Loading...
HomeMy WebLinkAbout20071881 Ver 1_DCM Permit_20160223 (2)it ;ER PIPE, 52 Ft LONG 1SURNG THAT D9TUSEF ER DETAIL THIS SHEET 7.87 FLOOD ZONE (AE) — 7.47 5OYr SWI. — 5.87 10Yr SWL — 2.77 HIGH OBSERVED — 0.87 NAVD (1988) — 0.0 DATUM NGVD (1929) —1.38 LOW OBSERVED — STILL WATER LEVELS (SWL) FROM FEMA FIS 37053CV000A, 12/16/2005 FLOOD ZONE (AE) FROM FEMA MAP 37209829DOJ, 12/16/2005 OBSERVED WATER LEVELS BASED ON RECORDING STATION AT ELIZABETH CITY MARINERS WHARF PARK (EMWN7) w/ EPOCH OF 8/1/2013 — 12/15/2015 ELEVATIONS ARE E)PRESSED IN FEET WATER LEVEL DATUM PARTIALLY BURY PIPE PRIOR TO PLACEMENT OF SAND BAG SAND BAG COVER SECTION 3/44- 1'-0r o .L y f f r, R yee' Yer � C R YM' R '17I' IQ 'fir PROJECT AREA 35' 51' 48' N 78' 46' 42' W 0 41 s • f ON LOCATION MAP Of, LANDING i NO SCALE C) gL , k V ) cl- Z I— Q U O � � � U J Z � z � � 0 o Q � clfO Z � � W N Q m v wom rim TALL AT LOCATIONS ACED, TYp ,OCATION TO BE INED AFTER ;TING PIPE h IAG WORK RE -INSTALL WARN SIGNS, SEE DETAIL 12"0 TIMBER PILES — RE-INTALL TO EXISTING PENETRATION, TTP -5- -10— - - - 5'x10' FILLED SAND BAGS (1.5CY MIN) AT 8 FEET CTRS ORIENTED AS SHOWN INSTALL AFTER 14' PIPE WORKING FROM TEE TO ENDS OF PIPE. NEW SAND BAG TYP RE -LOCATED 14"0 HDPE PIPE ON MUDUNE PROVIDE LOW PRESSURE WATER JETTING —� AS NECESSARY TO REALIGN PIPE AT POINT EXITING MUDLINE TO PROVIDE A CURVED BEND RADIUS GREATER THAN 350 FEET ELEVATION TO LAND NEAR NEWBERN LANDING ROAD 5'x10' FULLED SAND BAGS (1.5CY MIN) AT 10 FEET CTRS ORIENTED AS SHOWN BEGIN PIPE LOWERING k BAG PLACEMENT AT THIS END AND PROCEED TOWARDS DIFFUSER 0 -5 --------- - EXISTING MUDLINE -10 RE -INSTALLATION PLAN & ELEVATION 1"=10'(H) / 1'=10'(V) m r- P: a w w 4 z 0 ol s w m DRAWN BY CHECKED BY DATE 1/12/2016 SCALE AS NOTED SHEET NO. MA -1 OF 1