HomeMy WebLinkAbout20030147 Ver 2_Report Email_20160330
Strickland, Bev
From:Styer, Tami <Tami.Styer@duke-energy.com>
Sent:Wednesday, March 30, 2016 3:19 PM
To:Higgins, Karen
Cc:Galleher, George A; Dunn, Lynne; Fragapane, Phil; Scott, David
Subject:Yadkin-Pee Dee Project - Minimum Flow and Reservoir Water Level Report
Attachments:Duke Energy Yadkin-Pee Dee Minimum Flow and Reservoir Level Compliance
Report(Mar2016).pdf; Yadkin Pee Dee Project Minimum Flow Release Data
2015(7Mar2016).xlsx; Yadkin Pee Dee Project Reservoir Elevation Data
2015(7Mar2016).xlsx
Hi Karen,
Hope this note finds you well. Please find attached the annual report required with the 401 Water Quality Certification
for the Yadkin-Pee Dee Hydro Project. I can be reached at either number below if you have questions. Also, please let
me know if you want to arrange a trip to Tillery this summer to see the liquid oxygen system in operation. The
monitoring season starts May 1 so we’ll be up and running from that point on through the DO season.
Best Regards,
Tami
Tami Styer,
Project Manager II
Water Strategy and Hydro Licensing
526 S. Church St.
Charlotte, NC 28202
(704) 382-0293 office
(704) 641-3832 cell
1