HomeMy WebLinkAbout20071881 Ver 1_DCM Permit_20160223 (2)it
;ER PIPE, 52 Ft LONG
1SURNG THAT D9TUSEF
ER DETAIL THIS SHEET
7.87 FLOOD ZONE (AE) —
7.47 5OYr SWI. —
5.87 10Yr SWL —
2.77 HIGH OBSERVED —
0.87 NAVD (1988) —
0.0 DATUM NGVD (1929)
—1.38 LOW OBSERVED —
STILL WATER LEVELS (SWL) FROM
FEMA FIS 37053CV000A, 12/16/2005
FLOOD ZONE (AE) FROM FEMA MAP
37209829DOJ, 12/16/2005
OBSERVED WATER LEVELS BASED ON
RECORDING STATION AT ELIZABETH CITY
MARINERS WHARF PARK (EMWN7) w/
EPOCH OF 8/1/2013 — 12/15/2015
ELEVATIONS ARE E)PRESSED IN FEET
WATER LEVEL DATUM
PARTIALLY BURY PIPE PRIOR
TO PLACEMENT OF SAND BAG
SAND BAG COVER SECTION
3/44- 1'-0r
o
.L y f
f r,
R yee' Yer �
C
R YM'
R
'17I'
IQ 'fir
PROJECT AREA
35' 51' 48' N
78' 46' 42' W
0 41
s •
f
ON
LOCATION MAP
Of,
LANDING
i
NO SCALE
C)
gL ,
k
V )
cl-
Z
I—
Q
U
O
�
�
�
U
J
Z
�
z
�
�
0
o
Q
�
clfO
Z
�
�
W
N
Q
m v wom rim
TALL AT LOCATIONS
ACED, TYp
,OCATION TO BE
INED AFTER
;TING PIPE h
IAG WORK
RE -INSTALL WARN
SIGNS, SEE DETAIL
12"0 TIMBER PILES —
RE-INTALL TO EXISTING
PENETRATION, TTP
-5-
-10— - - -
5'x10' FILLED SAND
BAGS (1.5CY MIN)
AT 8 FEET CTRS
ORIENTED AS SHOWN
INSTALL AFTER 14'
PIPE WORKING FROM
TEE TO ENDS OF PIPE.
NEW SAND BAG
TYP
RE -LOCATED 14"0 HDPE PIPE
ON MUDUNE
PROVIDE LOW PRESSURE WATER JETTING —�
AS NECESSARY TO REALIGN PIPE AT
POINT EXITING MUDLINE TO PROVIDE A
CURVED BEND RADIUS GREATER THAN 350 FEET
ELEVATION
TO LAND NEAR
NEWBERN LANDING
ROAD
5'x10' FULLED SAND
BAGS (1.5CY MIN)
AT 10 FEET CTRS
ORIENTED AS SHOWN
BEGIN PIPE LOWERING
k BAG PLACEMENT AT
THIS END AND PROCEED
TOWARDS DIFFUSER
0
-5
--------- -
EXISTING MUDLINE -10
RE -INSTALLATION PLAN & ELEVATION
1"=10'(H) / 1'=10'(V)
m
r-
P:
a
w
w
4
z
0
ol
s
w
m
DRAWN BY
CHECKED BY
DATE
1/12/2016
SCALE
AS NOTED
SHEET NO.
MA -1
OF 1