Loading...
HomeMy WebLinkAbout20140090 Ver 3_Site 10 and 18_401 Inspection_20160513Wetland Inspection Report Project Num: 20140090 Version: 3 Status: Issued Project Name: NCDOT- US 158 (U-2579B) Project Type: Road County: Forsyth Region: �lanston Salem pair/improvemen Location: NCDOT- US 158 (U-2579B) Latitude: +36° 07' Longitude: -80° 07' 55" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 5/9/2016 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Title: Phone: Facility Compliance Status: ❑ Compliant � Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Phone: 336-776-9703 A follow up inspection will be conducted on May 17 to determine if EC measures are in place and if sediment was removed from the channel adequately. page: 1 Site Number: 20140090 Owner: Thorpe, Gregory Inspection Date: 5/9/2016 Inspection Type: Site Inspection (DOT) Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Reason for Visit: Routine Yes No NA NE � ❑ ❑ ❑ � ❑ ❑ ❑ ❑ � ❑ ❑ Comment: Site 10 was reviewed for sediment loss reported on Mav 3. Clean up was underwav. It was determined that there were too few slope drains installed per the EC plan, which in turn, was a contributinq factor in the loss. This is in violation of NCDOT's 401 Certification related to erosion and sediment control practices. A Notice of Violation was issued on Mav 9, 2016 for Site 10. Site 18 was reviewed. Sediment was deposited near the inlet of the overtlow barrel due to a failure of a sediment control fence. The Site was repaired satisfactorilv and sediment was removed from the iurisdictional channel. page: 2