Loading...
HomeMy WebLinkAbout20181192_Utility Impact Report - November 2014_20151201Uti I it I m act Re ort y p p R-2721, R-2828, R-2829 Triangle Expressway Southeast Extension From NC 55 near Holly Springs to US 64 west of Raleigh Wake County, North Carolina Prepared for: � i'�1 � � � ; a' �--1 � � � �� L I i°•: � . T�rr��il�� �"'1�r�h�r1�� Prepared by: �� �'��� � � EN�INEERING 7520 E. Independence Blvd., Suite 230, Charlotte, NC 28227 Michael E. Davis mdavis@hindeengineering.com - 704 814 9042 November 19, 2014 EXECUTIVE SUMMARY It is the intent of this report to furnish all relevant information concerning the general location, dimension and characteristics of major utilities found within the Triangle Expressway Southeast Extension ("Project"). Forty two (42) segments among twelve (12) corridors identified by color were investigated. CORRIDORS: 1. Orange ("O") - Ol, 02, 03, 03 & 04 2. Green ("G") - Gl, G2, G3, G4, G5, G6, G7 3. Brown (B") - s], B2 & s3 4. Mint ("M") - tvil & M2 5. "Can (`�"') - Zt 6. Teal ("TL")- TLi 7. Lilac ("L") - o3L, oXL, Lz, L3, ut, Ls, L6, G2L & B�L g. PIUm �"P"� - P1 & P2 (No longer considered) 9. Red ("R") - Rl , R2, R3, R4, R5, R6, & R7 � �. R0C1 MO(1 �"RM"� - RMl (No longer considered) �� . Blue (`BL )- s►�, sLz, s�3, sLXL & Lzs� 12. Purple ("PU") - otpu, put & nu2 This investigation and report captures by corridor and segment individual utility and some non-utility conflicts where the relocation cost to the NCTA is anticipated to exceed $250K. Information was gathered utilizing on site investigation as well as data from previous investigations in the immediate area. Utility conflicts exist throughout the Project. The more expensive relocations are where the Project conflicts with existing gas and/or electric transmission facilities. Below is a brief outline of utility and non-utility type facilities that exist within the Project limits. 1. Power: a. Duke Energy 2. Telecommunications: a. AT&T (formerly Be1lSouth) b. AT&T (Long Distance) 3. Gas Transmission: a. Cardinal Pipeline Company (subsidiary of Williams Pipeline Company) b. Colonial Pipeline Company 4. Non-Utility Facilities a. TV Towers b. Cell Towers c. FAA Antenna d. Warning Siren This report identifies the anticipated utility relocation cost in 2014 dollars for each of the seventeen (17) end to end corridors consisting of various combinations colored corridors and segments. A summary of the utility and non-utility cost is represented in the following table. The Impact Assessment outlines in further detail the cost to for utility relocation to the NCTA from utilities with compensable rights by corridor and segment. Page 1 of 2 Triangle Expressway Southeast Extension 11/19/2014 R-2721, R-2828, R-2829 EXECUTIVE SUMMARY END to END CORRIDORS: 1 ORANGE-GREEN Segments 01 02 03 04 Cost Non-Utility Cost Utility Cost $1,550,000 $50,510,115 2 ORANGE-GREEN-MINT-GREEN Segments 01 02 03 04 G1 M1 I Cost Non-Utility Cost Utility Cost $1,550,000 $50,510,415 3 ORANGE-BROWN-TAN-GREEN Segments 01 02 03 04 T1 Cost Non-Utility Cost Utility Cost $1,050,000 $50,928,327 4 ORANGE-BROWN-GREEN Segments 01 02 03 04 Cost Non-Utility Cost Utility Cost $11,800,000 $50,793,327 5 ORANGE-GREEN-TEAL-BROWN-GREEN Segments 01 02 03 04 TL1 Cost Non-Utility Cost Utility Cost $11,800,000 $50,404,515 6 ORANGE-RED-GREEN Segments 01 Cost Non-Utility Cost Utility Cost $2, 550, 000 $16, 516,100 7 ORANGE-RED-MINT-GREEN Cost Cost � Non-Utility Cost I Utility Cost Cost Non-Utility Cost Utility Cost $22,550,000 $8,003,941 10 ORANGE-PURPLE-BLUE-LILAC-BROWN-TAN-GREEN Segments BL: L3 L Cost Non-Utility Cost Utility Cost $22,050,000 $8,421,853 11 ORANGE-PURPLE-BLUE-LILAC-BROW N-GREEN Segments L3 L Cost Non-Utility Cost Utility Cost $32,800,000 $8,286,853 12 ORANGE-PURPLE-BLUE-LILAC-GREEN-TEAL-BROWN-GREEN Segments L3 L Cost Non-Utility Cost Utility Cost $32,800,000 $7,898,041 13 ORANGE-LILAC-GREEN Segments 01 02 03L OxL L2 L3 L4 L5 G2L Cost Non-Utility Cost Utility Cost $21,550,000 $52,617,526 14 ORANGE-LILAC-GREEN-MINT-GREEN Segments 01 02 03L OxL L2 L3 L4 L5 G2L Cost Non-Utility Cost Utility Cost $21,550,000 $52,617,826 15 ORANGE-LILAC-BROWN-TAN-GREEN Segments 01 02 03L OxL L2 L3 L4 L6 B1L T Cost Non-Utility Cost Utility Cost $21,050,000 $53,035,738 16 ORANGE-LILAC-BROWN-GREEN Segments 01 02 03L OxL L2 L3 L4 L6 B1L Cost Non-Utility Cost Utility Cost $31,800,000 $52,900,738 17 ORANGE-LILAC-GREEN-TEAL-BROWN-GREEN Segments 01 02 03L OxL L2 L3 L4 LS G2L TL Cost Non-Utility Cost Utility Cost $31,800,000 $52,511,926 Page 2 of 2 11/19/2014 Total End to End Cost $52,060,115 Total End to End Cost Total End to End Cost $51,978,327 Total End to End Cost $62,593,327 Total End to End Cost $62,204,515 Total End to End Cost $19, 066,100 Total End to End Cost $19,066,400 Total End to End Cost $30,553,641 M1 M2 Total End to End Cost $30,553,941 T1 ` Total End to End Cost $30,471,853 Total End to End Cost $41,086,853 TL1 4 ' Total End to End Cost $74,167,526 Total End to End Cost $74,167,826 Total End to End Cost Total End to End Cost $84,700,738 Total End to End Cost Triangle Expressway Southeast Extension R-2721, R-2828, R-2829 PROJECT DESCRIPTION and OBJECTIVES Description• This project is designated as three projects in the North Carolina Department of Transportation's (NCDOT) State Transportation Improvement Program (STIP) - Projects R-2721, R-2828, and R-2829. The STIP describes the projects as a freeway facility on new location. These projects combine to form the southern and eastern portions of the Outer Loop around Raleigh and surrounding communities in Wake and Johnston Counties. The project extends from NC 55 at SR 1172 (Old Smith�eld Road) near Apex to US 64/US 264 Bypass south of US 64 and east of Raleigh, a distance of 27.3 miles. In August 1996 and March 1997, the North Carolina Board of Transportation adopted Transportation Corridor Official Maps (Official Maps) for the portion of the project between NC 55 to I-40. This program allows the reservation of roadway corridors as provided by North Carolina General Statutes 136-44.5 through 136-44.54. The project study area is located in the southern portion of the greater Raleigh metropolitan area in Wake and Johnston Counties south of the cities and towns of Apex, Cary, Raleigh, and Garner and north of Fuquay-Varina and Holly Springs. This Task Order, involves the study of 42 corridor segments that in various combinations make up seventeen (17) Detailed Study Alternatives (DSA). Obi ectives: The project team will prepare a utility relocation plan, for NCTA approval, that will include sufficient detail to develop the utility relocation cost estimate for inclusion in the Draft Environmental Impact Statement. In preparing the utility relocation plan, the project team will be responsible for identifying all necessary utility relocations, coordinating with utility owners on the utility relocations, and determining the cost responsibility for the utility relocations. The scope of work is outlined on next page: Page 1 of 2 Triangle Expressway Southeast Extension 11/19/2014 R-2721, R-2828 & R-2829 Utilitv Coordination: SUBTASK BiBz E1: IDENTIFY EXISTING LTTILITIES Using functional designs for the project DSAs, the project team will obtain existing utility information available for the project from NCTA and publicly available utility information not already available from NCTA. The project team will also survey the project study area to confirm data received from NCTA and the utility companies and will submit to NCTA a listing of utility owners within the project corridor. The project team will identify eXisting utilities within the project corridar from mapping provided by NCTA and information gathered during the field survey. SUBTASK B2 & E2: PRELIMINARY UTILITY IDENTIFICATION REPORT The project team will prepare a preliminary utility identification report for use in preparing the Draft EIS for the project. This report will evaluate and document the utility impacts (including wet and dry utilities) and will contain a utility impact and relocation cost estimate associated with each of the DSAs on an equal and consistent basis. The cost estimates will reflect whether prior rights exist for the utility to the extent that this information is readily available for this preliminary report. The report will also contain a listing of each utility owner identified, along with a contact person for that utility. Page 2 of 2 Triangle Expressway Southeast Extension 11/19/2014 R-2721, R-2828 & R-2829 Utility Contact List Type of Utility Company Name Address Contact Person Phone 100 East Davie Street James Loy Duke Energy (Transmission) Raleigh, NC 27601 Sr. Eng.Tech Support Specialist 919-546-6034 Electric jamie.loy@pgnmail.com 1020 W. Chatham St. Ms. Sheila Talton Duke Energy (Distribution) Cary, NC 27511 Senior Utility Coordinator 919-481-6126 sheila.talton@pgnmail.com 5390 Overbend Trail Scott Logeman Suwannee, GA 30024 slogeman@att.com 770-335-8255 AT&T (Long Distance) 239 Cleveland Street, Suite A-1, Danny Hemphill 706-745-3105 Blairsville, GA 30514 dan33@winstream.net 5715 Glenwood Ave. Kelly J Malpass AT&T (old BeIlSouth) Raleigh, NC 27612 Manager Planning & Engineering Design 919-785-7771 km4631 @att.com Wayne Hall Manager - Engineering 910-980-2229 Telecommunications Century Link 206 West Cumberland Street Ernest.W.Hall@Embarq.com Dunn, NC 28334 James D Johnson Network Engineer II 910 980-2222 james.d.johnson@embarq.com 1 Turner Street Mike Weaver Raleigh, NC 27607 Outside Plant Engineer 919-341-2202 Level 3 mike.weaver@level3.com 1025 Eldorado Blvd. Keith Osborn 720-888-2774 Broomfield, CO 80021 keith.osborn@level3.com 4200 Atlantic Ave., Ste 116 Eric Crane MCI / Verizon Business Raleigh, NC 27604 OSP Sr. Engineer 919-326-5604 eric.crane@verizonbusiness.com Page 1 of 3 State Proj No.: 35520.1.TA1 Revised: 2014-11-19 R-2635A, R-26356 R-2635C Utility Contact List Type of Utility Company Name Address Contact Person Phone Roland Bruyere g19-362-8327 1100 Perimeter Park Drive roland.bruyere@twcable.com Cable Television Time Warner Communications Suite 118 Morrisville, NC 27560 Larry Thorne Locate Supervisor 919 573-7230 larry.thorne@twcable.com David S Dickerson Division Engineer 434 964-2122 Cardinal Pipeline Company 1345 Greenbrier Dr David.S.Dickerson@Williams.com (Williams Pipeline Company) Charlottesville, VA 22901 Gas Ashley Greiwe 434-964-2125 ashley.greiwe@williams.com 411 Gallimore Dairy Road Tom West 336-931-6039 Colonial Pipeline Company or Greensboro, NC 27409 twest@colpipe.com 336 669 7996 Tim Donnelly Public Works Director 919-249-3427 Town of Apex P. O. Box 250 tim.donnelly@apexnc.org Apex, NC 27502 Steve Miller Sewer & Water Public Works Project Coordinator 919 362-8166 steve.miller@apexnc.org 128 South Main Street Luncie McNeil Town of Holly Springs Holly Springs, NC 27540 Public Works Director 919-552-5920 luncie.mcneil@Hollyspringsnc.us Page 2 of 3 State Proj No.: 35520.1.TA1 Revised: 2014-11-19 R-2635A, R-26356 R-2635C Utility Contact List Type of Utility Company Name Address Contact Person Phone 496 Long Point Rd. Mike Flint Mount Pleasant, SC 29464 Area VP 843 971-8385 Communication American Tower Corporation Mike.Flint@AmericanTower.com Tower Jeffery Singleton 900 Circle 75 Parkway, Suite 300 Project Manager 770 308-1960 Atlanta, GA 30339 Jeffery.Singleton@AmericanTower.com SBA Towers SBA Communications Corp. 5900 Broken Sound Parkway NW Elaine Tarkington g19-868-0426 Boca Raton, Florida 33487 etarkington@sbasite.com Ashley Child Crown Castle Crown Castle Inc. Account Executive 704-405-6625 Tony Queen Manager of East Carolina District 919-465-3508 TV Tower FAA Tower 1020 W. Chatham St. Ms. Sheila Talton Nuclear Siren Progress Energy Cary, NC 27511 Senior Utility Coordinator 919-481-6126 sheila.talton nmail.com Page 3 of 3 State Proj No.: 35520.1.TA1 Revised: 2014-11-19 R-2635A, R-26356 R-2635C Utility Impact Assessment The following outlines at a high level the impact utilities may have with regard to the successful design and construction of the Triangle Expressway Southeast Extension ("Project"). This version of the assessment highlights utility and some non-utility conflicts with relocation cost of greater than $250K or significant impact to project schedule. The NCTA has requested Hinde Engineering, Inc. ("Hinde") to perform a preliminary utility assessment for multiple corridors of the Project. Each corridor is identified by color and may have multiple segments. Included in this report are the following corridors and segments: 1. Orange corridor 1.1. Segment - O1 1.2. Segment - 02 1.3. Segment - 03 1.4. Segment - 04 2. Green corridor 2.1. Segment - G1 2.2. Segment - G2 2.3. Segment - G3 2.4. Segment - G4 2.5. Segment - GS 2.6. Segment - G6 2.7. Segment - G7 3. Brown corridor 3.1. Segment - B 1 3.2. Segment - B2 3.3. Segment - B3 4. Mint corridor 4.1. Segment - M 1 4.2. Segment - M2 5. Tan corridor 5.1. Segment - T1 6. Teal corridor 6.1. Segment - TL1 7. Lilac corridor 7.1. Segment - 03L 7.2. Segment - OxL 7.3. Segment - L2 7.4. Segment - L3 7.5. Segment - L4 7.6. Segment - LS 7.7. Segment - L6 7.8. Segment - G2L 7.9. Segment - B 1 L Page lof 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 8. Plum corrido� No longer being considered 9. Red corridor 9.1. Segment - R1 9.2. Segment - R2 9.3. Segment - R3 9.4. Segment - R4 9.5. Segment - RS 9.6. Segment - R6&7 10. Red Modified corridor No longer being considered 11. Blue corridor 11.1. Segment - BL1 11.2. Segment - BL2 11.3. Segment - BL3 11.4. Segment - BLxL 11.5. Segment - L2BL 12. Purple corridor 12.1. Segment - O 1 PU 12.2. Segment - PU1 12.3. Segment - PU2 Page 2of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment A total of seventeen End to End Corridors are addressed consisting of multiple combinations of the ten (10) colored corridors and segments in the pages that follow. In all cases, only conflicts where the relocation cost to the NCTA is anticipated to be greater than $250K are documented. In some cases a conceptual relocation design is illustrated showing what the impacted utility may consider to reintegrate its system to eliminate conflicts within the proposed NCDOT right- of-way. Cost and conceptual design are based on the information derived from previous projects, site visits and discussions with utility representatives. All conflicts are summarized by corridor and segment in the "Utility Impact Assessment Matrix". The most costly relocations for highway projects are related to transmission facilities owned by both electric and gas companies. These companies will have prior rights and each will seelc compensation for relocation and/or modification to its facilities. Facilities such as Radio/TV Towers, Cell Towers, Warning Sirens, FAA Antennas and Wastewater Treatment ponds and/or spray fields were also documented during this investigation. Cost related to relocate these facilities will likely be addressed in the real estate settlement rather that a Utility Relocation Agreement. In addition to the cost to relocate and / or modify these types of facilities, they are also the most time consuming. In many cases transmission facilities may take as long as one year or longer to clear the Project given the need to purchase new right-of-way, order special materials as well as possible moratoriums, both regulatory and seasonal. Based on the information gathered thus far the NCTA may want to consider some of the following suggestions to help reduce the impact of utility conflicts and consequentially costs related to relocations and / or modifications. • At any location where the Project crosses an aerial transmission line, the design team should try to avoid having to excavate (cut or fill) within thirty (30) feet of an existing structure. • Consider realignment of roadway to avoid existing towers, especially "corner" towers. • Minimize reduction in vertical clearance when crossing transmission line between towers (mid span). • Minimize fill over gas transmission lines • Avoid cuts at gas transmission lines Page 3of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 1 Orange Corridor 1.1 Segment — 01 (21+45.00 to 386+31.44) Protected Corridor from Beginning of Project to a point where the Red Corridor ties. 1.1.1 Existing Facilities (Highlighted on COR-O RDY ROLLI_UC) • Colonial Pipeline Company has a single petroleum line in conflict with proposed expressway at the intersection of Sunset Lake Road (SR-1301) (Highlighted on COR-O_RDY ROLL2_UC) • AT&T has a Remote Terminal Site in conflict with the proposed improvements to Holly Springs Road (SR-1152) just across from Fairview Street • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway at the intersection of Pierce Olive Road (SR-1389) • Colonial Pipeline Company has three (3) petroleum lines within a single R/W in conflict with the proposed expressway at the intersection of West Lake Road (SR-1387) • Colonial Pipeline Company has three (3) petroleum lines within a single R/W in conflict with proposed improvements to Bells Lake Road (SR-1386) just to the south of proposed expressway 1.1.2 Future Facilities There are no future transmission facilities planned at this time 1.1.3 Prior Rights Colonial Pipeline Company — deeded R/W AT&T — owner of property Duke/Progress Energy — deeded R/W 1.1.4 Estimate Cost to NCTA for Relocation • Colonial Pipeline Company o Sunset Lake Road (SR-1301) ■ Install 2,769 feet of new pipeline x 1 line at $1K per foot per line o West Lake Road ■ Insta112,048 feet of new pipeline x 3 lines at $1 K per foot per line o Bells Lake Road ■ Install 357 feet of new pipeline x 3 lines at $1K per foot per line $2.769M $6.144M $1.071M Page 4of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment • Duke/Progress Energy o Pierce Olive Rd. $879.3K ■ Insta112,931 feet of new transmission line x 1 line at $300.00 per foot per line • AT&T o Holly Springs Rd. 1.1.5 Estimated Time to Relocate • Colonial Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal • AT&T o Acquisition of new site o Construction/Cutover/Removal 12 months 12-18 months 12 months 12-18 months 6-12 months 12-18 months $400K 1.1.6 Restrictions and/or Moratoriums • Colonial Pipeline Company o Cutover for pipelines are restricted during winter months • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months Page Sof 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 1.1.7 Non-Utility Conflicts Observed During Investigation Warning Siren — Nuclear Plant o Existing Facility (Highlighted on COR-O_RDY ROLL2_UC) ■ Duke/Progress Energy has a warning siren for a nearby nuclear plant located on Kildare Road just to the northwest of Holly Springs Road. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly from the amount estimated below) ■ $SOK o Estimated Time to Relocate ■ Acquisition of new site • 6-12 months ■ Permitting/Construction/Cutover/Removal • 12-18 months o Restrictions and / or Moratoriums ■ Duke/Progress Energy may have to obtain permits from various regulatory agencies prior to relocating this facility. Page 6of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 1,2 Segment — 02 (386+31.44 to 484+00.00) Protected Corridor from O1 to 03/02L-US 401 (Builds only the Portion of US 401 needed to complete R-2721) 1.2.1 Existing Facilities (Highlighted on COR-O RDY ROLL3_UC) • Colonial Pipeline Company has three (3) petroleum lines within a single R/W in conflict with the proposed expressway from Lalce Wheeler Road (SR-1371) eastward to US 401. This conflict continues east to Old McCullers Road (SR- 2722) in segment 03. 1.2.2 Future Facilities There are no future transmission facilities planned at this time 1.2.3 Prior Rights Colonial Pipeline Company - deeded R/W 1.2.4 Estimate Cost to NCTA for Relocation • Colonial Pipeline Company o Lake Wheeler to US-401 ■ Install 3,193 feet of new pipeline x 3 lines at $1K per foot per line 1.2.5 Estimated Time to Relocate • Colonial Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal 1.2.6 Restrictions and/or Moratoriums 12 months 12-18 months $9.576M • Colonial Pipeline Company o Cutover for pipelines are restricted during winter months 1.2.7 Non-Utility Conflicts Observed During Investigation None Page 7of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 1,3 Utility Impact Assessment Segment — 03 (484+00.00 to 877+65.00) Protected Corridor from 02- US 401 (Builds the Remaining Portion of US 401 Interchange) to a point where the I-40 Interchange starts. 1.3.1 Existing Facilities (Highlighted on COR-O RDY ROLL3_UC) • Colonial Pipeline Company has three (3) petroleum lines within a single R/W in conflict with the proposed expressway from US 401 east to just east of Old McCullers Road (SR-2722). (Highlighted on COR-O RDY ROLL4_UC) • Colonial Pipeline Company has three (3) petroleum lines within a single R/W in conflict with the proposed expressway from west of Fanny Brown Road (SR-2723) to approximately 1,000 feet west of Holland Church Road (SR- 2725) • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway at the intersection of Holland Church Road (SR-2725) • Cardinal Pipeline Company has a gas line adjacent to Duke/Progress Energy transmission R/W in conflict with the proposed expressway a� the intersection of Holland Church Road (SR-2725) (Highlighted on COR-O RDY ROLL6 UC) • Colonial Pipeline Company has three (3) petroleum lines within a single R/W in conflict with the proposed expressway just east of NG50 • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway just east of NG50. 1.3.2 Future Facilities There are no future transmission facilities planned at this time 1.3.3 Prior Rights Colonial Pipeline Company — deeded R/W Cardinal Pipeline Company — deeded R/W Duke/Progress Energy — deeded R/W 1.3.4 Estimate Cost to NCTA for Relocation • Colonial Pipeline Company o US-401 to McCullers ■ Install 1,453 feet of new pipeline x 3 lines at $1 K per foot per line o Fanny Brown to Holland Church ■ Install 6,629 feet of new pipeline x 3 lines at $1K per foot per line o East of NG50 Install 1,136 feet of new pipeline x 3 lines at $1 K per foot per line $4.359M $19.887M Page 8of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment • Cardinal Pipeline Company o Holland Church Rd. ■ Insta110.4 miles (2,116 feet) of new pipeline x 1 line at $2.OM per mile per line • Duke/Progress Energy o Holland Church Road ■ Install 2,115 feet of new transmission line at $300 per foot per line o East of NG50 ■ Install 1,214 feet of new transmission lines at $300 per foot per line 1.3.5 Estimated Time to Relocate • Colonial Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal • Cardinal Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 1.3.6 Restrictions and/or Moratoriums 12 months 12-18 months 12 months 12-18 months 12 months 12-18 months $801.S15K $634.SK $364.2K • Colonial Pipeline Company o Cutover for pipelines are restricted during winter months • Cardinal Pipeline Company o Cutover for pipelines are restricted during winter months • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 1.3.7 Non-Utility Conflicts Observed During Investigation None Page 9of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 1,4 Segment — 04 (877+65.0o to 952+00.00) Protected Corridor from 03 to I-40 Interchange (Only builds a portion of I-40 Interchange needed to complete R-2828) 1.4.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 1.4.2 Future Facilities There are no future transmission facilities planned at this time 1.4.3 Prior Rights N/A 1.4.4 Estimate Cost to NCTA for Relocation N/A 1.4.5 Estimated Time to Relocate N/A 1.4.6 Restrictions and/or Moratoriums N/A 1.4.7 Non-Utility Conflicts Observed During Investigation None Page l0of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 2 Green Corridor 2.1 Segment — G1 (952+00.00 to 1009+15.00) Green Corridar from I-40 (Completes Ultimate I-40 Interchange) to a point where the Brown Corridor ties. 2.1.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 2.1.2 Future Facilities There are no future transmission facilities planned at this time 2.1.3 Prior Rights N/A 2.1.4 Estimate Cost to NCTA for Relocation N/A 2.1.5 Estimated Time to Relocate N/A 2.1.6 Restrictions and/or Moratoriums N/A 2.1.7 Non-Utility Conflicts Observed During Investigation None Page llof 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 a.z Utility Impact Assessment Segment - G2 (1021+00.0o to 115s+oo.00) Green Corridor from B 1 tie to a point where Teal ties to Green. 2.2.1 Existing Facilities (Highlighted on COR-G RDY ROLLI_UC) • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway approximately 3,000 feet south of US-70 (Business) 2.2.2 Future Facilities There are no future transmission facilities planned at this time 2.2.3 Prior Rights Duke/Progress Energy - deeded R/W 2.2.4 Estimate Cost to NCTA for Relocation • Duke/Progress Energy o South of US-70 Business ■ Adjust span lengths and pole heights to accommodate 370ft. crossing of new corridor 2.2.5 Estimated Time to Relocate • Duke/Progress Energy o Acquisition of new R/W and Design 12 months o Construction/Cutover/Removal 12-18 months 2.2.6 Restrictions and/or Moratoriums • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 2.2.7 Non-Utility Conflicts Observed During Investigation • None Page 12of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 2,3 Segment — G3 (1158+00.00 to 1195+31.00) Green Corridor from a point where Teal ties to Green to a point where Mint ties to Green. 2.3.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 2.3.2 Future Facilities There are no future transmission facilities planned at this time 2.3.3 Prior Rights N/A 2.3.4 Estimate Cost to NCTA for Relocation N/A 2.3.5 Estimated Time to Relocate N/A 2.3.6 Restrictions and/or Moratoriums N/A 2.3.7 Non-Utility Conflicts Observed During Investigation None Page 13of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 2,4 Segment — G4 (1195+31.00 to 1238+53.00) Green Corridor from a point where Mint ties to Green to a point where Red ties to Green. 2.4.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 2.4.2 Future Facilities There are no future transmission facilities planned at this time 2.4.3 Prior Rights N/A 2.4.4 Estimate Cost to NCTA for Relocation N/A 2.4.5 Estimated Time to Relocate N/A 2.4.6 Restrictions and/or Moratoriums N/A 2.4.7 Non-Utility Conflicts Observed During Investigation • FAA Air Traffic Control Antenna o Existing Facility (Highlighted on COR-G_RDY ROLL2_UC) ■ The FAA has an antenna site for air traffic control near the intersection of Rock Quarry Road and Old Baucom Road that is in conflict with new expressway. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may c�eviate greatly frorn the amount estimated below) ■ $SOOK o Estimated Time to Relocate ■ Acquisition of new site • 6-12 months ■ Permitting/Construction/Cutover/Removal • 12-24 months o Restrictions and / or Moratoriums ■ May have to obtain permits from various regulatory agencies prior to relocating this facility. Page 14of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 2,5 Segment — G5 (1238+53.00 to 1388+00.00) Green Corridor from a point where Red ties to Green to a point where Mint, Brown, and Tan ties back to Green. 2.5.1 Existing Facilities (Highlighted on COR-G RDY ROLL2_UC) • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway approximately 1,600 feet north of Battle Bridge Road (SR-2552) 2.5.2 Future Facilities There are no future transmission facilities planned at this time 2.5.3 Prior Rights Duke/Progress Energy — deeded R/W 2.5.4 Estimate Cost to NCTA for Relocation • Duke/Progress Energy o Northeast of Battle Bridge Rd ■ Adjust span lengths and pole heights to accommodate 352ft. crossing of new corridor 2.5.5 Estimated Time to Relocate • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 2.5.6 Restrictions and/or Moratoriums 12 months 12-18 months $105.6K • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 2.5.7 Non-Utility Conflicts Observed During Investigation None Page 15of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 2,6 Segment — G6 (1388+00.00 to 1439+00.00) Green Corridor from a point where Mint/Brown/Tan ties back to Green to Poole Rd. (Former Corridor Tie Point). 2.6.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 2.6.2 Future Facilities There are no future transmission facilities planned at this time 2.6.3 Prior Rights N/A 2.6.4 Estimate Cost to NCTA for Relocation N/A 2.6.5 Estimated Time to Relocate N/A 2.6.6 Restrictions and/or Moratoriums N/A 2.6.7 Non-Utility Conflicts Observed During Investigation None Page 16of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 2,7 Segment — G7 (1439+00.00 to 1529+00.00) Green Corridor from Poole Rd to Green to end point north of US 64/US264. 2.7.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 2.7.2 Future Facilities There are no future transmission facilities planned at this time 2.7.3 Prior Rights N/A 2.7.4 Estimate Cost to NCTA for Relocation N/A 2.7.5 Estimated Time to Relocate N/A 2.7.6 Restrictions and/or Moratoriums N/A 2.7.7 Non-Utility Conflicts Observed During Investigation • Cell Tower o Existing Facility (Highlighted on COR-G RDY ROLL3_UC) ■ SBA has a cell tower site just off Pool Road in conflict with new expressway. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly from the amount estimated below) ■ $1.OM o Estimated Time to Relocate ■ Acquisition of new site • 6-12 months ■ Permitting/Construction/Cutover/Removal • 12-24 months o Restrictions and / or Moratoriums ■ Permits and existing contracts with tenants may impact schedules for relocations and / or transfers to new tower site. Page 17of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 3 Brown Corridor 3.1 Segment — B1 (1021+00.00 to 1206+00.00) Brown Corridor from a point where Brown ties to Green to a point where Tan ties to Brown. 3.1.1 Existing Facilities (Highlighted on COR-B RDY ROLL3_UC) • Duke/Progress Energy has a SOOKV transmission line on steel lattice structures in conflict with the proposed expressway approximately 3,000 feet east of White Oak Road • Cardinal Pipeline Company has a gas transmission line in conflict with the propose expressway approximately 3,000 feet east of White Oak Road. This portion of the pipeline is parallel with the Duke/Progress Energy SOOKV transmission line. • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway approximately 800 feet north of Guy Road 3.1.2 Future Facilities There are no future transmission facilities planned at this time 3.1.3 Prior Rights Cardinal Pipeline Company — deeded R/W Duke/Progress Energy — deeded R/W 3.1.4 Estimate Cost to NCTA for Relocation • Cardinal Pipeline Company o East of White Oak ■ Adjustment to 0.09 miles (452 feet) of transmission line to account for fill $2.OM per mile per line • Duke/Progress Energy o East of White Oak ■ Adjust span lengths and structure heights to accommodate 446ft crossing of new corridor o North of Guy Road ■ Adjust span lengths and pole heights to accommodate 352ft. crossing of new corridor $171.2K $223K $105.6K Page 18of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 3.1.5 Estimated Time to Relocate • Cardinal Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 3.1.6 Restrictions and/or Moratoriums 12 months 12-18 months 12 months 18-24 months • Cardinal Pipeline Company o Cutover for pipelines are restricted during winter months • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 3.1.7 Non-Utility Conflicts Observed During Investigation None Page 19of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 3,2 Segment — BZ (1206+00.00 to 1330+00.00) Brown Corridor from a point where Tan ties to Brown to a point where Teal ties to Brown. 3.2.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 3.2.2 Future Facilities N/A 3.2.3 Prior Rights N/A 3.2.4 Estimate Cost to NCTA for Relocation N/A 3.2.5 Estimated Time to Relocate N/A 3.2.6 Restrictions and/or Moratoriums N/A 3.2.7 Non-Utility Conflicts Observed During Investigation • Waste Water Treatment Ponds & Spray Fields o Existing Facility (Highlighted on COR-B_RDY ROLL4 UC) ■ Brown corridor in conflict with 33 acres of existing wastewater spray field at the Neuse River Wastewater Treatment Plant. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly fi�om the amount estimated below) ■ $8.25M o Estimated Time per tower to Relocate ■ Acquisition of new site • 12-24 months ■ Permitting/Construction/Cutover/Removal • 12-24 months o Restrictions and / or Moratoriums ■ Unknown Page 20of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 3,3 Segment — B3 (1330+00.00 to 1446+87.00) Brown Corridor from a point where Teal ties to Brown to a point where Brown ties back to Green. 3.3.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 3.3.2 Future Facilities There are no future transmission facilities planned at this time 3.3.3 Prior Rights N/A 3.3.4 Estimate Cost to NCTA for Relocation N/A 3.3.5 Estimated Time to Relocate N/A 3.3.6 Restrictions and/or Moratoriums N/A 3.3.7 Non-Utility Conflicts Observed During Investigation • Waste Water Treatment Ponds & Spray Fields o Existing Facility (Highlighted on COR-B_RDY ROLLS UC) ■ Brown corridor in conflict with 10 acres of existing wastewater spray field at the Neuse River Wastewater Treatment Plant. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly fi�om the amount estimated below) ■ $2.SM o Estimated Time per tower to Relocate ■ Acquisition of new site • 12-24 months ■ Permitting/Construction/Cutover/Removal • 12-24 months o Restrictions and / or Moratoriums ■ Unknown Page 21of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 4 Mint Corridor 4,1 Segment — M1 (1195+31.00 to 1239+00.00) Mint Corridor from a point where Mint ties to Green to a point where Red ties to Mint. 4.1.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 4.1.2 Future Facilities There are no future transmission facilities planned at this time 4.1.3 Prior Rights N/A 4.1.4 Estimate Cost to NCTA for Relocation N/A 4.1.5 Estimated Time to Relocate N/A 4.1.6 Restrictions and/or Moratoriums N/A 4.1.7 Non-Utility Conflicts Observed During Investigation • FAA Air Traffic Control Antenna o Existing Facility (Highlighted on COR-MG_RDY ROLLI UC) ■ The FAA has an antenna site for air traffic control near the intersection of Rock Quarry Road and Old Baucom Road that is in conflict with new expressway. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly from the amount estimated helow) ■ $SOOK o Estimated Time to Relocate ■ Acquisition of new site • 6-12 months ■ Permitting/Construction/Cutover/Removal • 12-24 mon�hs o Restrictions and / or Moratoriums ■ May have to obtain permits from various regulatory agencies. Page 22of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 4,2 Segment — M2 (1239+00.00 to 1388+00.00) Mint Corridor from a point where Red ties to Mint to a point where Mint ties back to Green. 4.2.1 Existing Facilities (Highlighted on COR-MG RDY ROLLI_UC) • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway approximately 1,600 feet north of Battle Bridge Road (SR-2552) 4.2.2 Future Facilities There are no future transmission facilities planned at this time 4.2.3 Prior Rights Duke/Progress Energy — deeded R/W 4.2.4 Estimate Cost to NCTA for Relocation • Duke/Progress Energy o North of Battle Bridge Rd. ■ Adjust span lengths and structure heights to accommodate 353ft crossing of new corridor 4.2.5 Estimated Time to Relocate • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 4.2.6 Restrictions and/or Moratoriums 12 months 12-18 months $105.9K • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 4.2.7 Non-Utility Conflicts Observed During Investigation None Page 23of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 5 Tan Corridor 5.1 Segment - T1 (1206+00.00 to 1426+45.00) Tan Corridor from a point where Brown ties to Tan to a point where Tan ties to Green. 5.1.1 Existing Facilities (Highlighted on COR-T RDY ROLL2_UC) • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway approximately 900 feet north of Battle Bridge Road 5.1.2 Future Facilities There are no future transmission facilities planned at this time 5.1.3 Prior Rights Duke/Progress Energy — deeded R/W 5.1.4 Estimate Cost to NCTA for Relocation • Duke/Progress Energy o Battle Bridge Road ■ Adjust span lengths and structure heights to accommodate 450ft crossing of new corridor 5.1.5 Estimated Time to Relocate • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 5.1.6 Restrictions and/or Moratoriums 12 months 18-24 months $135K • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 5.1.7 Non-Utility Conflicts Observed During Investigation None Page 24of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 6 Teal Corridor 6.1 Segment — TL1 (1158+00.00 to 1327+71.00) Teal Corridor from a point where Teal ties to Green to a point where Teal ties to Brown. 6.1.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 6.1.2 Future Facilities There are no future transmission facilities planned at this time 6.1.3 Prior Rights N/A 6.1.4 Estimate Cost to NCTA for Relocation N/A 6.1.5 Estimated Time to Relocate N/A 6.1.6 Restrictions and/or Moratoriums N/A 6.1.7 Non-Utility Conflicts Observed During Investigation • Waste Water Treatment Ponds & Spray Fields o Existing Facility (Highlighted on COR-TL RDY ROLL3 UC) ■ Teal corridor in conflict with existing 33 acres of wastewater spray field at the Neuse River Wastewater Treatment Plant. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly fi�om the amount est�mated below) ■ $8.25M o Estimated Time per tower to Relocate ■ Acquisition of new site • 12-24 months ■ Permitting/Construction/Cutover/Removal • 12-24 months o Restrictions and / or Moratoriums ■ Unknown Page 25of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 7 Lilac Corridor 7,1 Utility Impact Assessment Segment — 03L (484+00.00 to 663+45.51) Portion of Orange Corridor from US 401 Interchange (Includes completing US 401 Interchange) to a point where Orange to Lilac Cross Over Begins. 7.1.1 Existing Facilities (Highlighted on COR-O RDY ROLL3_UC) • Colonial Pipeline Company has three (3) petroleum lines within a single R/W in conflict with the proposed expressway from US 401 east to just east of Old McCullers Road (SR-2722). (Highlighted on COR-O RDY ROLL4_UC) • Colonial Pipeline Company has three (3) petroleum lines within a single R/W in conflict with the proposed expressway from west of Fanny Brown Road (SR-2723) to approximately 1,000 feet west of Holland Church Road (SR- 2725) • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway at the intersection of Holland Church Road (SR-2725) • Cardinal Pipeline Company has a gas line adjacent to Duke/Progress Energy transmission R/W in conflict with the proposed expressway at the intersection of Holland Church Road (SR-2725) 7.1.2 Future Facilities There are no future transmission facilities planned at this time 7.1.3 Prior Rights Colonial Pipeline Company — deeded R/W Cardinal Pipeline Company — deeded R/W Duke/Progress Energy — deeded R/W 7.1.4 Estimate Cost to NCTA for Relocation • Colonial Pipeline Company o US-401 to McCullers ■ Install 1,453 feet of new pipeline x 3 lines at $1K per foot per line o Fanny Brown to Holland Church Insta116,629 feet of new pipeline x 3 lines at $1 K per foot per line Cardinal Pipeline Company o Holland Church Rd. ■ Install 0.4 miles (2,116 feet) of new pipeline x 1 line at $2.OM per mile per line $4.359M $19.887M $801.S15K Page 26of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment • Duke/Progress Energy o Holland Church Road ■ Insta112,115 feet of new transmission line at $300 per foot per line 7.1.5 Estimated Time to Relocate • Colonial Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal • Cardinal Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 7.1.6 Restrictions and/or Moratoriums 12 months 12-18 months 12 months 12-18 months 12 months 12-18 months $634.SK • Colonial Pipeline Company o Cutover for pipelines are restricted during winter months • Cardinal Pipeline Company o Cutover for pipelines are restricted during winter months • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 7.1.7 Non-Utility Conflicts Observed During Investigation None Page 27of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 7.2 Segment — OxL (663+45.51 to 709+98.05) Lilac Corridor from a point where Orange ties to Lilac (Former Cross Over) (L1 Segment south of Orange was eliminated). 7.2.1 Existing Facilities (Highlighted on COR-L RDY ROLL2_UC) • Colonial Pipeline Company has three (3) petroleum lines within a single R/W in conflict with the proposed expressway from Huntwyck Drive just west of Joe Leach Rd. (SR-2730). 7.2.2 Future Facilities There are no future transmission facilities planned at this time 7.2.3 Prior Rights Colonial Pipeline Company — deeded R/W 7.2.4 Estimate Cost to NCTA for Relocation • Colonial Pipeline Company o Huntwyck Rd. and new corridor ■ Install 1,111 feet of new pipeline x 3 lines at $1K per foot per line 7.2.5 Estimated Time to Relocate • Colonial Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal 7.2.6 Restrictions and/or Moratoriums 12 months 12-18 months $3.333M • Colonial Pipeline Company o Cutover for pipelines are restricted during winter months 7.2.7 Non-Utility Conflicts Observed During Investigation None Page 28of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 7,3 Segment - L2 (716+83.95 to 865+00.00) Lilac Corridor from a point where Orange X-Over ties to Lilac to a point where the I-40 Interchange begins (Not Inclusive of I-40 Interchange). 7.3.1 Existing Facilities (Highlighted on COR-L_RDY ROLL3_UC) • Duke/Progress Energy has another 115KV transmission line on wood "H" structures in conflict with the proposed expressway approximately 1 mile east of Benson Road (NG50). 7.3.2 Future Facilities There are no future transmission facilities planned at this time 7.3.3 Prior Rights Duke/Progress Energy — deeded R/W 7.3.4 Estimate Cost to NCTA for Relocation • Duke/Progress Energy o East of Benson Rd. ■ Adjust span lengths and pole heights to accommodate 668ft. crossing of new corridor 7.3.5 Estimated Time to Relocate • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 7.3.6 Restrictions and/or Moratoriums 12 months 12-18 months $200.4K • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months Page 29of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 7.3.7 Non-Utility Conflicts Observed During Investigation • Waste Water Treatinent Pond & Spray Fields o Existing Facility Highlighted on COR-L_RDY ROLL3_UC ■ Lilac corridor in conflict with 1 existing wastewater pond and 7.05 acres of spray field at the Wrenn Road Wastewater Treatment Plant. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly from the amount estimated below) ■ $lO.OM o Estimated Time per tower to Relocate ■ Acquisition of new site • 12-24 months ■ Permitting/Construction/Cutover/Removal • 12-24 months o Restrictions and / or Moratoriums ■ Unknown Page 30of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 7,4 Segment - L3 (865+00.00 to 937+80.98) Lilac Corridar I-40 interchange (Builds only the portion of the I-40 Interchange needed to complete R-2829). 7.4.1 Existing Facilities (Highlighted on COR-L_RDY ROLL4_UC) • Cardinal Pipeline Company has a gas line that traverses east to west through the interchange of I-40 and the proposed Lilac corridor. 7.4.2 Future Facilities There are no future transmission facilities planned at this time 7.4.3 Prior Rights Cardinal Pipeline Company — deeded R/W 7.4.4 Estimate Cost to NCTA for Relocation • Cardinal Pipeline Company o I-40Interchange ■ Insta110.27 miles (1,427ft)of new pipeline x 1 line at $2.OM per mile per line 7.4.5 Estimated Time to Relocate • Cardinal Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal 7.4.6 Restrictions and/or Moratoriums $540.53K 12 months 12-18 months • Cardinal Pipeline Company o Cutover for pipelines are restricted during winter months Page 31of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 7.4.7 Non-Utility Conflicts Observed During Investigation • Waste Water Treatment Ponds & Spray Fields o Existing Facility Highlighted on COR-L_RDY ROLL3_UC ■ Lilac corridor in conflict with 1 existing wastewater pond and 7.05 acres of spray field at the Wrenn Road Wastewater Treatment Plant. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly from the amount estimated below) ■ $lO.OM o Estimated Time per tower to Relocate ■ Acquisition of new site • 12-24 months ■ Permitting/Construction/Cutover/Removal • 12-24 months o Restrictions and / or Moratoriums ■ Unknown Page 32of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 7,5 Segment - L4 (937+80.98 to 984+98.45) Lilac Corridor from I-40 (Completes I-40 Interchange) to a point where Lilac Cross Overs begin. 7.5.1 Existing Facilities (Highlighted on COR-L_RDY ROLL4_UC) • Cardinal Pipeline Company has a gas line that traverses east to west through the interchange of I-40 and the proposed Lilac corridor. 7.5.2 Future Facilities There are no future transmission facilities planned at this time 7.5.3 Prior Rights Cardinal Pipeline Company - deeded R/W 7.5.4 Estimate Cost to NCTA for Relocation • Cardinal Pipeline Company o I-40Interchange ■ Insta110.9 miles (4,767ft) of new pipeline x 1 line at $2.OM per mile per line 7.5.5 Estimated Time to Relocate • Cardinal Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal 7.5.6 Restrictions and/or Moratoriums 12 months 12-18 months $1.806M • Cardinal Pipeline Company o Cutover for pipelines are restricted during winter months 7.5.7 Non-Utility Conflicts Observed During Investigation None Page 33of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 7,6 Segment - L5 (984+98.45 1012+50.98) Lilac Corridor crosses over to Green Corridor. 7.6.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 7.6.2 Future Facilities There are no future transmission facilities planned at this time 7.6.3 Prior Rights N/A 7.6.4 Estimate Cost to NCTA for Relocation N/A 7.6.5 Estimated Time to Relocate N/A 7.6.6 Restrictions and/or Moratoriums N/A 7.6.7 Non-Utility Conflicts Observed During Investigation None Page 34of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 �� Utility Impact Assessment Segment - L6 (984+98.45 to 1031+75.65) Lilac Corridor cross over to Brown Corridor. 7.7.1 Existing Facilities (Highlighted on COR-L_RDY ROLLSA_UC) • Duke/Progress Energy has a SOOKV transmission line on steel lattice structures in conflict with the proposed expressway approximately 3,000 feet east of White Oak Road • Cardinal Pipeline Company has a gas transmission line in conflict with the propose expressway approximately 3,000 feet east of White Oak Road. This portion of the pipeline is parallel with the Duke/Progress Energy SOOKV transmission line. 7.7.2 Future Facilities There are no future transmission facilities planned at this time 7.7.3 Prior Rights Cardinal Pipeline Company — deeded R/W Duke/Progress Energy — deeded R/W 7.7.4 Estimate Cost to NCTA for Relocation • Cardinal Pipeline Company o East of White Oak ■ Adjustment to 0.09 miles (452 feet) of transmission line to account for fill $2.OM per mile per line • Duke/Progress Energy o East of White Oak ■ Adjust span lengths and structure heights to accommodate 446ft crossing of new corridor 7.7.5 Estimated Time to Relocate • Cardinal Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 12 months 12-18 months 12 months 18-24 months $171.2K $223K Page 35of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 7.7.6 Restrictions and/or Moratoriums Cardinal Pipeline Company o Cutover for pipelines are restricted during winter months Duke/Progress Energy o Cutover for transmission lines are restricted during winter and suminer months 7.7.7 Non-Utility Conflicts Observed During Investigation None Page 36of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 7,8 Segment — G2L (1055+84.23 to 1158+00.00) Portion of Green Corridor from a point where Lilac ties to Green to a point where Teal ties to Green. 7.8.1 Existing Facilities (Highlighted on COR-G RDY ROLLI_UC) • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway approximately 3,000 feet south of US-70 (Business) 7.8.2 Future Facilities There are no future transmission facilities planned at this time 7.8.3 Prior Rights Duke/Progress Energy — deeded R/W 7.8.4 Estimate Cost to NCTA for Relocation • Duke/Progress Energy o South of US-70 Business ■ Adjust span lengths and pole heights to accommodate 370ft. crossing of new corridor 7.8.5 Estimated Time to Relocate • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 7.8.6 Restrictions and/or Moratoriums 12 months 12-18 months $111K • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 7.8.7 Non-Utility Conflicts Observed During Investigation • None Page 37of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 7, 9 Utility Impact Assessment Segment — B1L (1085+00.00 to 1206+00.00) Portion of Brown Corridor from a point where Lilac ties to Brown to a point where Tan ties to Brown. 7.9.1 Existing Facilities (Highlighted on COR-B RDY ROLL3_UC) • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway approximately 800 feet north of Guy Road 7.9.2 Future Facilities There are no future transmission facilities planned at this time 7.9.3 Prior Rights Duke/Progress Energy — deeded R/W 7.9.4 Estimate Cost to NCTA for Relocation • Duke/Progress Energy o North of Guy Road ■ Adjust span lengths and pole heights to accommodate 352ft. crossing of new corridor 7.9.5 Estimated Time to Relocate • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 7.9.6 Restrictions and/or Moratoriums 12 months 18-24 months $105.6K • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 7.9.7 Non-Utility Conflicts Observed During Investigation None Page 38of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 8 Plum Corridor (no longer being considered) Page 39of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 9 Red Corridor 9,1 Segment — R1 (386+31.44 to 495+00.00) Red Corridor from Orange to US 401 (Builds only the portion of the US 401 Interchange needed to complete R-2721). 9.1.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 9.1.2 Future Facilities There are no future transmission facilities planned at this time 9.1.3 Prior Rights N/A 9.1.4 Estimate Cost to NCTA for Relocation N/A 9.1.5 Estimated Time to Relocate N/A 9.1.6 Restrictions and/or Moratoriums N/A 9.1.7 Non-Utility Conflicts Observed During Investigation • Cell Tower o Existing Facility (Highlighted on COR-R_RDY ROLLI UC) ■ Crown Castle Tower has a cell tower site near the intersection of Caddy Road and Fayetteville (US-401) in conflict with new expressway. o Prior Rights ■ Deeded property o Estimated Cost per tower to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly from the amount estimated helow) ■ $1.OM o Estimated Time per tower to Relocate ■ Acquisition of new site 6-12 months ■ Permitting/Construction/Cutover/Removal 12-24 months o Restrictions and / or Moratoriums ■ Permits and existing contracts with tenants may impact schedules for relocations and / or transfers to new tower site. Page 40of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 9,2 Segment — R2 (495+00.00 to 618+00.00) Red Corridor from US 401 to a point where Red Mod (Former Corridor) ties to Red (Builds the remaining portion of the US 401 interchange). 9.2.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 9.2.2 Future Facilities There are no future transmission facilities planned at this time 9.2.3 Prior Rights N/A 9.2.4 Estimate Cost to NCTA for Relocation N/A 9.2.5 Estimated Time to Relocate N/A 9.2.6 Restrictions and/or Moratoriums N/A 9.2.7 Non-Utility Conflicts Observed During Investigation None Page 41of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 9,3 Segment - R3 (618+00.0o to 854+72.00) Red Corridor from a point where Red Mod (Former Corridor) ties to Red west of Old Stage Rd to a point where Red Mod (Former Corridor) ties back to Red west of I-40. 9.3.1 Existing Facilities (Highlighted on COR-R_RDY ROLL3_UC) • AT&T has a Remote Terminal Site in conflict with the proposed expressway at Vandora Springs Road. just north of roundabout with Buffaloe Road 9.3.2 Future Facilities There are no future transmission facilities planned at this time 9.3.3 Prior Rights AT&T - property owner 9.3.4 Estimate Cost to NCTA for Relocation • AT&T o Vandora Springs Rd. just north of roundabout with Buffaloe Rd. 9.3.5 Estimated Time to Relocate • AT&T o Acquisition of new site o Construction/Cutover/Removal 9.3.6 Restrictions and/or Moratoriums None 6-12 months 12-18 months 9.3.7 Non-Utility Conflicts Observed During Investigation None $400K Page 42of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 9,4 Segment — R4 (854+72.00 to 916+28.91) Red Corridor from a point where Red Mod (Former Corridor) ties back to Red west of I-40 to I-40 (Includes building only a portion of I-40 need to complete R-2828). 9.4.1 Existing Facilities (Highlighted on COR-R RDY ROLLS_UC) • Duke/Progress Energy has three (3) parallel llSKV transmission lines residing in a common right-of-way in conflict with the interchange of the new expressway and I-40. o All three (3) lines in parallel are in conflict for about 600 feet o Two (2) lines in parallel on "H" wood structures continue in conflict for an additiona12,600 feet o One (1) line on single wood poles continues in conflict for an additional 3,500 feet. 9.4.2 Future Facilities There are no future transmission facilities planned at this time 9.4.3 Prior Rights Duke/Progress Energy — deeded R/W 9.4.4 Estimate Cost to NCTA for Relocation • Duke/Progress Energy o Interchange of I-40 and Red corridor ■ Install 6,091 feet of transmission line on wood "H" structures ■ Install 6,031 feet of transmission line on wood "H" structures ■ Install 3,240 feet of transmission line on single wood poles 9.4.5 Estimated Time to Relocate • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 9.4.6 Restrictions and/or Moratoriums 12 months 12-18 months $1.827M $1.809M $972K • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 9.4.7 Non-Utility Conflicts Observed During Investigation None Page 43of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 9,5 Segment — R5 (916+28.91 to 986+64.48) Red Corridor from R4 to cross over for Red to Mint and Red to Green (Includes building the remaining portion of the I-40 Interchange). 9.5.1 Existing Facilities (Highlighted on COR-R RDY ROLL6 UC) • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway at approximately 2,800 southwest of US-70 near Waterfield Drive. 9.5.2 Future Facilities There are no future transmission facilities planned at this time 9.5.3 Prior Rights Duke/Progress Energy — deeded R/W 9.5.4 Estimate Cost to NCTA for Relocation • Duke/Progress Energy o Southwest of US-70 near Waterfield Dr. ■ Adjust span lengths and pole heights to accommodate 668ft. crossing of new corridor 9.5.5 Estimated Time to Relocate • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 9.5.6 Restrictions and/or Moratoriums 12 months 12-18 months $13 8.6K • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 9.5.7 Non-Utility Conflicts Observed During Investigation None Page 44of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 9,6 Segment — R6 & R7 (986+64.48 to 1064+00.00) R6 - Red Corridor cross over from Red to Green and; R7 - Red Corridor cross over from Red to Mint. 9.6.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 9.6.2 Future Facilities There are no future transmission facilities planned at this time 9.6.3 Prior Rights N/A 9.6.4 Estimate Cost to NCTA for Relocation N/A 9.6.5 Estimated Time to Relocate N/A 9.6.6 Restrictions and/or Moratoriums N/A 9.6.7 Non-Utility Conflicts Observed During Investigation • FAA Air Traffic Control Antenna o Existing Facility (Highlighted on COR-R_RDY ROLL6 UC) ■ The FAA has an antenna site for air traffic control near the intersection of Rock Quarry Road and Old Baucom Road that is in conflict with new expressway. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may c�eviate greatly frorn the amount estimated below) ■ $SOOK o Estimated Time to Relocate ■ Acquisition of new site • 6-12 months ■ Permitting/Construction/Cutover/Removal • 12-24 months o Restrictions and / or Moratoriums ■ May have to obtain permits from various regulatory agencies prior to relocating this facility. Page 45of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 10 Red Modified Corridor (no longer being considered) Page 46of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 11 Blue Corridor 11.1 Segment — BL1 (478+00.00 to 505+00.00) Blue Corridor from a point before the US 401 Interchange to a point just after the US 401 (Builds only the Portion of US 401 needed to complete R-2721). 11.1.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 11.1.2 Future Facilities There are no future transmission facilities planned at this time 11.1.3 Prior Rights N/A 11.1.4 Estimate Cost to NCTA for Relocation N/A 11.1.5 Estimated Time to Relocate N/A 11.1.6 Restrictions and/or Moratoriums N/A 11.1.7 Non-Utility Conflicts Observed During Investigation • Cell Tower o Existing Facility (Highlighted on COR-BL_RDY ROLL01 UC) ■ Crown Castle Tower has a cell tower site near the intersection of US-401 in conflict with new expressway. o Prior Rights ■ Deeded property o Estimated Cost per tower to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly fi�om the amount estimated below) ■ $1.OM o Estimated Time per tower to Relocate ■ Acquisition of new site 6-12 months ■ Permitting/Construction/Cutover/Removal 12-24 months o Restrictions and / or Moratoriums ■ Permits and existing contracts with tenants may impact schedules for relocations and / or transfers to new tower site. Page 47of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 11,2 Segment — BLZ (505+00.00 to 680+69.89) Blue Corridor from US 401 (Builds the Remaining Portion of US 401 Interchange) to a point after the Old Stage Road Interchange. 11.2.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 11.2.2 Future Facilities There are no future transmission facilities planned at this time 11.2.3 Prior Rights N/A 11.2.4 Estimate Cost to NCTA for Relocation N/A 11.2.5 Estimated Time to Relocate N/A 11.2.6 Restrictions and/or Moratoriums N/A 11.2.7 Non-Utility Conflicts Observed During Investigation None Page 48of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 11,3 Segment — BL3 (680+69.89 to 550+50.00) Blue Corridor from a point after Old Stage Road Interchange to where Blue Crossover to Lilac picks up. 11.3.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 11.3.2 Future Facilities There are no future transmission facilities planned at this time 11.3.3 Prior Rights N/A 11.3.4 Estimate Cost to NCTA for Relocation N/A 11.3.5 Estimated Time to Relocate N/A 11.3.6 Restrictions and/or Moratoriums N/A 11.3.7 Non-Utility Conflicts Observed During Investigation None Page 49of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 11,4 Segment — BLxL (850+50.0o to 958+13.12) Blue Corridor Crossover to Lilac ties in to the middle of Lilac segment L2. 11.4.1 Existing Facilities (Highlighted on COR-BL_RDY ROLLOS_UC) • Colonial Pipeline Company has three (3) petroleum lines within a single R/W in conflict with the proposed expressway just to the east of Benson Road (NC- 50) 11.4.2 Future Facilities There are no future transmission facilities planned at this time 11.4.3 Prior Rights Colonial Pipeline Company — deeded R/W 11.4.4 Estimate Cost to NCTA for Relocation • Colonial Pipeline Company o West of Benson Rd. (NG50) ■ Install 496 feet of new pipeline x 3 lines at $1K per foot per line 11.4.5 Estimated Time to Relocate • Colonial Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal 11.4.6 Restrictions and/or Moratoriums 12 months 12-18 months $1.488M • Colonial Pipeline Company o Cutover for pipelines are restricted during winter months 11.4.7 Non-Utility Conflicts Observed During Investigation None Page SOof 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 11,5 Segment - L2BL (794+00.00 to 937+80.98) Portion of Lilac Corridor that ties the Blue Corridar to a common segment break between L2 & L3. 11.5.1 Existing Facilities (Highlighted on COR-L_RDY ROLL3_UC) • Duke/Progress Energy has another 115KV transmission line on wood "H" structures in conflict with the proposed expressway approximately 1 mile east of Benson Road (NG50). 11.5.2 Future Facilities There are no future transmission facilities planned at this time 11.5.3 Prior Rights Duke/Progress Energy — deeded R/W 11.5.4 Estimate Cost to NCTA for Relocation • Duke/Progress Energy o East of Benson Rd. ■ Adjust span lengths and pole heights to accommodate 668ft. crossing of new corridor 11.5.5 Estimated Time to Relocate • Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 11.5.6 Restrictions and/or Moratoriums 12 months 12-18 months $200.4K • Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months Page Slof 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 11.5.7 Non-Utility Conflicts Observed During Investigation Waste Water Treatinent Pond & Spray Fields o Existing Facility Highlighted on COR-L_RDY ROLL3_UC ■ Lilac corridor in conflict with 1 existing wastewater pond and 7.05 acres of spray field at the Wrenn Road Wastewater Treatment Plant. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly from the amount estimated below) ■ $lO.OM o Estimated Time per tower to Relocate ■ Acquisition of new site • 12-24 months ■ Permitting/Construction/Cutover/Removal • 12-24 months o Restrictions and / or Moratoriums ■ Unknown Page 52of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 12 Utility Impact Assessment Purple Corridor 12.1 Segment — 01PU (21+45.00 to 197+34.10) Orange Corridor from the Beginning of the Project to a point where the Purple Corridor ties. 12.1.1 Existing Facilities (Highlighted on COR-O RDY ROLLI_UC) • Colonial Pipeline Company has a single petroleum line in conflict with proposed expressway at the intersection of Sunset Lake Road (SR-1301) (Highlighted on COR-O_RDY ROLL2_UC) • AT&T has a Remote Terminal Site in conflict with the proposed improvements to Holly Springs Road (SR-1152) just across from Fairview Street 12.1.2 Future Facilities There are no future transmission facilities planned at this time 12.1.3 Prior Rights Colonial Pipeline Company — deeded R/W AT&T — owner of property 12.1.4 Estimate Cost to NCTA for Relocation • Colonial Pipeline Company o Sunset Lake Road (SR-1301) $2.769M ■ Insta112,769 feet of new pipeline x 1 line at $1 K per foot per line • AT&T o Holly Springs Rd. 12.1.5 Estimated Time to Relocate • Colonial Pipeline Company o Acquisition of new R/W and Design 12 months o Construction/Cutover/Removal 12-18 months • AT&T o Acquisition of new site 6-12 months o Construction/Cutover/Removal 12-18 months 12.1.6 Restrictions and/or Moratoriums $400K • Colonial Pipeline Company o Cutover for pipelines are restricted during winter months Page 53of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 12.1.7 Non-Utility Conflicts Observed During Investigation Warning Siren — Nuclear Plant o Existing Facility (Highlighted on COR-O_RDY ROLL2_UC) ■ Duke/Progress Energy has a warning siren for a nearby nuclear plant located on Kildare Road just to the northwest of Holly Springs Road. o Prior Rights ■ Deeded property o Estimated Cost to NCTA for Relocation (Note: actual cost will be part of real estate settlement and may deviate greatly from the amount estimated below) ■ $SOK o Estimated Time to Relocate ■ Acquisition of new site • 6-12 months ■ Permitting/Construction/Cutover/Removal • 12-18 months o Restrictions and / or Moratoriums ■ Duke/Progress Energy may have to obtain permits from various regulatory agencies prior to relocating this facility. Page 54of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 12,2 Segment — PU1 (195+84.46 to 338+53.25) Purple Corridar from Orange Corridor to a point after the Optimist Farm Road crossing. 12.2.1 Existing Facilities (Highlighted on COR-PU RDY ROLL01_UC) • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway just west of Pierce Olive Road. (Highlighted on COR-PU RDY ROLL02_UC) • Duke/Progress Energy has a 115KV transmission line on wood "H" structures in conflict with the proposed expressway at the end of Draycroft Place. • Cardinal Pipeline Company has a gas transmission line in conflict with the proposed expressway at the end of Draycroft Place. 12.2.2 Future Facilities There are no future transmission facilities planned at this time 12.2.3 Prior Rights Cardinal Pipeline Company — deeded R/W Duke/Progress Energy — deeded R/W 12.2.4 Estimate Cost to NCTA for Relocation • Cardinal Pipeline Company o Draycroft Place ■ Adjustment to 0.1 miles (536 feet) of transmission line to account for fill $2.OM per mile per line • Duke/Progress Energy o Draycroft Place ■ Adjust span lengths and structure heights to accommodate 712ft crossing of new corridor o Pierce Olive Road ■ Adjust span lengths and pole heights to accommodate 356ft. crossing of new corridor $203.OK $273.6K $106.8K Page SSof 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 12.2.5 Estimated Time to Relocate Cardinal Pipeline Company o Acquisition of new R/W and Design o Construction/Cutover/Removal Duke/Progress Energy o Acquisition of new R/W and Design o Construction/Cutover/Removal 12.2.6 Restrictions and/or Moratoriums 12 months 12-18 months 12 months 18-24 months Cardinal Pipeline Company o Cutover for pipelines are restricted during winter months Duke/Progress Energy o Cutover for transmission lines are restricted during winter and summer months 12.2.7 Non-Utility Conflicts Observed During Investigation None Page 56of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment 12,3 Segment — PU2 (338+53.25 to 478+00.00) Purple Corridor from the point after the Optimist Farm Road crossing to a point before the US 401 Blue Corridor Interchange. 12.3.1 Existing Facilities No facilities exist in this segment that would exceed $250K to relocate. 12.3.2 Future Facilities N/A 12.3.3 Prior Rights N/A 12.3.4 Estimate Cost to NCTA for Relocation N/A 12.3.5 Estimated Time to Relocate N/A 12.3.6 Restrictions and/or Moratoriums N/A 12.3.7 Non-Utility Conflicts Observed During Investigation None Page 57of 57 Triangle Expressway Southeast Extension Revised: 11/19/2014 R-2721, R-2828, R-2829 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $z 769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $40Q000 $40Q000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" shuctures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Rem-1,060ft Inst-2,04Sft 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 Rem-180ft Inst-357ft Q� Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 Springs Rd. Nuclear Plans 02 Lake Wheeler Rd. to US-401 Petroleum line x 3 $g 576,000 $9,576,000 Rem-2,955ft Inst-3,192ft 03 US-401 to Old McCullers Rd. (SR- Petroleum line x 3 $4,359,000 $4,359,000 Z 2722) Rem-1,323ft Inst-1,453ft W O3 Fanny Brown Rd. (SR-2723) to Petroleum lines x 3 $19 887 000 $19,887,000 W Holland Church Rd. (SR-2725) Rem-6,473ft Inst-6,629ft � 115KV Transmission line Gas transmission line � 03 Holland Church Rd. (SR-2725) Wood "H" structures $634,500 Rem-607ft Inst-2,116ft $$01,515 $1,436,015 � Rem-594ft Inst-2,115ft � 115KV Transmission line � 03 East of NG50 Wood "H" structures $364,200 Petroleum line x 3 $3,408,000 $3,772,200 QRem-570ft Inst-1,214ft Rem-640ft Inst-1,136ft � 04 No conflicts greater than $250K $0 O G1 No conflicts greater than $250K $0 115KV Transmission line G2 South of US 70 Business �/�/ood "H" structures $111,000 $111,000 Adj spans and pole height for 370ft crossin G3 No conflicts greater than $250K $0 G4 Near intersection of Rock Quarry FAA Air Traffic Control $500,000 $500,000 Rd. & Old Baucom Rd. 115KV Transmission line GS 1,600 feet NE of Battle Bridge Rd. Wood "H" structures $105,600 $105,600 (SR-2552) Adj spans and pole height for 352ft crossin G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $2,094,600 $400,000 $801,515 $47,214,000 $0 $0 $1,550,000 $52,060,115 1 of 17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" structures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Rem-1,060ft Inst-2,04Sft 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 Rem-180ft Inst-357ft 01 Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 Z Springs Rd. Nuclear Plans W 02 Lake Wheeler Rd. to US-401 Petroleum line x 3 $g 576,000 $9,576,000 �J,J Rem-2,955ft Inst-3,192ft � 03 US-401 to Old McCullers Rd. (SR- Petroleum line x 3 $4,359,000 $4,359,000 (' 2722) Rem-1,323ft Inst-1,453ft � Fanny Brown Rd. (SR-2723) to Petroleum lines x 3 � 03 Holland Church Rd. (SR-2725) Rem-6,473ft Inst-6,629ft $19,887,000 $19,887,000 Z115KV Transmission line Gas transmission line � 03 Holland Church Rd. (SR-2725) Wood "H" structures $634,500 Rem-607ft Inst-2,116ft $$01,515 $1,436,015 Z Rem-594ft Inst-2,115ft (V W 115KV Transmission line Petroleum line x 3 � 03 East of NG50 Wood "H" structures $364,200 Rem-640ft Inst-1,136ft $3,405,000 $3,772,200 Rem-570ft Inst-1,214ft (' 04 No conflicts greater than $250K $0 � � G1 No conflicts greater than $250K $0 Z 115KV Transmission line a G2 South of US 70 Business Wood "H" structures $111,000 $111,000 � Adj spans and pole height for Q 370ft crossin G3 No conflicts greater than $250K $0 M1 Near intersection of Rock Quarry FAA Air Traffic Control $500,000 $500,000 Rd. & Old Baucom Rd. 115KV Transmission line MZ 1,600 feet north of Battle Bridge Wood "H" structures $105,900 $105,900 Rd. (SR-2552) Adj spans and pole height for 353ft crossin G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $2,094,900 $400,000 $801,515 $47,214,000 $0 $0 $1,550,000 $52,060,415 2of17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" structures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Rem-1,060ft Inst-2,04Sft 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 Rem-180ft Inst-357ft Z �� Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 W Springs Rd. Nuclear Plans �JJ 02 Lake Wheeler Rd. to US-401 Petroleum line x 3 $g 576,000 $9,576,000 � Rem-2,955ft Inst-3,192ft 03 US-401 to Old McCullers Rd. (SR- Petroleum line x 3 $4,359,000 $4,359,000 � 2722) Rem-1,323ft Inst-1,453ft Z O3 Fanny Brown Rd. (SR-2723) to Petroleum lines x 3 $19,887,000 $19,887,000 Q Holland Church Rd. (SR-2725) Rem-6,473ft Inst-6,629ft � 115KV Transmission line Gas transmission line Z 03 Holland Church Rd. (SR-2725) Wood "H" structures $634,500 Rem-607ft Inst-2,116ft $$01,515 $1,436,015 M � Rem-594ft Inst-2,115ft 115KV Transmission line Petroleum line x 3 � 03 East of NG50 Wood "H" structures $364,200 Rem-640ft Inst-1,136ft $3,405,000 $3,772,200 � Rem-570ft Inst-1,214ft mi 04 No conflicts greater than $250K $0 W � G1 No conflicts greater than $250K $0 QSOOKV Transmission line Gas transmission line � B1 3,000' east of White Oak Rd. on steel structures $223,000 Adjust-452ft $171,212 $394,212 O Adj spans and structure hei ht for 446ft crossin to account for cuUfill 115KV Transmission line 61 800' north of Guy Rd. Wood "H" structures $105,600 $105,600 Adj spans and pole height for 352ft crossin 115KV Transmission line T1 900' north of Battle Bridge Rd. Wood "H" structures $135,000 $135,000 Adj spans and pole height for 450ft crossin G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $2,341,600 $400,000 $972,727 $47,214,000 $0 $0 $1,050,000 $51,978,327 3of17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" structures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Rem-1,060ft Inst-2,04Sft 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 Rem-180ft Inst-357ft 01 Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 Springs Rd. Nuclear Plans 02 Lake Wheeler Rd. to US-401 Petroleum line x 3 $g 576,000 $9,576,000 Rem-2,955ft Inst-3,192ft Z 03 US-401 to Old McCullers Rd. (SR- Petroleum line x 3 $4,359,000 $4,359,000 W 2722) Rem-1,323ft Inst-1,453ft W O3 Fanny Brown Rd. (SR-2723) to Petroleum lines x 3 $19,887,000 $19,887,000 � Holland Church Rd. (SR-2725) Rem-6,473ft Inst-6,629ft � 115KV Transmission line Gas transmission line Z 03 Holland Church Rd. (SR-2725) Wood "H" structures $634,500 $801,515 $1,436,015 Rem-594ft Inst-2,115ft Rem-607ft Inst-2,116ft �j 115KV Transmission line Petroleum line x 3 �� 03 East of NG50 Wood "H" structures $364,200 Rem-640ft Inst-1,136ft $3,405,000 $3,772,200 Rem-570ft Inst-1,214ft m04 No conflicts greater than $250K $0 W (' G1 No conflicts greater than $250K $0 QSOOKV Transmission line Gas transmission line � B1 3,000' east of White Oak Rd. on steel structures $223,000 Adjust-452ft $171,212 $394,212 Adj spans and structure � hei ht for 446ft crossin to account for cuUfill 115KV Transmission line 61 800' north of Guy Rd. Wood "H" structures $105,600 $105,600 Adj spans and pole height for 352ft crossin Area along corridor from Old Baucom Rd. 2,300 feet north to Wastewater Spray Fields B2 connection with Brown corridor (B- 33 acres $a�250,000 $8,250,000 3 Area along corridor from B3 connection with Brown (B-2) north Wastewater Spray Fields $2 500,000 $2,500,000 to 1,100 feet north of Battle Bridge 10 acres Rd. G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $2,206,600 $400,000 $972,727 $47,214,000 $0 $0 $11,800,000 $62,593,327 4of17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" structures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Z Rem-1,060ft Inst-2,04Sft �J,J 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 W Rem-180ft Inst-357ft � 01 Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 � Springs Rd. Nuclear Plans � 02 Lake Wheeler Rd. to US-401 Petroleum line x 3 $g 576,000 $9,576,000 Z Rem-2,955ft Inst-3,192ft � 03 US-401 to Old McCullers Rd. (SR- Petroleum line x 3 $4,359,000 $4,359,000 O 2722) Rem-1,323ft Inst-1,453ft � 03 Fanny Brown Rd. (SR-2723) to Petroleum lines x 3 $19,887,000 $19,887,000 m Holland Church Rd. (SR-2725) Rem-6,473ft Inst-6,629ft � 115KV Transmission line Gas transmission line J 03 Holland Church Rd. (SR-2725) Wood "H" structures $634,500 $801,515 $1,436,015 � `Q Rem-594ft Inst-2,115ft Rem-607ft Inst-2,116ft � 115KV Transmission line Petroleum line x 3 � 03 East of NG50 Wood "H" structures $364,200 Rem-640ft Inst-1,136ft $3,405,000 $3,772,200 Z Rem-570ft Inst-1,214ft W04 No conflicts greater than $250K $0 � G1 No conflicts greater than $250K $0 � 115KV Transmission line (� G2 South of US 70 Business �/�/ood "H" structures $111,000 $111,000 Z Adj spans and pole height for Q 370ft crossin � Area along corridor from Old O Baucom Rd. 2,300 feet north to Wastewater Spray Fields TL1 connection with Brown corridor (B- 33 acres $$�250,000 $8,250,000 3 Area along corridor from B3 connection with Brown (B-2) north Wastewater Spray Fields $2 500,000 $2,500,000 to 1,100 feet north of Battle Bridge 10 acres Rd. G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $1,989,000 $400,000 $801,515 $47,214,000 $0 $0 $11,800,000 $62,204,515 5of17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" structures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Rem-1,060ft Inst-2,04Sft 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 Rem-180ft Inst-357ft 01 Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 S rin s Rd. Nuclear Plans Z Near the intersection of Caddy Rd. W R1 & Fayetteville Rd. (US-401) Crown Castle Tower $1,000,000 $1,000,000 W � R2 No conflicts reater than $250K $0 � R3 Vandora Springs Rd. just north of Remote Terminal Site $400,000 $400,000 � roundabout with Buffaloe Rd. � 115KV Transmission line � �JJ R4 Interchange of I-40 and Red Wood "H" structures $1,527,300 $1,827,300 � corridor Rem-5,158ft Inst-6,091ft � W Interchange of I-40 and Red 115KV Transmission line (� R4 corridor Wood "H" structures $1,809,300 $1,809,300 Z Rem-5,040ft Inst-6,031ft a Interchange of I-40 and Red � 15KV Transmission line � R4 corridor Single pole structures $972,000 $972,000 O Rem3,236ft Inst-3,240ft 115KV Transmission line R5 2�800' SW of US-70 near Wood "H" structures $138,600 $138,600 Waterfield Dr. Adj spans and pole height for 461 ft crossin R6&7 Near intersection of Rock Quarry FAA Air Traffic Control $500,000 $500,000 Rd. & Old Baucom Rd. 115KV Transmission line G5 1,600 feet NE of Battle Bridge Rd. Wood "H" structures $105,600 $105,600 (SR-2552) Adj spans and pole height for 352ft crossin G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $5,732,100 $800,000 $0 $9,984,000 $0 $0 $2,550,000 $19,066,100 6of17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" structures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Rem-1,060ft Inst-2,04Sft 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 Rem-180ft Inst-357ft Z �� Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 �J,J S rin s Rd. Nuclear Plans W Near the intersection of Caddy Rd. � R1 & Fayetteville Rd. (US-401) Crown Castle Tower $1,000,000 $1,000,000 � � R2 No conflicts reater than $250K $0 ~ Vandora Springs Rd. just north of Z R3 roundabout with Buffaloe Rd. Remote Terminal Site $400,000 $400,000 � Interchange of I-40 and Red 115KV Transmission line ~ Q R4 corridor Wood "H" structures $1,527,300 $1,827,300 W Rem-5,158ft Inst-6,091ft 115KV Transmission line � R4 Interchange of I-40 and Red Wood "H" structures $1,809,300 $1,809,300 � corridor W Rem-5,040ft Inst-6,031ft � Interchange of I-40 and Red � 15KV Transmission line Z R4 corridor Single pole structures $972,000 $972,000 Q Rem3,236ft Inst-3,240ft � 115KV Transmission line 0 R5 2,800' SW of US-70 near Wood "H" structures $138,600 $138,600 Waterfield Dr. Adj spans and pole height for 461 ft crossin R6&7 Near intersection of Rock Quarry FAA Air Traffic Control $500,000 $500,000 Rd. & Old Baucom Rd. 115KV Transmission line MZ 1,600 feet north of Battle Bridge Wood "H" shuctures $105,900 $105,900 Rd. (SR-2552) Adj spans and pole height for 353ft crossin G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $5,732,400 $800,000 $0 $9,984,000 $0 $0 $2,550,000 $19,066,400 7of17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 PU Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 PU Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 01 PU Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 S rin s Rd. Nuclear Plans 115KV Transmission line PU1 �ust west of Pierce Olive Rd. Wood "H" structures $106,800 $106,800 SR 1389 Adj spans and pole height for 356ft crossin 115KV Transmission line Wood "H" structures Gas transmission line PU1 Draycroft Place Adj spans and pole height for $2�3,600 Adjust-536ft $203,030 $476,630 712ft crossin to account for cuUfill WPU2 No conflicts greater than $250K $0 W � BL1 Intersection with US-401 Crown Castle Tower $1,000,000 $1,000,000 � � BL2 No conflicts greater than $250K $0 �.% J BL3 No conflicts greater than $250K $0 BLxL 1,800 ft west of Benson Rd. (NC- Petroleum line x 3 $1,485,000 $1,485,000 � 50 Rem-473ft Inst-496ft = 115KV Transmission line J L26L 1 mile east of Benson Rd. Wood "H" structures $200,400 $200,400 � m Adj spans and pole height for � 668ft crossin W L26L Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 J 7.05 acres of S ra Field a L3 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 � 7.05 acres of S ra Field aL3 Interchange of I-40 Gas transmission line $540,530 $540,530 � Rem-977ft Inst-1,427ft W L4 Interchange of I-40 Gas transmission line g1,S05,681 $1,805,681 (j Rem-3,692ft Inst-4,767ft QL5 No conflicts greater than $250K $0 � 115KV Transmission line � G2L South of US 70 Business �/�/ood "H" structures $111,000 $111,000 Adj spans and pole height for 370ft crossin G3 No conflicts greater than $250K $0 G4 Near intersection of Rock Quarry FAA Air Traffic Control $500,000 $500,000 Rd. & Old Baucom Rd. 115KV Transmission line GS 1,600 feet NE of Battle Bridge Rd. Wood "H" structures $105,600 $105,600 (SR-2552) Adj spans and pole height for 352ft crossin G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,OOQ000 Total End to End Utility Cost $797,400 $400,000 $2,549,241 $4,257,000 $0 $0 $22,550,000 $30,553,641 8of17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 PU Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 PU Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 01 PU Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 S rin s Rd. Nuclear Plans 115KV Transmission line PU1 �ust west of Pierce Olive Rd. Wood "H" structures $106,800 $106,800 SR 1389 Adj spans and pole height for Z 356ft crossin W 115KV Transmission line Wood "H" structures Gas transmission line �JJ PU1 Draycroft Place Adj spans and pole height for $2�3,600 Adjust-536ft $203,030 $476,630 � 712ft crossin to account for cuUfill � � PU2 No conflicts greater than $250K $0 � Z BL1 Intersection with US-401 Crown Castle Tower $1,000,000 $1,000,000 � � BL2 No conflicts greater than $250K $0 Z WBL3 No conflicts greater than $250K $0 � BLxL 1,800 ft west of Benson Rd. (NC- Petroleum line x 3 $1,485,000 $1,485,000 � 50 Rem-473ft Inst-496ft � U 115KV Transmission line Q L26L 1 mile east of Benson Rd. Wood "H" structures $200,400 $200,400 J Adj spans and pole height for � J 668ft crossin � L26L Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 W 7.05 acres of S ra Field L3 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 m7.05 acres of S ra Field � L3 Interchange of I-40 Gas transmission line $540,530 $540,530 �J,J Rem-977ft Inst-1,427ft J L4 Interchange of I-40 Gas transmission line g1,S05,681 $1,805,681 Q. Rem-3,692ft Inst-4,767ft = L5 No conflicts greater than $250K $0 a 115KV Transmission line � W G2L South of US 70 Business �/�/ood "H" structures $111,000 $111,000 � Adj spans and pole height for Z 370ft crossing � G3 No conflicts greater than $250K $0 O M� Near intersection of Rock Quarry FAA Air Traffic Control $500,000 $500,000 Rd. R Old Baucom Rd. 115KV Transmission line M2 1,600 feet north of Battle Bridge Wood "H" structures $105,900 $105,900 Rd. (SR-2552) Adj spans and pole height for 353ft crossin G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $797,700 $400,000 $2,549,241 $4,257,000 $0 $0 $22,550,000 $30,553,941 9of17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 PU Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 PU Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 01 PU Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 S rin s Rd. Nuclear Plans 115KV Transmission line PU1 �ust west of Pierce Olive Rd. Wood "H" structures $106,800 $106,800 Z SR 1389 Adj spans and pole height for �jJ 356ft crossin �,L� 115KV Transmission line Gas transmission line � PU1 Draycroft Place Wood "H" structures $2�3,600 Adjust-536ft $203,030 $476,630 (' Adj spans and pole height for � 712ft crossin to account for cuUfill Z Q PU2 No conflicts greater than $250K $0 � � BL1 Intersection with US-401 Crown Castle Tower $1,000,000 $1,000,000 Z OBL2 No conflicts greater than $250K $0 BL3 No conflicts greater than $250K $0 m � 1,800 ft west of Benson Rd. (NC- Petroleum line x 3 $1,485,000 $1,485,000 V BLxL 50 Rem-473ft Inst-496ft a 115KV Transmission line � J L26L 1 mile east of Benson Rd. Wood "H" structures $200,400 $200,400 r J Adj spans and pole height for � W 668ft crossin J L26L Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 7.05 acres of S ra Field m L3 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 � W 7.05 acres of ra Field J L3 Interchange of I-40 Gas transmission line $540,530 $540,530 a Rem-977ft Inst-1,427ft � L4 Interchange of I-40 Gas transmission line g1,S05,681 $1,805,681 � Rem-3,692ft Inst-4,767ft a SOOKV Transmission line � on steel structures Gas transmission line W L6 3,000' east of White Oak Rd. Adj spans and structure $223,000 Adjust-452ft $171,212 $394,212 � hei ht for 446ft crossin to account for cuUfill Z 115KV Transmission line a B1L 800' north of Guy Rd. Wood "H" structures $105,600 $105,600 � Adj spans and pole height for 0 352ft crossin 115KV Transmission line T1 900' north of Battle Bridge Rd. Wood "H" structures $135,000 $135,000 Adj spans and pole height for 450ft crossin G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $1,044,400 $400,000 $2,720,453 $4,257,000 $0 $0 $22,050,000 $30,471,853 10 of 17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 PU Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 PU Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 01 PU Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 S rin s Rd. Nuclear Plans 115KV Transmission line PU1 �ust west of Pierce Olive Rd. Wood "H" structures $106,800 $106,800 SR 1389 Adj spans and pole height for 356ft crossin 115KV Transmission line Wood "H" structures Gas transmission line Z PU1 Draycroft Place Adj spans and pole height for $2�3,600 Adjust-536ft $203,030 $476,630 W 712ft crossin to account for cuUfill W � PU2 No conflicts greater than $250K $0 � Z BL1 Intersection with US-401 Crown Castle Tower $1,000,000 $1,000,000 � BL2 No conflicts greater than $250K $0 0 � BL3 No conflicts greater than $250K $0 m BLxL 1,800 ft west of Benson Rd. (NC- Petroleum line x 3 $1,485,000 $1,485,000 V 50 Rem-473ft Inst-496ft Q 115KV Transmission line J L26L 1 mile east of Benson Rd. Wood "H" structures $200,400 $200,400 J Adj spans and pole height for � � 668ft crossin � Wastewater Pond (1) and � L26L Off Wrenn Rd. $10,000,000 $10,000,000 J 7.05 acres of S ra Field m L3 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 � 7.05 acres of S ra Field W L3 Interchange of I-40 Gas transmission line $540,530 $540,530 J Rem-977ft Inst-1,427ft � L4 Interchange of I-40 Gas transmission line g1,S05,681 $1,805,681 = Rem-3,692ft Inst-4,767ft a SOOKV Transmission line on steel structures Gas transmission line � L6 3,000' east of White Oak Rd. $223,000 Adjust-452ft $171,212 $394,212 �JJ Adj spans and structure (' hei ht for 446ft crossin to account for cuUfill Z 115KV Transmission line a B1L 800' north of Guy Rd. Wood "H" structures $105,600 $105,600 � Adj spans and pole height for Q 352ft crossin Area along corridor from Old Baucom Rd. 2,300 feet north to Wastewater Spray Fields B2 connection with Brown corridor (B- 33 acres $$.250,000 $8,250,000 3 Area along corridor from B3 connection with Brown (B-2) north Wastewater Spray Fields $2 500,000 $2,500,000 to 1,100 feet north of Battle Bridge 10 acres Rd. G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $909,400 $400,000 $2,720,453 $4,257,000 $0 $0 $32,800,000 $41,086,853 11 of 17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 PU Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 PU Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 01 PU Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 S rin s Rd. Nuclear Plans Z 115KV Transmission line W Just west of Pierce Olive Rd. Wood "H" structures W PU1 SR 1389 Adj spans and pole height for $106,800 $106,800 � 356ft crossin (' 115KV Transmission line Gas transmission line Z PU1 Draycroft Place Wood "H" structures $2�3,600 Adjust-536ft $203,030 $476,630 � Adj spans and pole height for 712ft crossin to account for cuUfill � PU2 No conflicts greater than $250K $0 mi BL1 Intersection with US-401 Crown Castle Tower $1,000,000 $1,000,000 J WBL2 No conflicts greater than $250K $0 ~ BL3 No conflicts greater than $250K $0 Z 1,800 ft west of Benson Rd. (NC- Petroleum line x 3 W BLxL 50 Rem-473ft Inst-496ft �1,485,000 $1,485,000 W a/ 115KV Transmission line (7 L26L 1 mile east of Benson Rd. Wood "H" structures $200,400 $200,400 (V � Adj spans and pole height for � �.i 668ft crossin J L26L Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 7.05 acres of S ra Field J L3 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 W 7.05 acres of S ra Field � L3 Interchange of I-40 Gas transmission line $540,530 $540,530 J Rem-977ft Inst-1,427ft L4 Interchange of I-40 Gas transmission line g1,S05,681 $1,805,681 � Rem-3,692ft Inst-4,767ft J L5 No conflicts greater than $250K $0 � 115KV Transmission line � G2L South of US 70 Business �/�/ood "H" structures $111,000 $111,000 a Adj spans and pole height for � 370ft crossin W Area along corridor from Old � Baucom Rd. 2,300 feet north to Wastewater Spray Fields Z T�� connection with Brown corridor (B- 33 acres $8,250,000 $8,250,000 Q 3 � Area along corridor from � B3 connection with Brown (B-2) north Wastewater Spray Fields $2 500,000 $2,500,000 to 1,100 feet north of Battle Bridge 10 acres Rd. G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $691,800 $400,000 $2,549,241 $4,257,000 $0 $0 $32,800,000 $40,698,041 12 of 17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" structures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Rem-1,060ft Inst-2,04Sft 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 Rem-180ft Inst-357ft 01 Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 Springs Rd. Nuclear Plans 02 Lake Wheeler Rd. to US-401 Petroleum line x 3 $g 576,000 $9,576,000 Rem-2,955ft Inst-3,192ft 03L US-401 to Old McCullers Rd. (SR- Petroleum line x 3 $4,359,000 $4,359,000 2722) Rem-1,323ft Inst-1,453ft 03L Fanny Brown Rd. (SR-2723) to Petroleum lines x 3 $19,887,000 $19,887,000 Z Holland Church Rd. (SR-2725) Rem-6,473ft Inst-6,629ft 115KV Transmission line W Gas transmission line � 03L Holland Church Rd. (SR-2725) Wood "H" structures $634,500 Rem-607ft Inst-2,116ft $$01,515 $1,436,015 Rem-594ft Inst-2,115ft (' OXL Intersection of Lilac corridor and Petroleum line x 3 $3,333,000 $3,333,000 � Huntw ck Dr. Rem-616ft Inst-1,111ft (.i 115KV Transmission line M a L2 1 mile east of Benson Rd. Wood "H" shuctures $Z00,400 $20Q400 J Adj spans and pole height for � J 668ft crossin � �JJ L2 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 � 7.05 acres of S ra Field Z L3 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 Q 7.05 acres of S ra Field � L3 Interchange of I-40 Gas transmission line g540,530 $540,530 O Rem-977ft Inst-1,427ft L4 Interchange of I-40 Gas transmission line $1,505,681 $1,805,681 Rem-3,692ft Inst-4,767ft LS No conflicts greater than $250K $0 115KV Transmission line G2L South of US 70 Business Wood "H" structures g�11,000 $111,000 Adj spans and pole height for 370ft crossin G3 No conflicts greater than $250K $0 G4 Near intersection of Rock Quarry FAA Air Traffic Control $500,000 $500,000 Rd. & Old Baucom Rd. 115KV Transmission line G5 1,600 feet NE of Battle Bridge Rd. Wood "H" structures $105,600 $105,600 (SR-2552) Adj spans and pole height for 352ft crossin G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $1,930,800 $40Q000 $3,147,726 $47,139,000 $0 $0 $21,550,000 $74,167,526 13 of 17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" structures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Rem-1,060ft Inst-2,04Sft 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 Rem-180ft Inst-357ft 01 Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 Springs Rd. Nuclear Plans 02 Lake Wheeler Rd. to US-401 Petroleum line x 3 $g 576,000 $9,576,000 Z Rem-2,955ft Inst-3,192ft W 03L US-401 to Old McCullers Rd. (SR- Petroleum line x 3 $4,359,000 $4,359,000 W 2722) Rem-1,323ft Inst-1,453ft � 03L Fanny Brown Rd. (SR-2723) to Petroleum lines x 3 $19,887,000 $19,887,000 �e Holland Church Rd. (SR-2725) Rem-6,473ft Inst-6,629ft � 115KV Transmission line 03L Holland Church Rd. (SR-2725) Wood "H" structures $634,500 Gas transmission line gg01,515 $1,436,015 Z Rem-594ft Inst-2,115ft Rem-607ft Inst-2,116ft � OXL Intersection of Lilac corridor and Petroleum line x 3 $3,333,000 $3,333,000 � Huntw ck Dr. Rem-616ft Inst-1,111ft W115KV Transmission line �J,J L2 1 mile east of Benson Rd. Wood "H" shuctures $Z00,400 $20Q400 � Adj spans and pole height for � � 668ft crossin � L2 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 (� 7.05 acres of S ra Field a L3 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 J 7.05 acres of S ra Field --� L3 Interchange of I-40 Gas transmission line g540,530 $540,530 � Rem-977ft Inst-1,427ft L4 Interchange of I-40 Gas transmission line $1,505,681 $1,805,681 � Rem-3,692ft Inst-4,767ft Z Q LS No conflicts greater than $250K $0 � 115KV Transmission line O G2L South of US 70 Business Wood "H" structures g�11,000 $111,000 Adj spans and pole height for 370ft crossin G3 No conflicts greater than $250K $0 M1 Near intersection of Rock Quarry FAA Air Traffic Control $500,000 $500,000 Rd. & Old Baucom Rd. 115KV Transmission line M2 1,600 feet north of Battle Bridge Wood "H" structures $105,900 $105,900 Rd. (SR-2552) Adj spans and pole height for 353ft crossin G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $1,931,100 $400,000 $3,147,726 $47,139,000 $0 $0 $21,550,000 $74,167,826 14 of 17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" structures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Rem-1,060ft Inst-2,04Sft 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 Rem-180ft Inst-357ft 01 Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 Springs Rd. Nuclear Plans Z 02 Lake Wheeler Rd. to US-401 Petroleum line x 3 $g 576,000 $9,576,000 W Rem-2,955ft Inst-3,192ft W US-401 to Old McCullers Rd. (SR- Petroleum line x 3 � 03L 2722) Rem-1,323ft Inst-1,453ft $4,359,000 $4,359,000 � 03L Fanny Brown Rd. (SR-2723) to Petroleum lines x 3 $19,887,000 $19,887,000 Z Holland Church Rd. (SR-2725) Rem-6,473ft Inst-6,629ft 115KV Transmission line � 03L Holland Church Rd. (SR-2725) Wood "H" structures $634,500 Gas transmission line gg01,515 $1,436,015 � Rem-594ft Inst-2,115ft Rem-607ft Inst-2,116ft � OXL Intersection of Lilac corridor and Petroleum line x 3 $3,333,000 $3,333,000 Huntw ck Dr. Rem-616ft Inst-1,111ft � Q 115KV Transmission line �� L2 1 mile east of Benson Rd. Wood "H" shuctures $Z00,400 $20Q400 m Adj spans and pole height for � 668ft crossin V Wastewater Pond (1) and Q L2 Off Wrenn Rd. $10,000,000 $10,000,000 J 7.05 acres of S ra Field J L3 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 � 7.05 acres of S ra Field W L3 Interchange of I-40 Gas transmission line g540,530 $540,530 � Rem-977ft Inst-1,427ft Z L4 Interchange of I-40 Gas transmission line $1,505,681 $1,805,681 Q Rem-3,692ft Inst-4,767ft a/ 500KV Transmission line on steel structures Gas transmission line � L6 3,000' east of White Oak Rd. $223,000 Adjust-452ft $171,212 $394,212 Adj spans and structure hei ht for 446ft crossin to account for cuUfill 115KV Transmission line B1L 800' north of Guy Rd. Wood "H" structures $105,600 $105,600 Adj spans and pole height for 352ft crossin 115KV Transmission line T1 900' north of Battle Bridge Rd. Wood "H" structures $135,000 $135,000 Adj spans and pole height for 450ft crossin G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $2,177,800 $400,000 $3,318,938 $47,139,000 $0 $0 $21,050,000 $74,085,738 15of17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" structures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Rem-1,060ft Inst-2,04Sft 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 Rem-180ft Inst-357ft 01 Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 Springs Rd. Nuclear Plans 02 Lake Wheeler Rd. to US-401 Petroleum line x 3 $g 576,000 $9,576,000 Rem-2,955ft Inst-3,192ft 03L US-401 to Old McCullers Rd. (SR- Petroleum line x 3 $4,359,000 $4,359,000 Z 2722) Rem-1,323ft Inst-1,453ft �JJ 03L Fanny Brown Rd. (SR-2723) to Petroleum lines x 3 $19,887,000 $19,887,000 W Holland Church Rd. (SR-2725) Rem-6,473ft Inst-6,629ft 115KV Transmission line � 03L Holland Church Rd. (SR-2725) Wood "H" structures $634,500 Gas transmission line gg01,515 $1,436,015 � Rem-594ft Inst-2,115ft Rem-607ft Inst-2,116ft Z OXL Intersection of Lilac corridor and Petroleum line x 3 $3,333,000 $3,333,000 � Huntw ck Dr. Rem-616ft Inst-1,111ft O 115KV Transmission line � L2 1 mile east of Benson Rd. Wood "H" shuctures $Z00,400 $20Q400 � Adj spans and pole height for mi 668ft crossin � U L2 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 Q 7.05 acres of S ra Field J L3 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 J 7.05 acres of S ra Field ' Gas transmission line W L3 Interchange of I-40 $540,530 $540,530 � Rem-977ft Inst-1,427ft Z L4 Interchange of I-40 Gas transmission line $1,505,681 $1,805,681 Q Rem-3,692ft Inst-4,767ft � 500KV Transmission line on steel structures Gas transmission line Q L6 3,000' east of White Oak Rd. Adj spans and structure $zz3,000 Adjust-452ft $171,212 $394,212 hei ht for 446ft crossin to account for cuUfill 115KV Transmission line B1L 800' north of Guy Rd. Wood "H" structures $105,600 $105,600 Adj spans and pole height for 352ft crossin Area along corridor from Old Baucom Rd. 2,300 feet north to Wastewater Spray Fields BZ connection with Brown corridor (B- 33 acres $$,z50,000 $8,250,000 3 Area along corridor from B3 connection with Brown (B-2) north Wastewater Spray Fields $Z 500,000 $2,500,000 to 1,100 feet north of Battle Bridge 10 acres Rd. G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $2,042,800 $400,000 $3,318,938 $47,139,000 $0 $0 $31,800,000 $84,700,738 16of17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014 Utility Impact Assessment Matrix - End to End Conflicts >$250K EA Tele - hone Gas Transmission Gas Corridor Corridor At or near the intersection of new Cardinal Pipeline Colonial Pipeline Company Description Colors Segment expressway and: Duke/Progress Energy Transmission AT&T Williams Pi eline multi le steel lines Piedmont Natural Gas TV Towers, Cell Towers, FAA Towers, etc. Corridor Totals Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost Facilit Est. Cost 01 Sunset Lake Rd. (SR-1301) Petroleum line x 1 $2,769,000 $2,769,000 Rem-917ft Inst-2,769ft 01 Holly Springs Rd. (SR-1152) Remote Terminal Site $400,000 $400,000 115KV Transmission line 01 Pierce Olive Rd. (SR-1389) Wood "H" structures $879,300 $879,300 Rem-669ft Inst-2,931ft 01 West Lake Rd. (SR-1387) Petroleum line x 3 $6,144,000 $6,144,000 Rem-1,060ft Inst-2,04Sft 01 Bells Lake Rd. (SR-1386) Petroleum line x 3 $1,071,000 $1,071,000 Rem-180ft Inst-357ft Z �� Kildare Farm Rd. just west of Holly Warning Siren for nearby $50,000 $50,000 W Springs Rd. Nuclear Plans � 02 Lake Wheeler Rd. to US-401 Petroleum line x 3 $g 576,000 $9,576,000 Rem-2,955ft Inst-3,192ft � 03L US-401 to Old McCullers Rd. (SR- Petroleum line x 3 $4,359,000 $4,359,000 Z 2722) Rem-1,323ft Inst-1,453ft �j 03L Fanny Brown Rd. (SR-2723) to Petroleum lines x 3 $19,887,000 $19,887,000 O Holland Church Rd. (SR-2725) Rem-6,473ft Inst-6,629ft � 115KV Transmission line Gas transmission line m 03L Holland Church Rd. (SR-2725) Wood "H" structures $634,500 Rem-607ft Inst-2,116ft $$01,515 $1,436,015 � Rem-594ft Inst-2,115ft J OXL Intersection of Lilac corridor and Petroleum line x 3 $3,333,000 $3,333,000 Q Huntw ck Dr. Rem-616ft Inst-1,111ft W 115KV Transmission line ~ L2 1 mile east of Benson Rd. Wood "H" shuctures $Z00,400 $20Q400 � Z Adj spans and pole height for W 668ft crossin W L2 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 � 7.05 acres of S ra Field � L3 Off Wrenn Rd. Wastewater Pond (1) and $10,000,000 $10,000,000 � 7.05 acres of S ra Field U L3 Interchange of I-40 Gas transmission line g540,530 $540,530 JRem-977ft Inst-1,427ft L4 Interchange of I-40 Gas transmission line $1,505,681 $1,805,681 J Rem-3,692ft Inst-4,767ft � � LS No conflicts greater than $250K $0 Z 115KV Transmission line � G2L South of US 70 Business Wood "H" structures g�11,000 $111,000 Adj spans and pole height for O 370ft crossin Area along corridor from Old Baucom Rd. 2,300 feet north to Wastewater Spray Fields TL1 connection with Brown corridor (B- 33 acres $8,250,000 $8,250,000 3 Area along corridor from B3 connection with Brown (B-2) north Wastewater Spray Fields $Z 500,000 $2,500,000 to 1,100 feet north of Battle Bridge 10 acres Rd. G6 No conflicts greater than $250K $0 G7 Poole Rd. (SR-1007) SBA Cell Tower $1,000,000 $1,000,000 Total End to End Utility Cost $1,525,200 $400,000 $3,147,726 $47,139,000 $0 $0 $31,800,000 $84,311,926 17 of 17 R-2721, R-2828, R-2829 Triangle Expressway Southern Extension Revised 11/19/2014