HomeMy WebLinkAbout20160110 Ver 1_Emails_20160425 (2)Carpenter,Kristi
From: Ridings, Rob
Sent: Monday, April 25, 2016 10:15 AM
To: Murray, Christopher A
Cc: Carpenter,Kristi; Alsmeyer, Eric C SAW
Subject: RE: NCDOT Division 5 permit application for widening of Rogers Road (SR 2052) and
replacement of Bridge No. 910132 over Smith Creek in Wake Forest, Wake County;
TIP/W BS: 17 B P.S. R.47
Chris,
This looks fine. Definitely prefer the stable long-term solution for Site 1. The Site 2 changes are fine too. I don't think
we need a modification since impacts are the same.
Kristi Lynn—please put the emails with drawing and pictures in the Lazerfiche folder for this project for records.
Thanks
Rob Ridings
Environmental Specialist
Transportation Permitting Unit, Division of Water Resources
NC Department of Environmental Quality
919-707-8786 office
rob.ridings@ncdenr.gov
512 North Salisbury Street, 12th Floor
1617 Mail Service Center
Raleigh, NC 27699
�"� �""",�'""����i�� t��+r���r�� �� �
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Murray, Christopher A
Sent: Monday, April 25, 2016 9:59 AM
To: Alsmeyer, Eric C SAW <Eric.C.Alsmeyer@usace.army.mil>; Ridings, Rob <rob.ridings@ncdenr.gov>
Cc: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>
Subject: RE: NCDOT Division 5 permit application for widening of Rogers Road (SR 2052) and replacement of Bridge No.
910132 over Smith Creek in Wake Forest, Wake County; TIP/WBS: 17BP.5.R.47
Reference:
NCDENR-DWR Project Number: 20160110 (Issued on March 4, 2016)
Eric and Rob,
The Department applied for a permit for this project on February 4, 2016. The NCDENR-DWR issued certifications for
the project on March 4, 2016. Two construction issues have come up at this time. Note the following:
Issue at Site 1(Bridge near 21+00 -L-)
A portion of the project limits at the bridge is located within the Smith Austin Creek Mitigation Site and this use requires
coordination with the North Carolina Interagency Review Team. An existing rock cross vane installed as part of the
mitigation site is located directly at the outlet of proposed standard v ditches upstream of the bridge. The Department
proposes "field-set and integrate" the ditches to the existing rock cross vane. Specifically, the ditches will be shifted as
necessary to be slightly upstream of the top of the rock cross vane to provide at least 2 feet of separation between the
low point of the proposed ditches and the top of the rock cross vane. This solution will integrate the proposed ditches
and rock vane together, creating the most stable long-term solution.
This information is depicted below:
�TAh1Q�AyRQ '1�" �IZCM i��yl �y�A�*� 'B' � IP RA� '
E�T �kJ ����r ��� �1J �1 l,i� �
�E� QET,�IL �� �#��E1' �-�
��E��E� ���� "�� �� �o����� � r � sv c
1'�N R��'�+. ����AS ���G�� #t�RIP A� —
��� ��TAI�.�.�N��� �`�
�RA4 'V' C}tT�H 1�! C�.�S� 'B' RIP RA
T TC�N�, E� I 51� G��
DETA�� �F w� T �_� �
h
������ �� ������ ���� � � �� ''�,,
� ;�
j � I 4
� r .
` �i '� '� � i
���Ri� ,� _�� �c- ��►',�+1, i
; ; ❑T F�ET�V�+ f �I� T F�C� �RdSS ��
�HT���4ATE P�SE� D�TCxES
', � �u�ANlC�II�NT PR�?��C�1�D� W� !
� Wl #!fX T#�R� �' �`�A55 � Ah+�
� } E��` � �`ONS �C $ RF�. � 5 � � T'
` EIVG�N�ER T� f}EL.� IIE�41f7 Jhl;
�� - - -
�, �
., ,�
�'x �
��i•�4 � . � .{ ,�� �
� � . ; .
i �y 'y +
_ �- _ L ��{� R � ` �
� � � � �k8 WS ��
-� '� w� '••'�,
� �'�� �� - - — —: � ��r��
___ }
.; ,
c�
1 I
I �
� � k � � � � r
� �
5 �
l � �
� � �
k � �+
• t �
Issue at Site 2(Sin�le-barrel culvert near 27+25 -L-
�;� � �,� ac�-a�
.�, � �
} 5 4�
� i� / ��
��� { � � �I�!
.�'.'s � 1 �{» +�4 �� FiCF
�' -�---�.� !� ,�.��
� - � � � f ,�; r'" ,1 =1
. ti , �
�: "r�
�` '
���
r �_ �� �.
� �� �
,.,. �..�_�. .. � .
�� .
� � *�l�T
. ���
���� �
The fill on the right shoulder of the road (downstream side of the culvert) exceeds the maximum allowable of 5.0 feet
for the aluminum box culvert per AASHTO specifications. We were under the understanding this 5.0' max cover applied
under the roadway, but according to Pomona Pipes (delegate designer of the culvert) it also applies on the shoulder. As
currently designed there is approximately 5.7' of fill at the right shoulder point.
To reduce the fill, we are proposing to raise the downstream invert 1 foot to the natural channel bed elevation. The
invert at the outlet will be set to match the adjacent downstream elevation. A mix of Class B and Class I rip rap will be
installed in the a slight blow hole (i.e. countersunk) in the streambed below the outlet. The upstream invert would
remain buried 1 foot and a one foot sill would be placed at the upstream face (slightly inset inside the culvert). A mix of
Class B and Class I rip rap will be installed in the streambed (i.e. countersunk) up to the top of sill. The countersunk rip
rap in the streambed at the inlet and outlet of the culvert is fully within the previously permitted stream improvements.
3
■s■■E
■�■■�
�w�■�
��iiiE
���0��1�E������l���i
■■■�■iiw■�RF .*.�■■�
� �+• � 5��7_1+��
.aEi�� :4�
■■■■■1�■■■� wJr�' w���:�� �����■■��■
■■■■■1�■■�� �■■■ri■■'. �■� i■■�r� �i■■
■■■■■l�■■�J■■■■■■f�l�l■■■■■■■i #■■■
C���At�■L' �■ ■■■■■■■I E�■ ■■■■■■� 1■!�
i�,�.�►:� �'■f 1■■■■■■f���:�■■■■■■■L11►:►�
■iit�l��t:�.?�L' �■■■■■■■�I�r■■■■■■■N'Jl�:w:
■■■����:�:* �i� �■■��■�I�i: ■A■���� ��r;:�l
■■■■■�l3� '����..r�`ar ����;a������ ■.�.i�
�������iir.i�.iR�Rv.��.ir.ira�.�� �r.��a�.�r.���ti�.w�.�_�i��
■■■■■���i■■■■■■■■■■■■■■■■■■■17■■
y�����i��������■�
I�■■■■L]■■■��■■■ .r
I■■�■■�I■�7■■■�!i �1
I■■■■�11■�■■■■■■:'1
I■■■■il�ll�■■■■■■■� �
I■■■■'�i�f.^i� ■■■■■■a �
I■■■■r�R�■■■■■■■■.
I■■■■Gi �■!�■■■■■AG�
From: Murray, Christopher A
Sent: Thursday, February 04, 2016 9:36 AM
To: Alsmeyer, Eric C SAW; Ridings, Rob
Cc: Carpenter,Kristi
Subject: NCDOT Division 5 permit application for widening of Rogers Road (SR 2052) and replacement of Bridge No.
910132 over Smith Creek in Wake Forest, Wake County; TIP/WBS: 17BP.5.R.47
Eric and Rob,
NCDOT Division 5 proposes to widen Rogers Road (SR 2052) and replace Bridge No. 910132 over Smith Creek in Wake
Forest, Wake County . The following information is attached as part of this permit application:
-Signed and scanned copy of PCN form
-In-lieu fee mitigation acceptance letter
-FINAL Stream Permit Drawing Package
-FINAL Riparian Buffer Permit Drawing Package
Please contact me if you need additional information.
Thanks,
Chris Murray
Christopher A. Murray, PWS
Division Environmental Supervisor
Division 5
(919) 220-4633 office
cmurravCa�ncdot.qov
NCDOT-Division 5
2612 N. Duke Street
Courier: 17-27-03
Durham, NC 27704
�;��
;,,
�
,M 1� +M �� ,
Email correspondence to and from this address is subject to the