Loading...
HomeMy WebLinkAbout20150522 Ver 1_401 Inspection_20160429Wetland Inspection Report Project Num: 20150522 Project Name: NCDOT - Replace Bridge 58 on County: Stokes Location: NCDOT - Replace Bridge 58 on US 311 Latitude: +36° 20' 57" SW Plan Location Site Owner Name NC DOT Division 9 Inspection Date: 4/27/2016 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Version: 1 Status: Issued Project Type: Replace bridge with culvert Region: Winston-Salem Title: ❑ Not Compliant Longitude: -80° 02' 16" Phone: Phone: 336-776-9703 page: 1 Site Number: 20150522 Inspection Date: 4/27/2016 Owner: Tippett, Lyndo Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑ Are the culverts and/or filled areas installed properly? �❑❑❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑ Comment: The culvert is still under construction. Backfillinq of all three barrels is rouqhly half complete. Bridqe has not been removed vet. EC measures are in place. page: 2