Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC233566_Annual Fee NOD Letter (2024 Fee)_20250116 JOSH STEIN
Governor
D.REID WILSON
secretary 4D
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
D6ector Enwronmenml Qualhy
1/16/2025
North Carolina National Guard
Attn: Rodney Newton
1636 Gold Star Drive Suite 2600
Raleigh, NC 27607
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC233566-2024
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit
NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee
was billed on 12/1/2024 and was due on 1/1/2025.The annual fee applies to the following construction site:
NCNG Reidsville Renovation and Addition
292 NC-65,Wentworth, NC
Rockingham County
Certificate of Coverage No. NCC233566
NC Reference No. NCG01-2023-3566
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Kieu Tran at kieu.tran@deq.nc.gov.
Sincerely,
William E.Vinson,Jr., PE,CPESC,CPM
Director
Division of Energy, Mineral,and Land Resources
D E Q� Nrnth Curvlina Deprrtment o1 Cn,,,,nmentd quvlily i Drvisirer of Cnrryy knernl nnrl LnrW Rrsurrces
Sl2 Nunh Salisbury Slreel loll M1lail Sers,ce Center 0.ek i9h.North Cmuline Tio99 t612