Form is to request a Nationwide 35 Permit to
perform maintenance dredge activities along a portion of the old North Carolina Ferry Division
"Short Route" channel that travels from the North end of Ocracoke Island to the South end of
Hatteras Island.
Dredging the proposed portion of the channel as depicted in the attached surveys will allow for the
safe passage of public and private fishing vessels as they travel through the Hatteras Inlet. Due to
the volatile nature of the Inlet and continuous shoaling there is not a safe or reliable route for
vessels to take that gains them access to deep water through the Hatteras Inlet.
Surveys were performed on June ls` of 2016 and show that approximately 40,000 cubic yards of
material will need to be excavated from the West end of the channel. The excavation will follow
the current permitted dimensions of 150' wide and a-12' depth. The length of this area is 600'.
Dredging operations will be completed by the NCDOT Ferry Division - Dredge Carolina, which is
a pipeline dredge. Dredging in this same vicinity was completed in early 2016.
Sincerely,
-�
,
I � ��`
��� ��� �
���
Catherine Peele
Environmental Specialist
NCDOT Ferry Division
�Nothing Compares:��_
State of North Carolina � Deparhnent of Transportation � Ferry Division
159 Lucinda Lane � Powells Point, NC 27966
252-491-2635 T
�"
`o��� V�t ATF�QG
� r
> �
o -�
Pre-Constru
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the I
Corps:
1 b. Specify Nationwide Permit (NWP) number: 35
1 c. Has the NWP or GP number been verified by
1 d. Type(s) of approval sought from the DWQ (cl
� 401 Water Quality Certification — Regular
❑ 401 Water Quality Certification — Express
1 e. Is this notification solely for the record
because written approval is not required?
1f. Is payment into a mitigation bank or in-lieu
of impacts? If so, attach the acceptance le
fee program.
1 g. Is the project located in any af NC's twenty
� below.
1 h. 15 the project located within a NC DCM Area
2. Project Information
2a. Name of project: Old NC St
2b. County: Hyde
2c. Nearest municipality / town: Ocracoke
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state 16.71044
project no:
3. Owner Infarmation
3a. Name on Recorded Deed: NCDOT F
3b. Deed Book and Page No. N/A
3c. Responsible Party (for LLC if Catherine
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
I Office Use Oniy:
Corps action ID no.
DWQ project no.
Form Version 1.0 November 2008
on Notification (PCN) Form
404 Permit � Section 10 Permit
or General Permit (GP) number:
Corps? � Yes
all that apply}:
❑ Non-404 Jurisdictional General Permit
❑ Riparian Buffer Authorization
❑ No
the record only for DWQ 401 � For the record only for Corps Permit:
❑ Yes � No
ogram proposed for mitigation
�m mitigation bank or in-lieu
❑ Yes ❑ No
❑ Yes � No
counties. If yes, answer 1 h � Yes ❑ No
mental Concern (AEC)? �� Yes ❑ No
erry Channel - Maintenance Dredging 2016
Division
159 Lucin a �.ane
Powells P in , NC 27966
252-305-7 8$
252-491-2782
cdpeele@t�cdot.gov
Page 1 of 12
PCN Form — Version 1.Q November 2008 Version
Section A. Applicant Information,
4. Applicant lnformation (if different from ow e
4a. Applican# is: � Agent ❑ Other, specify:
4b. Name: Catherine Pe I
4c. Business name N/A
(if applicable):
4d. Street address: 159 Lucinda a e
4e. City, state, zip: Powells Poin , C 27966
4f. Telephone no.: 252-305-728
4g_ Fax no.: 252-491-278
4h. Email address: cdpeele@nc o.gov
5. Agent/Consultant Information (if applicabl )
5a. Name: ��a
5b. Business name
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 12
PCN Form — November 2008 Version
B. Project Information and Prior Project H
1. Property Identification
1a. Properly identification no. (tax PIN or parcel I
1 b. Site coordinates (in decimal degrees):
1 c. Property size:
2. Surface Waters
2a. Name of nearest body of water (stream, river,
proposed project:
2b. Water Quality Classification of nearest receivi
2c. River basin:
3. Project Description
3a. Describe the existing conditions on the site
application:
This portion of the old NC Ferry Division ch
passengers from Hatteras to Ocracoke Isla
access point through Hatteras INet.
3b. List the total estimated acreage of all existing
1.0 acres
3c. List the total estimated linear feet of all existirn,
0
N/A
35.200365943`N - 75.784086777`W
25.0 acres
) to pamlico Sound
vater:
Pamlico Sound
general land use in the vicinity of the project at the time of this
was previously maintained and used for the transfer of automobiles and
�is route was also used by public and private fishing vessels as their
on the property:
(intermittent and perennial) on the property:
3d. Explain the purpose of the proposed project:
The purpose of this project is to dredge a po io of the old NC Ferry Division channel to allow the safe passage of public
and private fishing vessels through the Hatter s�nlet. Spoil will be pumped into Ocracoke Island Spoil Site.This area of
the channel was dredged in late 2015 into ea ly 016 under approval from appropriate agencies.
3e. Describe the overall project in detail, includin�
The NC Ferry Division Dredge Carolina will p
fishing vessels through the Hatteras Inlet. Th�
follow the current permitted dimensions of 15
material. The NC Ferry Division has a SUP w
barges, tug boat, booster pump, pipeline and
activities.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determi
"Corps or State been requested or obtained fc
project (including all prior phases) in the past
4b. If the Corps made the jurisdictional determirr
of determination was made?
4c. If yes, who delineated the jurisdictional area�
Name (if known):
4d. If yes, list the dates of the Corps jurisdictiona
5. Project History
e type of equipment to be used:
�rm maintenance dredging to allow the safe passage of public and private
is approximately 40,000 cubic yards to be removed. The excavation will
vide by a-12' depth. The spoil site on Ocracoke Island will hold this
the National Park Service to utilize this spoil site. A dredge, excavator,
ldozer will be used for site preparation and to perform the dredging
is by the
property / ❑ Yes � No ❑ Unknown
what type
� Preliminary ❑ Final
Agency/Consultant Company:
Other:
or State determinations and attach documentation.
5a. Have permits or certifications been request�o obtained for I� Yes ❑ No ❑ Unknown
this project (including all prior phases) in the a�t?
5b. If yes, explain in detail according to "help file'' instructions.
CAMA major permit 224-87 Expires 12-31-2b16 COE SAW-2014-00322 Expires March 18, 2017
Page 3 of 12
PCN Form — Version 1.0 November 2008 Version
B. Project Information and Prior Projlec�t History
6. Future Project Plans
6a. Is this a phased project? ❑ Yss � No
6b. If yes, explain.
Page 4 of 12
PCN Form — November 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for yo�
❑ Wetlands ❑ Streams - tri
� Open Waters ❑ Pond Consti
2. Wetland impacts
If there are wetland impacts proposed on the site,
2a. 2b. 2c.
Wetland impact
number — Type of Type of wetlan�
Permanent (P) or impact (if known)
Tem ora T
W1 ❑POT
W2 ❑POT
W3 ❑P�T
W4 ❑P�T
W5 ❑P�T
W6 ❑P�T
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream imp
question for all stream sites impacted.
3a. 3b. 3c.
Stream impact .Type of Stream name
number - impact
Permanent (P) or
Temporary (T)
S1 ❑P�T
S2 ❑P�T
S3 ❑P�T
S4 ❑P�T
S5 ❑P�T
S6 ❑P❑T
3h. Comments:
(check all that apply):
❑ Buffers
on
i complete this question for each wetland area impacted.
2d. 2e. 2f.
Type of jurisdiction
Forested (Corps - 404, 10 Area of impact (acres)
DWQ — non-404, other)
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Corps
❑ DWQ
❑ Corps
❑ DWQ
❑ Corps
❑ DWQ
❑ Corps
❑ DWQ
❑ Corps
❑ DWQ
❑ Corps
❑ DWQ
2g. Total wetland impacts
ncluding temporary impacts) proposed on the site, then complete this
3d.
Perennial (PER) or
intermittent (INT)?
3e. 3f.
Average stream width (feet) �mpact
length
(linear feet)
❑ PER ❑ INT
❑ PER ❑ INT
❑ PER ❑ INT
❑ PER ❑ INT
❑ PER ❑ INT
❑ PER ❑ INT
3g. Total stream and tributary Impacts
Page 5 of 12
PCN Form — Version 1.0 November 2008 Version
C. Proposed Impacts Inventory,
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, es
the U.S. then individuall list all o en water im ac
4a. 4b. 4c.
Open water Name of
impact number waterbody Type
— Permanent (if
(P) or applicable)
Tem ora T
01 � P � T Pamlico Soil Remov
5ound
02 ❑P�T
03 ❑POT
04 ❑P�T
4g. Comments: This area will be impacted from
tributaries, sounds, the Atlantic Ocean, or any other open water of
N.
4d. 4e.
�ct Waterbody type Area of impact (acres)
dredging � Sound
4f. Total open water impacts
ng the Old NC State Ferry Channel.
4
4.0
Page 6 of 12
PCN Form - November 2008 Version
C. Proposed Impacts Inventory, contini
5. Pond or Lake Construction
If ond or lake construction ro osed, then com
5a. 5b. 5c.
Wetland I
Pond ID Proposed use or
number purpose of pond
Flooded F
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, t
below. If any impacts require mitigation, the
6a.
Project is in which protected basin?
6b. 6c. 6d.
Buffer impact
number — Reason
Permanent (P) for impact Stream name
or Temporary
T
B1 ❑P(]T
B2 ❑POT
B3 ❑P�T
6h. '
6i. Comments:
the chart below.
5d. 5e.
cts (acres) Stream Impacts (feet) Upland
(acres)
Excavated Flooded Filied Excavated Fiooded
❑ No If yes, permit ID no:
complete the chart below. If yes, then individually list all buffer impacts
u MUST fill out Section D of this form.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
❑ Catawba ❑ Randleman
6e. 6f. 6g.
Buffer Zone 1 impact (square Zone 2 impact
mitigation feet) (square feet)
required?
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
�I buffer impacts
Page 7 of 12
PCN Form — November 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization I
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
ib. Specifically describe measures taken to avoidlorlminimize the proposed impacts through construction techniques.
2. Compensatory Mitigation for Impacts to
2a. Does the project require Compensatory Mi
impacts to Waters of the U.S. or Waters of
2b. If yes, mitigation is required by (check all that
2c. If yes, which mitigation option will be used for
project?
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: N!A
3b. Credits Purchased (attaCh receipt and letter)
3c. Comments:
4. Complete if Making a Payment to In-lieu F
4a. Approval letter from in-lieu fee program is att�
4b. Stream mitigation requested:
4c. tf using stream mitigation, stream temperatur
4d. Buffer mitigation requested (DWQ only):
4e. Riparian wetland mitigation requested:
4f. Non-riparian wetland mitigation requested:
4g. Coastal (tidal) wetland mitigation requested:
4h.. Comments:
5. Complete if Using a Permittee Responsibl
5a. If using a permittee responsible mitigation pl,
N/A
> of the U.S. or Waters of the State
for ❑ Yes � No
❑ DWQ ❑ Corps
❑ Mitigation bank
❑ Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
Type
m
Quantity
❑ Yes
linear feet
warm, cool, cold
square feet
acres
acres
acres
: Il�itigation Plan
n, provide a description of the proposed mitigation plan.
I Page 8 of 12
PCN Form — Version 1.0 November 2008 Version
D. Impact Justification and Mitigation, c�n�inued
6. Buffer Mitigation (State Regulated Riparian
6a. Will the project result in an impact within a prol
buffer mitigation?
6b. If yes, then identify the square feet of impact t�
amount of mitigation required.
Zone Reason for impact Tot<
(sq�
Zone 1
Zone 2
6c. If buffer mitigation is required, discuss what
permittee responsible riparian buffer restors
6d. Comments:
r Rules) — required qy DWQ
riparian buffer that requires ❑ Yes � No
zone of the riparian buffer that requires mitigation. Calculate the
npact Multiplier Required mitigation
� feet) (square feet)
3 (2 for Catawba)
1.5
Total buffer mitigation required:
of mitigation is proposed (e.g., payment to private mitigation bank,
payment into an approved in-lieu fee fund).
Page 9 of 12
PCN Form — November 2008 Version
E. Stormwater Management and Diffuse Fli
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to p
within one of the NC Riparian Buffer Protecti
1 b. If yes, then is a diffuse flow plan included?
2. Determination if the Project Requires a Si
2a. Does the project require a Non-404 Jurisdict
2b. Is the project subject to General Certification
3. Determination of Stormwater Review Juri
3a. Is this project subject to any of the following
management programs (check all that apply
If so, attach one copy of the approval letter f
approved stormwater management plan.
3b. In which local governmenYs jurisdiction is this
3c. Is this local government certified to implement
If so, attach one copy of the approval letter frc
of the approved stormwater management plar
Stormwater management plan stamped as ap
4. Information Required for DWQ 401 Unit Sto
4a. What is the overall percent imperviousness a
4b. Does this project contain any areas that meet
General Certifications 3704 and 3705?
4c. If the site is over 24% impervious and/or cont
stormwater management plan.
N/A
4d. Has a completed BMP Supplement Form
for each stormwater BMP?
(required by DWQ)
riparian buffers identified I� Yes ❑ No
?
General Permit?
or 3705?
I ❑ Yes ❑ No
Plan
❑ Yes � No
❑ Yes ❑ No
mplemented stormwater
DWQ and one copy of the
❑ Coastal counties
❑ HQW
❑ ORW
❑ Session Law 2006-246
❑ Other:
ate stormwater program? ❑ Yes
e locaf government and one copy
one copy of the approved
■ •
rater Review
�din to the most current site lan? N/A
criteria for "high density" per � Yes � No
high density areas, then provide a brief narrative description of the
required items been submitted � Yes � No
I� I
' Page 10 of 12
PCN Form — Version 1.0 November 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ
1 a. Does the project involve an expenditure of puqlic� (federal/state/local) funds or the
use of public (federaUstate) land? I
1 b. If you answered "yes" to the above, does the pro ect require preparation of an
environmental document pursuant to the requyre ents of the National or State
(North Carolina) Environmental Policy Act (N�P SEPA)?
� Yes ❑ No
❑ Yes � No
1 c. If you answered "yes" to the above, has the dbc ment review been finalized by the
State Clearing House? (If so, attach a copy of t e NEPA or SEPA final approval
' letter.) � ❑ Yes
Comments: '
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules'�1$A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ u�face Water or Wetland Standards, ❑ Yes
or Riparian Buffer Rules (15A NCAC 2B .020�)?�
2b. Is this an after-the-fact permit application?
2c. If you answered "yes" to one or both of the abo�
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (bas�d on past and reasonably
additional development, which could impact r�e;
❑ No
►1 .
❑ Yes � No
questions, provide an explanation of the violation(s): N/A
;ipated future impacts) result in I� Yes � No
downstream water quality?
3b. If you answered "yes" to the above, submit a qu�litative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "nd," �rovide a short narrative description.
�
N/A I
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods an� disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subjecf facility.
N/A I
� Page 11 of 12
� PCN Form — Version 1.0 November 2008 Version
F. Supplementary Information, continued
5. Endangered Species and Designated Critical
5a. Will this project occur in or near an area with
habitat?
5b. Have you checked with the USFWS concerning
impacts?
5c. If yes, indicate the USFVI/S Field O�ce you
labitat (Corps Requirement)
rally protected species or
ndangered Species Act
contacted.
� Yes ❑ No
❑ Yes � No
❑ Raleigh
❑ Asheville
5d. What data sources did you use to determine wh ther your site would impact Endangered Species or Designated Critical
Habitat?
As the past COE permit, and the current CAMA ermit, the spoil site is monitored by the NPS for Endangered shore
birds. Also, there are Sea turtles present in the �rea from time to time.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area desig
6b. What data sources did you use to determine
as essential fish habitat? �❑ Yes
your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (C'prps Requirement)
I
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having histOri or cultural preservation
status (e.g., National Historic Trust designatian r properties significant in
North Carolina history and archaeology)?
❑ Yes
�I .
7b. What data sources did you use to determine wh ther your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 1 Q-year floodplain?
8b. If yes, explain how project meets FEMA requirements:
i
8c. What source(s) did you use to make the floodpl�in determination?
Catherine Peele
Applicant/Agent's Printed Name
/1 - ■ •
I � ,
� � � ` June 6, 2016
Applicant/Agent's Signature
(Agent's �ignature is valid only if an authorization letter from the applicant Date
.,...;.�,,.� �
Page 12 of 12
PCN Form — November 2008 Version
�
�C
� m "'
� ��z
� �
� � O d �
Z y '�' Z
d m � D
z
o m '�mr
m ti � �
� �
� s ��z
ti �
N � r �
'� z°
�
z
x
a
-i �
C � � p O A�
n `�?� � � � �, °
A3 0- � . �'
Cn �.x yF � co Cd � a�
�F �Z y� ��. �.
�� �K �� o � � � d
�F �z vZ�c
�� �
x, �an���°-„
^t <� ;�r'- o J � � "3
z" "� U � °` � �
z� n o "`• c
z � � 'C
z O
a �
� o'
�
x
F�
r...'i-�
� n'
�
� � C -�7
cnT 3
��Z� � �C L s
9m �,o tony m p
�Nz,r� mo ��n `- -n
� �d
°�m � � j P �
loo {
_c
�y
00
�
NC GRID
NAD 83 NA 2011
KUTCS:
HORIZONTALDATUM-NAD 1983/NA2011.
VERTICAL DATUN[ = V DATUM = NORTH CAROLINA, PAMLIC SOUND
VERSION 01 ( 1983- 2001 )
PROJCCT SURVEYGD WITII THGNCDOTLOCATION AND SURVEYS BOAT,
USING VRS AND GNSS FQUIPMSNT W1TH CODA OCTOPUS/F175 IMU AND
PDGE'TECH 6205 SOUNDIhG EQUIPMGNT.
DATA SHOW.\' ON THIS �IAP RF,PRF,SFNTS THE RF.SULT OF THE SURVEYS
�nn�e ov rHe onres iw�ia�i eo nno arraesF.Nr coNnn ioNs exisnrvc
AT TI-IAT TI.YIE.
NAVIGATION A[DS WERE LOCATED FROM APR1L 26, 201(, SURVEY (-/- 30 SFT).
MLLW=MEANLOWERLOW WATER
- _ � «�
�_ ;�a .; .4 ..>�
. ., s .. /� y `
)� �" ����,..�.�.t_
16.6 15.0 11.4 6.6 4.3 4.1 5.7 6.8 7.0 8.7 10.3
D.11 � M ;
(1RIDS STAT6PLANENAD-83
GU�N.=NC-3200 NOR"CH CAROLINA
DItiT.qNCF'� liN1T - liS SURVI;Y �OOT
DI PI I-1 UNI'� - US SURVEY FOO"C
I I LIPSOID-WGS84
G I.OI D MODEL = G2012a CO V US
V DATUM NORTH CAROLINA, PAMLfC SOUND
VERSION 01 ( 1983 - 2001 ) MLLW
VOI
17.6 4.7 5.3 6.2 7.4 8.3 8.7 1. 10.1
�s,� ,
I 0-00.00 23 i 52.69
17.6 16J 12.9 10.4 6.2 5.9 6.3 1.8 11.0
16.9 17.0 14.9 6.9 7.2 6.6 7.1 10.1
S01 ' /
1 � � S02
16.5 18.5 16.0 I1.] 7.3 5.6-- :_ _ . -- . - 5.9 6.1 6.3 6,4 $8 8.
SS� ' - _ _
16.4 17.5 17.]
ALL DEPTHS ARE MEAN LOWER LOW WATER
TOTAL VOLUME TO BE REMOVED = 65,301 CU YDS
I50 100 50 0 100 200 500
GI. APIIIC SCAIJ�
]1.� 11.5 10.
10.6\ 1
DEPTHS IN FF,P:T
_ MLLW
<011u
o.uu-o,�y
1.011- 1.19
ZO(1-2 4v
3.00-399
4.00 - 4.U<l
�oa-���
6.OU - 6.99
7.OU - 7.9)
H ����_ H �v
9.00 - 9.)9
I � 1IU - I fl.`J`�
iiuu-ii-��,
����,-������
13.(JO - I ;.v9
ia.oa - i+e��
_ - ' U.00
•,K`t. 4 S P
10.5 10.8 10.3 IO.I � � 11 1� �. �
\ 3
9.8 9 10.� I1.1 11. 1.9
29+1039
6,5 8. 10.2 10.6 11.3 10.7 11.6 11.7 11.8 12.1
8.5 9.7 9.9 10.5 10.7 11.2
so�
C11ANNliL .4LIGNAIEN7' AND W'AY PO1N7:S ARE NOT CHANGED
FROM APRIL 26, 2016 ADJUSTil1ENT.
NAV-A[DS ARE IN APPROXIMATE SAME POSITION.
W'AYPOINTS ALO�.�'C BOTTOIDI OF RGVISED CHANNGL 2016-0446
Waypnint La[itudc 1.ongiWdc NCSPC R3/2011
NOl 35J9R154351 N 75.783 13 02 73 W N 54?674A536 E?9(i0f37.9503
NO2 35.197929840 N 75J785552�2 W N 542577.0993 E 2962?06.6163
NO3 35.1972046A9 N 75.776908H94 W N?423292869 G 2962706.7639
N04 35.19660')253 N 75.766R47179 W N i12210A261 � 296i� 18.0992
NOS 35J9G88?703N 75J636846I?W N54Z340.6746 E2966659.1546
SO1 35.197742933 N 75]R3760226 W n 542464.i085 E 2960833.RS87
S02 35.197523fi31 N 7J.77 8 6 95 43 0 W h' S�12422i.05�7 F: 2962169.56A7
S03 35.19G799924 N 75777D51866 W A' S42180.tibG4 E 2962668.8564
SO4 35.196195537 N 7576683A874 W N 542060.0179 B 2965725.4813
SOS 35.196492R78 N 75]63632023 W N 542192.0910 E 2966699.7196
REVISEU UHSIGN CE�'fE12LINE ALICNM6N'1' 2015-04-2fi
St tlon Latltude Longitude NC SPC N3/2011
10+00.00 75.199948642 N 757R31452A9 W N 543539.4R06 F. 2960%3�9042
23+53.69 35.1 9 7 72683 5 N 75.778625346 W N 542502.5770 L 29G2188.0905
?y+103) 35.1)7002306 N 75J76980380 W N 5422549767 E 2)62687.8102
59+46.73 35.1 9 640 23 95 N 757fi6843025 W N 543135.2220 H 2965721 J903
69+03.4] 35.196677760 N 7576365R31 R W N 5322663R38 6 2966669.4371
DANGE2 SIGN
35.19»49671 N 75J73054049 W N�41764.6786 F.2963R773AOR
NAVIGA7'IONAIDS 2016-04-26 +/-30'
MLL�Y
:�tarkcr Lati[udc Longitudc NC SPC 83/2U1I Dcp[h
I SF 35. L9G336475227 N 75764G I4573698 W N 542132. 8 296G387. 4'
2SF 35.196RRA6U0710N 75]6512Rfl05248W N54232R. E2966227. h'
4Sh 45.19fi458(R01.8 N 95 76919330}gl8 W N 54 I� H:2965019. II'
4S� 35.19729R817743 N 75 775620860465 W N 542 7G R 296109Q I I'
�Sh 35.1971976J5058 N 75779065119719 W N 54�305 E 2962063. 6'
[SP 35.19R4375J3889 N 75]81891015976 W N S4� 729. E 2961204. 5'
�,�TT�k.,s ����T
D1RI' ((ll'��TY tiURVF.Y
rao� osto i vric �� sccnon
� � 11 �I IWI�NI.( N111�.12 � �
iz oErrn
i� ��
; I- i`o' -I
1.4 10.7
Nnv�caTion n��s
1/ CAN
0
• �IJN
a
�GALL.N LLGH"fCD
6UOY
�RLD LIGHTL�D
RUOY"
� JUNC'I'ION MARKER
� GREEN LIGHT
� REDLf(illT
� (iRF.FN �JAY RF.ACY)N
. LLk.0 UAY HL:ACON
• iNr�nr,a¢i_r_ ouov
• WAYPOIN"C
Q DANGER SIGN
Q MILEBOARD
� 'iIDC GUACiC
�-1:1T('I-1 L.N[
�
z
.�C'i
U
Q
�
7 11.6
DANGER
SIGN