Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC192467_NOT Closeout Documents_20250201 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481
County: Currituck Project: Corolla Landing Phase I River basin: Pasquotank
Person financially responsible:Currituck County-Daniel F Scanlon,Manager Project#: CURRI-2019-022
Address: 153 Courthouse Road,Suite 204,Currituck,NC 27929
1. Project Location: NC 12,Corrolla
Pictures: No
2. Weather and soil conditions: 40 degrees,cloudy,dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No contact was made. Title:
Inspection report: Sent Report Date given/sent: January 24,2025
9. Corrective action needed:
10. Comments:Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring
or self-inspections are required.The project is in compliance and released under the SPCA.The permittee must request
termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)via a Notice
of Termination(NOT).The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Scott Graboski Others present:
Date of inspection: January 21,2025 Time arriving on site: 12:10 PM Time leaving site: 12:20 PM
CC: