Loading...
HomeMy WebLinkAbout20030147 Ver 2_Report Email_20160330 Strickland, Bev From:Styer, Tami <Tami.Styer@duke-energy.com> Sent:Wednesday, March 30, 2016 3:19 PM To:Higgins, Karen Cc:Galleher, George A; Dunn, Lynne; Fragapane, Phil; Scott, David Subject:Yadkin-Pee Dee Project - Minimum Flow and Reservoir Water Level Report Attachments:Duke Energy Yadkin-Pee Dee Minimum Flow and Reservoir Level Compliance Report(Mar2016).pdf; Yadkin Pee Dee Project Minimum Flow Release Data 2015(7Mar2016).xlsx; Yadkin Pee Dee Project Reservoir Elevation Data 2015(7Mar2016).xlsx Hi Karen, Hope this note finds you well. Please find attached the annual report required with the 401 Water Quality Certification for the Yadkin-Pee Dee Hydro Project. I can be reached at either number below if you have questions. Also, please let me know if you want to arrange a trip to Tillery this summer to see the liquid oxygen system in operation. The monitoring season starts May 1 so we’ll be up and running from that point on through the DO season. Best Regards, Tami Tami Styer, Project Manager II Water Strategy and Hydro Licensing 526 S. Church St. Charlotte, NC 28202 (704) 382-0293 office (704) 641-3832 cell 1