HomeMy WebLinkAbout20070332 Ver 2_More Info Received_20080123
ARCADIS
Infrastructure, environment, facilities
Division of Water Quality
401 Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
Subject:
DWGl Project # 07-0332
Neuse River Basin Riparian Buffer Approval, GS Plantation Point, LP; Raleigh, Wake
County, North Carolina
Dear Sir/Madam:
Please find attached five copies of the additional information that was requested
relative to the above referenced project. The attachments include the City of
Raleigh's approval of the stormwater management plan, site plans at a scale of 1" _
50', and level spreader details at a scale of 1" - 20'.
If you have any questions or require additional information, please contact me at
(919) 854-1282.
Sincerely,
ARC~DIS G&M of N9rth~a[olina, Inc.
~ }~
~~ ~ ~~
rnda Diebo "~,
Senior Scientist
copies:
Jon Callahan -John A. Edwards & Company
Todd Wigfield - Greystar Development Group, LP
ARCADIS G&M of North Carolina, Inc.
801 Corporate Center Drive
Suite 300
Raleigh
North Carolina 27607
Tel 919.854.1282
Fax 919.854.5448
www.arcadis-us.com
WATER RESOURCES
Date:
22 January 2008
Contact:
Linda Diebolt
Phone:
220
Email:
Idiebolt C~ arcadis-us.com
Our ref:
NC707012.0000
JAN 2 3 2008
DENk - NVA~'EFi QUAUTI'
VdETLANDS AND STtaRbM1AT'ER BRANCH
~~ of Mew
City of Raleigh Public Works
Stormwater Engineers
Date: January 11, 2008
To: North Cazolina Division of Water Quality/401 Section
512 N. Salisbury St.
Raleigh NC, 27604
(919)733-5083
1617 Mail Service Center
Raleigh, NC 27699
Re: Stormwater Management Plan approval by City of Raleigh
To Whom It May Concern:
JAN 2 3 2008
t3ENR - ~JA1~k QUAtJT1`
VNET11WaS AND STQF2MWATER BRAtd(~
The stormwater management plan (SMP) for Plantation Point Apartments 5-70-2007 (dated
Ol/03/08~ has been reviewed and approved by the City of Raleigh for compliance with our
stormwater requirements. This approval is for the purpose and design that you show in the above
referenced plans. If the SMP changes this approval is voided and the applicant will be required to
request a new approval letter.
No disturbance of the Neuse River Buffer will be permitted on the above referenced projects until
the City of Raleigh receives verification of approval and issuance of buffer permit(s) by
NCDWQ.
Should you have\an~y questions, please contact me at (919) 516-2155.
Gary Lee Morton, PE
Senior Stormwater Engineer
City of Raleigh
Public Works/Stormwater Management
POB 590
Raleigh, NC 27602-0590
email: gary.morton(c~ci.ralei hg nc.us
phone: (919)-516-2155
FAX: (919)-516-2681
219 Fayetteville St. PO Box 590, Raleigh, NC 27602
Voice (919) 516-2155 fax (919) 516-2681