HomeMy WebLinkAboutNCG020172 DMR SW (2)ANNUAL SUMMARY DMR - STORMWATER
SEND TO- CENTRAL OFFICE
STORMWATER DISCHARGE OUTFALLS (SDO)
GENERAL PERMIT NO. NCG020000
*Report ALL STORMWATER.Monitoring,Data ,on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH 1 of each year.
CERTIFICATE OF COVERAGE NO. NCG020172 SAMPLE COLLECTION YEAR: 2015
FACILITY NAME: Vulcan Construction Materials, LP/Cabarrus Ouarry COUNTY Cabarrus
PERSON COLLECTING SAMPLES: Ricky Cooper PHONE NO. 704 788-7833
CERTIFIED LABORATORY:Research & Analytical Labs Lab #34 ADD TO LISTSERVE? YES ❑ NO ❑ EMAIL:
Lab #
Part A: Stormwater Monitorinn Reauirements
Outfall
No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in
Tier 2 Total Flow
Sampling2 (MG)
Total Suspended
Solids
(mg/1)
Turbidity
(NTU)
Settleable
Solids (ml/1)
Total Event
Rainfall Duration
(in) (minutes)
-
-
-
- -
1001"
See Footnote '
0.1
002
03/30/15
0.185
<5.0
3.75
<0.1
0.26 82
005
02/09/15
0.158
11.0
22.5
<0.1
0.23 45
005
11130/15
0.356
9.6
12.2
<0.1
0.52 855
002
11130/15
0.385
13.0
16.5
<0.1
0.52 855
004
No Flow for 2015
FEB 2 312016
r'r i r,
1«
'If "NO FLOW'or or "NO DISCHARGE, Enter "NO FLOW'or or "NO DISCHARGE" for each outfall here and the Date Range.
2 Per NCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range
3 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit.
4 TSS benchmark values are 100 mg/1 except in ORW, HWQ, trout, and PNA waters where they are 50 mg/1.
5 The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated
as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO.
Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO.
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month on average
Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11
Page 1 of 2
Outfall Date Sample
No. Collected
(mo/dd/yr OR
NO FLOW)
In Tier 2 # of Months
Monthly in Tier 2
Monitoring? Sampling2
(y/n)
New Motor Total Flow TPH using method
Oil Usage (MG) 1664A SGT -HEM
(al/month) (Ing/1)
_ _ 155
Total Suspended
Solids
(m )
1003,46-9
pH Total Event
(Standard Rainfall Duration
Units) (in) (minutes)
003 No Flow 1/1/15-
12/31/15
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES
AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)?
HAVE YOU CONTACTED THE REGION?
WHO AT THE REGION HAVE YOU SPOKEN WITH?
YES [:]NO X
YES ❑ NO ❑
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE" & LIMIT
VIOLATIONS) BY MARCH 1 OF EACH YEAR TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6300
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed
to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
February 8.2016
(Signature ofe ' 'tee) (Date)
Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11
Page 2 of 2