Loading...
HomeMy WebLinkAboutNC0038377_Table 2-1 Water Level Data Dec 2015_20160229TABLE 2-1 WATER LEVEL DATA - DECEMBER 2015 MAYO STEAM ELECTRIC PLANT DUKE ENERGY PROGRESS, LLC, ROXBORO, NC Well Identification Date Measured Measured Well Depth (Feet TOC) Measured Depth to Water (Feet TOC) Water Level (Feet MSL) BG-1 12/3/2015 56.35 30.30 509.81 BG-2 12/3/2015 48.08 31.88 510.78 CW-1 12/3/2015 28.84 18.05 471.83 CW-1D 12/3/2015 43.67 19.36 471.60 CW-2 12/3/2015 20.48 12.35 376.65 CW-2D 12/3/2015 58.86 12.78 376.75 CW-3 12/3/2015 NM 17.20 420.48 CW-4 12/3/2015 43.08 22.35 428.96 CW-5 12/3/2015 NM 7.78 501.82 CW-6 12/3/2015 80.50 13.84 448.99 MW-2 12/3/2015 50.17 27.11 434.12 MW-3 12/3/2015 20.26 6.41 377.59 MW-4 12/3/2015 59.06 28.23 494.54 MW-03BR 12/3/2015 76.53 17.14 421.10 MW-05BR 12/3/2015 65.72 9.62 501.78 MW-06BR (piezometer) 12/3/2015 100.34 13.89 450.10 MW-07D 12/3/2015 62.67 11.36 442.58 MW-07BR 12/3/2015 79.46 9.72 443.78 MW-08S (piezometer) 12/3/2015 30.16 29.86 437.01 MW-08D (piezometer) 12/3/2015 38.24 34.60 432.29 MW-08BR 12/3/2015 67.00 36.06 430.93 MW-09BR 12/3/2015 60.63 26.57 468.82 MW-10BR 12/3/2015 57.55 13.30 500.09 MW-11BR 12/3/2015 98.80 36.70 490.66 MW-12S 12/3/2015 50.40 32.15 555.23 MW-12D 12/3/2015 96.55 32.50 555.52 M W-13BR 12/3/2015 100.95 31.55 497.28 MW-14BR 12/3/2015 37.07 16.87 503.88 MW-15BR (piezometer) 12/4/2015 62.90 54.40 406.52 M W-16S 12/4/2015 10.81 3.34 367.77 MW-16D 12/4/2015 41.74 3.26 367.95 MW-16BR 12/4/2015 62.49 3.46 367.84 ABMW-01 12/3/2015 15.65 2.58 481.23 ABMW-02 12/3/2015 42.48 10.83 483.07 ABMW-02BR 12/3/2015 107.64 11.26 482.59 ABMW-03 12/3/2015 43.50 16.96 483.21 ABMW-03S 12/3/2015 63.16 17.18 483.12 ABMW-04 12/3/2015 56.10 6.13 485.31 ABMW-04D 12/3/2015 65.75 6.26 485.24 ABMW-04BR 12/3/2015 111.50 6.15 485.46 Prepared by: EMB Checked by: JAW Notes: nm = Not measured TOC= Top of Casing MSL = Mean Sea Level P:\Duke Energy Progress.1026\105. Mayo Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 2- 1 Water Level Data Dec 2015.xlsx Page 1 of 1