Loading...
HomeMy WebLinkAbout20150708 Ver 1_CAMA refinement_20151023 Carpenter,Kristi From:Brittingham, Cathy Sent:Friday, October 23, 2015 12:40 PM To:Willis, Thomas C; Williams, Paul C Cc:Daisey, Greg; Tracey Wheeler (Tracey.L.Wheeler@usace.army.mil); Ward, Garcy Subject:Bridge 56 over Long Shoal River on US 264, Dare & Hyde Counties, CAMA Permit No. 111-15 refinement Attachments:Bridge 56 LOR.pdf Hello, Please find attached a Letter of Refinement for CAMA Major Permit No. 111-15 regarding changes in the length of the MCNC bore, and additional temporary Coastal Wetland impacts associated with the connection of the proposed Century Link fiber line to an existing vault. A paper copy will be sent by U.S. mail to NCDOT. If anyone else copied on this e-mail would like a paper copy, please let me know. Please let me or Greg Daisey know if you have any questions or concerns. Sincerely, Cathy Brittingham Cathy Brittingham, Transportation Project Coordinator N.C. Division of Coastal Management (919) 707-9149 phone cathy.brittingham@ncdenr.gov Mailing Address: : c/o DWR Wetlands Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Physical Address: 512 North Salisbury Street Archdale Building th 12 Floor, Room 1204G Raleigh, NC 27604 Please visit www.nccoastalmanagement.net to subscribe to Coastal Management’s quarterly newsletter, the CAMAgram. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties 1 3 Environmental Quality October 23, 2015 Clay Willis Division One Environmental Supervisor NC Department of Transportation 113 Airport Drive, Suite 100 Edenton, NC 27932 PAT MCCRORY c��«.,��,� DONALD R. VAN DER VAART srurrory RE: Refinement of CAMA Major Development Permit No. 111-15, Replacement of Bridge #56, over Long Shoal River on US 264, Dare & Hyde Counties. Dear Mr. Willis: This letter is in response to your request dated October 20, 2015, including the attached drawing (1): dated as received on October 20, 2015. The letter requests approval for changes in the length of the MCNC bore and additional temporary Coastal Wetland impacts associated with the connection of the proposed Century Link fiber line to an existing vault: During an on-site meeting with NCDOT, representatives from MCNC requested to extend the proposed bore another 250' to the north in order to ensure auoidance of a guazdrail in the project area. This will result in the MCNC bore increasing from approximately 550' to 800' in length. No additional surface water or wetland impacts aze requested or anticipated with the request to extend the MCNC bore. During an on- site meeting with NCDOT, representatives with Century Link requested the ability to connect the new fiber line to an existing connection vault located in Coastal Wetlands. Contractors will need to hand dig a 1' — 2' wide trench (approximately 1' deep) in Coastal Wetlands to access the existing vault and make the new connection. There will be no new permanent impacts associated with this utility work and it is all within the existing footprint of the existing vault and existing buried line. The proposed hand trenching of the Century Link fiber line to the existing vault will result in approximately 20 sq. ft. of temporazy Coastal Wetland impacts within the delineated wetland boundary. Please be advised that through this Letter of Refinement, the N.C. Division of Coastal Management (DCM) conveys its determination that the change in length of the MCNC bore and the additiona120 sq. ft. of temporary Coastal Wetland impacts associated with the Century Link connection to the existing vault through hand trenching as described in your request dated October 20, 2015 is consistent with existing State rules and regulations and is in keeping with the original purpose and intent of CAMA Majar Permit No. 111-15. '!'Nothing Compares -�� State of North Carolina � Environmental Quality 1367 US Hwy 17 South � Elizabeth City, NC 27909 252-264-3907 � 252-2643723 [fax] CAMA Major Permit No. 111-15 Refinement Letter October 21, 2015 Page 2 of 2 This letter shall be attached to the original of CAMA Permit No. 111-15, which was issued on October 9, 2015, and both documents shall be readily available on site when a DCM representative inspects the project for compliance. All conditions and stipulations of the active permit remain in force unless altered herein. This approval does not eliminate the need to obtain any additional permits, approvals or authorizations that may be required. Please contact Greg Daisey at (252) 264-3901 ext. 249 if you have any questions or concerns. Sincerely, . �,.�- v H,•� _ Doug Huggett Major Permits and Consistency Coordinator N.C. Division of Coastal Management cc: Jonathan Howell, NCDCM Greg Daisey, NCDCM Cathy Brittingham, NCDCM Tracey Wheeler, USACE Garcy Ward, DWR Mike Bryant, USFWS