Loading...
HomeMy WebLinkAbout20150288 Ver 1_Site Inspection_20160526Wetland Inspection Report Project Num: 20150288 Project Name: NCDOT - Bridge 281 on SR 25� County: Rowan Location: NCDOT - Bridge 281 on SR 2538 (BD-5109Z) Latitude: +35° 36' 56" SW Plan Location Site Owner Name NC DOT Division 9 Inspection Date: 5/26/2016 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Version: 1 Status: Issued Project Type: Replace bridge with culvert Region: Winston-Salem Title: ❑ Not Compliant Longitude: -80° 31' 24" Phone: Phone: 336-776-9703 Asked if a small amount of matting and seeding could be done along the utility easement to help stabilize the bank where shear stress is significant. DOT would ask if it could be done. page: 1 Site Number: 20150288 Inspection Date: 5/26/2016 Owner: Tippett, Lyndo Inspection Type: Site Inspection (DOT) Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: All barrels were backfilled and riprap placed as permitted. Reason for Visit: Routine Yes No NA NE � ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ page: 2