HomeMy WebLinkAbout20150751 Ver 1_Corps correspondence_20150814Ward, Garcy
From: Willis, Thomas C
Sent: Friday, August 14, 2015 10:12 AM
To: Wheeler, Tracey L SAW
Cc: Daisey, Greg; Ward, Garcy
Subject: RE: Bridge 36 Hyde County (UNCLASSIFIED)
Attachments: IMG_1732.JPG; IMG_1733.JPG; IMG_1734.JPG; IMG_1735.JPG; IMG_1736.JPG; IMG_
1737.JPG; IMG_1738.JPG
Tracey,
Attached are some photo's of the aerial power line that crosses over the road, which is in conflict. There is also an aerial
cable/phone line that crosses over Smith Creek, which is not in conflict.
There aerial power line is about 25 ft. above the water surface and the phone cable line is about 12 feet above the water
surface. The plans do not propose to move cable/phone line (12ft. clearance) at all. The power line will be temporarily
moved over, as shown on the plans, so it doesn't cross the road right in the work zone. Once the project is complete, the
power line will be relocated back to its original location.
Let me know if you need anything else.
Thanks,
Gay
-----Original Message-----
From: Wheeler, Tracey L SAW [mailto:Tracey.L.Wheeler@usace.army.mil]
Sent: Tuesday, August 11, 2015 4:19 PM
To: Willis, Thomas C
Subject: RE: Bridge 36 Hyde County (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Do you know the vertical clearance? (I have to ask because we've had a very small number of conflicts with dredges or
sailboat masts. I know there won't be a sailboat up here, but I can't close it in the database without the info.)
Tracey L. Wheeler
Regulatory Project Manager
U.S. Army Corps of Engineers
Washington Regulatory Field Office
2407 West 5th Street
Washington, North Carolina 27889
(910) 251-4627
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message-----
From: Willis, Thomas C [mailto:tcwillis@ncdot.gov]
Sent: Tuesday, August 11, 2015 3:44 PM
To: Wheeler, Tracey L SAW
Cc: Ward, Garcy
Subject: [EXTERNAL] RE: Bridge 36 Hyde County (UNCLASSIFIED)
All they are proposing to do is place one temporary power pole on the southwest corner(shown on the plans). This will
allow them to move the aerial power line away from the bridge work. There is no boring of utilities, only the aerial
power line temporary relocation. Let me know if you have any more questions.
Thanks
Gay
-----Original Message-----
From: Wheeler, Tracey L SAW [mailto:Tracey.L.Wheeler@usace.army.mil]
Sent: Tuesday, August 11, 2015 12:04 PM
To: Willis, Thomas C
Cc: Ward, Garcy
Subject: Bridge 36 Hyde County (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Hey Clay,
Trying to get the NWP 3 and 12 issued for this project, but there are no utility details on the plans. Do you know how
deep they will be buried? Do you have a cross section showing the lines? Thanks! Tracey
Tracey L. Wheeler
Regulatory Project Manager
U.S. Army Corps of Engineers
Washington Regulatory Field Office
2407 West 5th Street
Washington, North Carolina 27889
(910) 251-4627
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
BLOCKEDcorpsmapu.usace.army.mil/cm_apex/f?p=136:4:OBLOCKED.
Classification: UNCLASSIFIED
Caveats: NONE
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
Classification: UNCLASSIFIED
Caveats: NONE