Loading...
HomeMy WebLinkAboutNC0003433_Table 6-6 Remediate Alternative Feasibility Summary Cape Fear_20160229TABLE 6-6 REMEDIAL ALTERNATIVE EVALUATION SUMMARY CAPE FEAR STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, MONCURE, NC Alternatives Effectiveness Implementability/ Environmental Estimated Groundwater Community Feasibility Sustainability Remediation Cost Acceptance Monitored Natural Yes, groundwater High Sound technical Attenuation (MNA) Yes monitoring wells are (lowest carbon $3.6M basis for common footprint) approach Yes (assuming Moderate Positive due to Groundwater adequate space (energy active nature, Extraction Yes between dike along consumption of $7.OM additional (Interceptor Trench) the southwest portion collection and permitting of the 1985 ash basin treatment required and railroad ROW) system) Moderate to $9.9M, assuming High (Passive zero valent iron Yes, but two Yes (assuming system and treats boron and Positive due to In -Situ Chemical different reactive adequate space reactive other constituents. active nature, Permeable Reactive media may be between dike along material However, a second additional Barrier required to treat the southwest portion potentially has reactive media (not permitting boron and other of the 1985 ash basin a decade(s) included in this required constituents and railroad ROW) long cost) may be effectiveness required to treat duration boron. Prepared By: RKD Checked By: CJS Assumptions: 1. Source control measures are implemented to accomplish groundwater restoration 2. Costs for groundwater remedy include implementation and 30 years monitoring and maintenance P:\Duke Energy Progress.1026\103. Cape Fear Ash Basin GW Assessment\20.EG_CAP\CAP Part 2\Tables\Final\Table 6-6 Remediate Alternative Feasibility Summary Cape Fear.docx Page 1 of 1