Loading...
HomeMy WebLinkAbout20140090 Ver 3_Site 10 SW and NPDES records_20160513Wetland Inspection Report Project Num: 20140090 Version: 3 Status: Issued Project Name: NCDOT- US 158 (U-2579B) Project Type: Road County: Forsyth Region: �lanston Salem pair/improvemen Location: NCDOT- US 158 (U-2579B) Latitude: +36° 07' Longitude: -80° 07' 55" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 5/9/2016 Reason for Inspection Routine Inspection Type: Records/File Review (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Title: Phone: Facility Compliance Status: � Compliant ❑ Not Compliant Program Areas: NPDES SW - Roadway (DOT) Question Areas: � Operation and Maintenance Inspection Summary: Phone: 336-776-9703 NCDOT instructed the contractor to make repairs to EC/SW measures and increase the number of slope drains along the fill at Site 10. page: 1 Site Number: 20140090 Inspection Date: 5/9/2016 Owner: Thorpe, Gregory Inspection Type: Records/File Review (DOT) Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Are the inspection and maintenance records complete and available for review? Reason for Visit: Routine Yes No NA NE ❑ � ❑ ❑ � ❑ ❑ ❑ Comment: It was determined that SW measures were not installed as required by the EC Plan. The NPDES records were in order except that several urgent items had not been addressed within the timeframe allocated as noted in the previous weeks report. It was explained that all problems areas were currentiv being worked on. page: 2