HomeMy WebLinkAbout20151306 Ver 1_USACE Permit_20160520
Wanucha, Dave
From:Kichefski, Steven L SAW <Steven.L.Kichefski@usace.army.mil>
Sent:Friday, May 20, 2016 8:02 AM
To:Slaughter, Johnathan H
Cc:Wanucha, Dave
Subject:RE: SAW-2016-00979 NWP #3 (NCDOT/SR1307/Bridge19/17BP.11.R.115/Div11)
(LIBP)
Heath,
On December 15, 2015, the US Army Corps of Engineers, Wilmington District received your written notification that you
intend to replace NCDOT Bridge #19 with a new bridge. The specific location where the work is planned is on SR 1307
(Mountain Park Road) over the South Fork Mitchell River, 0.59 mile south of its intersection with Noah Hayes Road in
Surry County, North Carolina. The geographic coordinates (in decimal degrees) are 36.35314° N and 80.85121° W. Your
notification indicated that you intend to temporarily impact 27 linear feet of jurisdictional stream channel associated
with dewatering activities during the removal of the existing interior bent.
Based on the information provided in your application, including Attachment G (Low/Minimum Impact Bridge Project
Data Sheet) of the 2010 Low Impact Bridge Replacement Document, your work is authorized by Nationwide Permit
(NWP) 3 for Maintenance Activities provided it is accomplished in strict accordance with the attached conditions,
Attachment J (Standard Recommendations of Small Bridge Replacements in Trout Waters) and your submitted
description. Any violation of the attached conditions or deviation from your submitted description may subject the
permittee to a stop work order, a restoration order and/or appropriate legal action. Attached is a copy of the NWP 3
and the applicable permit conditions. This verification is valid until the NWP is modified, reissued, or revoked. All of the
existing NWPs are scheduled to be modified, reissued, or revoked prior to March 18, 2017. It is incumbent upon you to
remain informed of changes to the NWPs. We will issue a public notice when the NWPs are reissued. Furthermore, if you
commence or are under contract to commence this activity before the date that the relevant nationwide permit is
modified or revoked, you will have twelve (12) months from the date of the modification or revocation of the NWP to
complete the activity under the present terms and conditions of this nationwide permit. The Action Identification
Number for this project is SAW-2016-00979.
The established surrogate consultation procedure with the USFWS regarding the Northern eared-bat (NLEB) was utilized
for this project.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality
Certification. You should contact the NC Division of Water Quality (telephone: 919-807-6300) to determine Section 401
requirements.
This response to your notification does not relieve the permittee of the responsibility to obtain any other required
Federal, State or local approvals/permits.
This electronic copy is your official Department of the Army Notification; no paper copy will be mailed, unless specifically
requested.
Please let me know if you have any questions regarding this permit or the conditions. You can call me at telephone
(828) 271-7980, ext 234 or contact me via e-mail at steven.l.kichefski@usace.army.mil.
Regards,
1
Steve Kichefski
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District, Asheville Field Office
151 Patton Avenue, Suite 208
Asheville, NC 28801
(828)-271-7980 Ext. 234
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at our website at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 to complete the survey online.
2