Jerry,
Thanks for the PCN and attachments received via email 3/11/2016. In reviewing the information I developed a few
questions:
1) what is the purpose of the culvert extension? There doesn't appear to be any road widening or shoulder
improvements proposed, so please specify why lengthening the culvert is necessary as part of the project. Also,
adjacent development was mentioned in one of the attachments. If any non-DOT development is associated with this
project, please disclose and specify.
2) Dave Wanucha is correct: unless there is transportation associated with the project then the project won't fit a NWP
14. If purpose and need of the culvert extension can be justified, than perhaps a NWP18 would work for the culvert
extension. In this case I need to know the dimensions of the stream channel. It seems that 65 I.f. of channel will be fill
for the pipe extension, but I need to know the width of the stream from Ordinary High Water Mark to Ordinary High
Water Mark, and also the depth of the stream from Ordinary High Water Mark to the stream bed. This information
would allow me to calculate the volume of fill proposed below the Ordinary High Water Mark; a NWP 18 allows a
maximum of 25 cubic yards. The rip rap pad and bank stabilization can likely be permitted under NWP 13 for bank
stabilization.
Another possibility for authorizing the culvert extension is NWP 3, but you would have to show that the fill is a"Minor
deviation in the structure's configuration or filled area, including those due to changes in materials, construction
techniques, requirements of other regulatory agencies, or current construction codes or safety standards that are
necessary to make the repair, rehabilitation, or replacement."
Please submit the requested information (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we
may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file.
Please let me know if you have any questions.
Sincerely,
Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message-----
From: Parker, Jerry A [mailto:jparker@ncdot.gov]
Sent: Friday, March 11, 2016 9:51 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Bailey, David E SAW <David.E.Bailey2@usace.army.mil>;
Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>
Cc: Edwards, Charles N<cnedwards@ncdot.gov>; Harrington, Barry W<bwharrington@ncdot.gov>
Subject: [EXTERNAL] Greensboro Street Carrboro, Orange County
Hello All,
Last one I hope.
Jerry Parker