HomeMy WebLinkAboutNC0038377_Fig 2-3 Transition Zone Water Level Dec 2015_20160229— HALII AX COUNT
PERSON COUNTY
/ CW-044
MA YO LAKE RD
' MW-03BR 1W-03
MW 11BR .1 ` k l
Ofn-r1 � :• 1
s
a
o'
/oP
"+''-,�s
�NA PACIFIC CORPORATION
1
SOURCES:
APRIL 17, 2014 AERIAL PHOTOGRAPHY WAS OBTAINED WSP GROUP, CARY. NORTH CAROLINA
MARCH 23, 2013 AERIAL PHOTOGRAPHY WAS OBTAINED FROM NC ONE MAP GEOSPATIAL PORTAL AT
http://data.nconemap.gov/geoportaI/cataIog/raster/downIoad.page
A¢MW-o10
m
�
C
BRzsw3z ELDY ANCH �
e
_yY:.... \ -,
376-65 ��
P2A MW-3
9jD
0 4sD 4 D �•1 MW-06BR
SD QQP3A P3 ` ®CW-06C
MW-08BR
MW-0'D MW-07BR
MW-4
1981 LANDFl
PERMIT ND. ,u
11 VR
ABMW-02� ABMW-035 � � AD
•,_ CW-OlD \
ABMW-02BR - CW01 0�
471.83
LEGEND
ABMW-o4D nBMw-o4BR '' 4eD _. , 4 2C58 ELEVATION ASSESSMENT
N FEET (msl.)
48524
ABMW-04
BACKGROUND COMPLIANCE WELL
ELEVATION IN FEET
MAYO LAKE
(msl.)
Y
WATER:
ATER ELEVATION 436'
CW 01
471.83
DOWNGRADIENT COMPLIANCE WELL
ELEVATION IN FEET
MW 3
(msl.)
MONITORING WELL
377.59
ELEVATION IN FEET (msl.)
0 Mw-1oBR
RAW WATER
STRUCTURE
WATER LEVEL CONTOUR IN FEET (msl.)
v
�l
—
— INFERRED WATER LEVEL CONTOUR (msl.)
-do-"
GROUNDWATER FLOW DIRECTION
REP 1
synTerra_
GRAPHIC SCALE
400 0 400 800
IN FEET
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: JOHN CHASTAIN DATE: 02/04/2016
PROJECT MANAGER: JERRY WYLIE
LAYOUT: FIG ti 3noonn (TRANS W�L MAP)
DUKE ENERGY PROGRESS PARCEL LINE
500 ft COMPLIANCE BOUNDARY
WASTE BOUNDARY
PARCEL LINE (APPROXIMATE)
WATER LEVELS:
WATER LEVELS WERE COLLECTED BY SYNTERRA ON DECEMBER 3 2015.
SOURCES:
JUNE 18, 2014 AERIAL PHOTOGRAPH OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT
http://datagateway.nrcs.usda.gov/
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE
SYSTEM FIRS 3200 (NAD 83).
NEW WELLS WERE SURVEYED BY McKIM& CREED. THE HORIZONTAL DATUM IS SETTO NAD83
AND THE VERTICAL DATUM IS SET NGVD88.
COMPLIANCE MONITORING WELL LOCATIONS AND WASTE BOUNDARY PROVIDED BY DUKE
ENERGY PROGRESS
ADDITIONAL MONITORING WELL AND PIEZOMETER LOCATIONS BASED ON DATA PROVIDED BY PROGRESS
ENERGY.
FIGURE 2-3
TRANSITION ZONE WATER LEVEL MAP
DECEMBER 2015
MAYO STEAM ELECTRIC PLANT
ROXBORO, NORTH CAROLINA