STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION '
MICHAEL F. EASLEY
GOVERNOR
October 23, 2007
DWQ -Fayetteville Regional Office
225 Green Street, Suite 714
Systel Building
Fayetteville, NC 28301-5043
Mr. Paul Rawls
Chief, Surface Water Protection Section
NC Division of Water Quality
NPS Assistance and Compliance Oversight Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
J ^~1 ~~
V
LYNDO TIPPETT
SECRETARY
Subject: NCDOT-NCDENR DWQ Settlement Agreement for US 1 Vass Bypass, Moore/Lee
County; TIP No. R-0210; Federal Aid No. NHS-1 (108); State Project No. 6.569005T;
Division 8; WBS 34330.4.3.
Dear Sirs:
Pursuant to paragraph 8 of the Settlement Agreement entered into on October 20, 2006, by the
North Carolina Department of Transportation (NCDOT) and the North Carolina Department of
Environment & Natural Resources -Division of Water Quality (DWQ) regarding the Vass
Bypass Project (TIP Project R-210), NCDOT is providing the following information:
A. NCDOT has installed all of the emergency spill control measures and devices as
listed in Attachment A to the Settlement Agreement, with the exception explained below, and all
the measures and devices are now operational. Attachment A required NCDOT to construct
grass swales on Section C of the project at station numbers 29+10 (Lt) [labeled as 29+10 Med in
the Settlement Agreement] and 31+10 (Lt) [labeled as 31+10 in the Settlement Agreement].
NCDOT constructed the swales earlier this year and installed the final device on June 25, 2007,
but received a Cease and Desist letter from the United States Corps of Engineers on July 3, 2007
requiring the removal of the swales and the restoration of the site. NCDOT has fully complied
with all requirements of the Corps regarding the site. It is NCDOT's understanding that DWQ
will require no further action at those station numbers.
MAILING ADDRESS: TELEPHONE: 919-733-9425 LOCATION:
NC DEPARTMENT OF TRANSPORTATION FAX: 919-733-9428 TRANSPORTATION BUILDING
PRECONSTRUCTION SECTION 1 SOUTH WILMINGTON STREET
1541 MAIL SERVICE CENTER WEBSITE: WWW.DOH.DOT.STATE.NC.US RALEIGH NC
RALEIGH NC 27699-1541
DWQ Fayetteville Regional Office & Mr. Paul Rawls
October 23, 2007
Page 2
B. Spill kits and maps were delivered to the following personnel in the manner
indicated below. Each spill kit contained the items listed in the November 13, 20061etter
from Debbie Barbour to Paul Rawls and as approved in a memo from Paul Rawls dated
December 8, 2006.
Lee County
Or anization Received Date and Method of Distribution
Office of Emergency
Services 1 set of maps October 12, 2007, Hand Delivered
Tramway Volunteer Fire 1 spill kit May 25, 2007, Hand Delivered
Dept. 1 set of ma s October 12, 2007, Hand Delivered
Lemon Springs Volunteer 1 s ill kit May 25, 2007, Hand Delivered
Fire Dept. 1 set of ma s October 12, 2007, Hand Delivered
Moore County
Or anization Received Date and Method of Distribution
Moore County EMS 1 set of maps October 12, 2007, Hand Delivered
Cameron Volunteer Fire 1 s ill kit October 4, 2007, Hand Delivered
Dept. 1 set of ma s October 12, 2007, Hand Delivered
Circle "V" Volunteer Fire 1 s ill kit October 4, 2007, Hand Delivered
Dept. 1 set of ma s October 12, 2007, Hand Delivered
NCDOT has now completed its obligations under the Settlement Agreement, and would like to
receive a letter for its files from DWQ acknowledging this completion. Please contact me if you
have any questions.
Sincerely,
~ d~~
Deborah Barbour, PE
Director of Preconstruction
DMB
DWQ Fayetteville Regional Office & Mr. Paul Rawls
October 23, 2007
Page 3
cc: Bill Rosser, PE, State Highway Administrator
Steve Varnedoe, PE, Chief Engineer-Operations
Art McMillan, PE, State Highway Design Engineer
. Greg Thorpe, Ph.D., Manager of Project Development & Envirorunental Analysis
Tim Johnson, PE, Division Engineer
Dave Henderson, PE, State Hydraulics Engineer
Don Lee, State Roadside Environmental Engineer
Lisa Glover, NCDOJ
John Hennessy, DWQ
man Wrenn, DWQ
Richard Spencer, USACE