HomeMy WebLinkAbout20150288 Ver 1_Site Inspection_20160526Wetland Inspection Report
Project Num: 20150288
Project Name: NCDOT - Bridge 281 on SR 25�
County: Rowan
Location: NCDOT - Bridge 281 on SR 2538 (BD-5109Z)
Latitude: +35° 36' 56"
SW Plan Location
Site Owner Name NC DOT Division 9
Inspection Date: 5/26/2016
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: � Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
� Permit (401 WQC)
Inspection Summary:
Version: 1 Status: Issued
Project Type: Replace bridge with culvert
Region: Winston-Salem
Title:
❑ Not Compliant
Longitude: -80° 31' 24"
Phone:
Phone: 336-776-9703
Asked if a small amount of matting and seeding could be done along the utility easement to help stabilize the bank
where shear stress is significant. DOT would ask if it could be done.
page: 1
Site Number: 20150288
Inspection Date: 5/26/2016
Owner: Tippett, Lyndo
Inspection Type: Site Inspection (DOT)
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment: All barrels were backfilled and riprap placed as permitted.
Reason for Visit: Routine
Yes No NA NE
� ❑ ❑ ❑
� ❑ ❑ ❑
� ❑ ❑ ❑
page: 2