Loading...
HomeMy WebLinkAboutNC0038377_Fig 2-2 Surficial Water Level Dec 2015_20160229— HALII AX COUNT PERSON COUNTY HqU ♦ `` TO MONOFILL 1 11 N /�P = m MW 11¢R0 �., LOUISIANA PACIFIC CORPORATION T11 PCANTACCESS ROAC SOURCES: APRIL 17, 2014 AERIAL PHOTOGRAPHY WAS OBTAINED WSP GROUP, CARY. NORTH CAROLINA MARCH 23, 2013 AERIAL PHOTOGRAPHY WAS OBTAINED FROM NC ONE MAP GEOSPATIAL PORTAL AT http://data.nconemap.gov/geoportaI/cataIog/raster/downIoad.page MAYO LAKE RD .. MW03¢R CW-03 MW 11BR Qy `` � l ABMW-01 .. 451.23 0 ABM W-02 483.07 ABMW-03S 0 483.12 ABM W-028R ABM W-03 ,, 483.21 ABM W-04BR ABMW-04D ABM W-04 485 31 CRUTCHFIELD" l F?a `RR BRANCH t 0 0 >CW-02D CW_p� P2A MW-3 ' alo 377.59 0 4so 4 0 �•1 MW-06BR SO 44P3A P3 / - '�- SZO... `S?0 .� MW-12S MW-112DT® 55.23 �1; DER 1 MW-OSBR I MW-O85 �0 437.01 I1, 1981 LANDFILL PERMITNO. 73-I, 0MW-09BR CW-01D CW 01 LEGEND MW-16S O 367.77 ASSESSMENT WEL ELEVATION IN FEET (msl.) j O BG 02 BACKGROUND COMPLIANCE WELL ELEVATION IN FEET MAYO LAKE (msl.) WATER ELEVATION 436`: CW-01D DOWNGRADIENT COMPLIANCE WELL ` ELEVATION IN FEET (msl.) FM—W3--1 377.59 MONITORING WELL ELEVATION IN FEET (msl.) RAW WATER m Mw-1o3R STRUCTURE WATER LEVEL CONTOUR IN FEET (msl.) -1 — — INFERRED WATER LEVEL CONTOUR (msl.) GRAPHIC SCALE 400 0 400 IN FEET 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synte rraco rp. co m Terra DRAWN BY NAG R:CHAS JERRIN DATE 01/31/2016 by[ I PROJECT MANAGER FICIA WYLIE LAYOUT: FIG 2-2 (SURFICIAL WL MAP) 02/23/20161:03 PM P:\Duke Energy Pmgress.1026\105. P GROUNDWATER FLOW DIRECTION DUKE ENERGY PROGRESS PARCEL LINE 500 ft COMPLIANCE BOUNDARY WASTE BOUNDARY PARCEL LINE (APPROXIMATE) WATER LEVELS: WATER LEVELS WERE COLLECTED BY SYNTERRA ON DECEMBER 3 2015. SOURCES: JUNE 18, 2014 AERIAL PHOTOGRAPH OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT ittp://datagateway.nrcs.usda.gov/ DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIRS 3200 (NAD 83). VEW WELLS WERE SURVEYED BY McKIM& CREED. THE HORIZONTAL DATUM IS SETTO NAD83 AND THE VERTICAL DATUM IS SET NGVD88. ;OM PLIANCE MONITORING WELL LOCATIONS AND WASTE BOUNDARY PROVIDED BY DUKE ENERGY PROGRESS ADDITIONAL MONITORING WELL AND PIEZOMETER LOCATIONS BASED ON DATA PROVIDED BY PROGRESS FIGURE 2-2 SURFICIAL WATER LEVEL MAP DECEMBER 2015 MAYO STEAM ELECTRIC PLANT ROXBORO, NORTH CAROLINA