HomeMy WebLinkAboutNCC200473_NOT Closeout Documents (2)_20250203 0 SEDIMENTATION INSPECTION REPORT Inspection Type
Iredell County Planning & Development Initial
IREDELL Erosion Control Section Routine ❑
COUNTY NC 349 North Center Street/P.O. Box 788 Follow-up
Statesville, NC 28687 Final
11]
Enforcement 2 0
Location: Iredell County Project: Saylor's Watch Project#: IREDE-2020-056
Person financially responsible: Bi-Part Development, LLC, Jake Palillo River basin: Catawba
Address:18611 Starcreek Drive Project location: Brawley School Road
Cornelius, NC 28031 Photographic Documentation: ❑Yes No
Weather and soil conditions: Sunny, 50's, Saturated ❑Prints Slides Video Digital
Is site currently under Notice of Violation? ❑Yes No
Structural BMPs Functioning Needs Maintenance Not Installed Not Applicable
Construction Entrance ❑ ❑ ❑
Silt Fence/Outlet ❑ ❑ ❑ ❑
Sediment Basin/Trap ❑ ❑ ❑ ❑
Diversion Berm/Ditch ❑ ❑ ❑ ❑
Permanent Ditches/Checks ❑ ❑ ❑ ❑
Inlet/Outlet Protection ❑ ❑ ❑ ❑
Other: ❑
If structural BMPs are not functioning properly, note location and corrective action on reverse side of this form
Vegetative Controls Adequate Not Adequate Absent Not Applicable
Stream Buffers ❑ ❑ ❑
Temporary Stabilization N
Permanent Stabilization ® ❑ ❑
If vegetation is not adequate, note location and corrective action on reverse side of this form
J
Erosion/Sedimentation No Yes-Minor Yes-Moderate Yes-Severe
Is there ON-SITE erosion occurring? ® ❑
Is there OFF-SITE sediment loss? IX
Did sediment reach a STREAM? ® ❑ ❑
If any of the above are "Yes", note the location and corrective action on reverse side of this form
Is site in compliance with S.P.C.A. and rules, and ICLDC? If Not Compliant, check
violations on second page.
Compliant Needs Maintenance Not Compliant
This site is... ❑
Sediment Inspection Report Continued
Violations:
❑a. No approved plan, G.S. 113A-57(4) and 15A NCAC 04B .0107(c) ❑g. Inadequate buffer zone, G.S. 113A-57(1) & &
Appendix H of the ICLDC Appendix H of the ICLDC
❑b. Failure to follow approved plan, G.S. 113A-57(5) and Appendix H ❑h. Graded slopes and fills too steep, G.S. 113A-
of the ICLDC 57(2) or 15A NCAC 04B .0124(d) &Appendix H of
the ICLDC
❑c. Failure to submit revised plan, G.S. 113A-54.1(b) & ❑i. Unprotected exposed slopes, G.S. 113A-57(2)
15A NCAC 04B .0118(a) &Appendix H of the ICLDC &Appendix H of the ICLDC
❑d. Failure to provide adequate groundcover, G.S. 113A-57(3) & ❑j. Failure to install and/or maintain erosion
15A NCAC 04B .0107(b) or 15A NCAC 04B .0124(e) &Appendix H control measures, 15A NCAC 04B .0113 &
of the ICLDC Appendix H of the ICLDC
❑e. Insufficient measures to retain sediment on site, G.S. 113A-57(3) ❑k .Failure to self-inspect G.S. 113A-54.1(e) &
&Appendix H of the ICLDC 15A N.C.A.C. 4B.0131 &Appendix H of the
ICLDC
❑f. Failure to take all reasonable measures, 15A NCAC 04B .0105 ❑I. Other(describe)
Appendix H of the ICLDC
Potential NPDES Permit Violation? ❑Yes ❑No ❑Not Applicable Describe:
Has sedimentation damage occurred since last inspection? ❑Yes No If yes, where?
(check all that apply)
❑Lake/natural watercourse on the tract ❑Lake/natural watercourse off the tract
❑Other property ❑Roadway Storm sewer
Description:
Degree of damage: ❑Slight ❑Moderate ❑Severe
Contact made with: No One Inspection report sent to person financially responsible on this date:
Comments / Corrective Actions Needed: Permanent ground cover sufficient to restrain
erosion has been established. No additional self-monitoring or self-inspections are required.
Project is in compliance and released under the SPCA. Termination of coverage under the
NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by
the permittee via a Notice of Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: B. Jordan Phone: 704-878-5388 Others present:
Date of inspection: 1/5/2023 Time arriving on site: 2:10 pm Time leaving site: 2:20 pm
cc:
All erosion and sediment control measures must meet the standards per approved Erosion Control Plan and the North Carolina Erosion and
Sediment Control Planning and Design Manual