Loading...
HomeMy WebLinkAbout20181192_NC 540 Triangle Expressway Southeast Extension from NC 55 to US 264_20160328REPLY TO ATTENTION OF Regulatory Division/1200A DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 Action ID No. SAW-2009-02240 March 18, 2016 Mr. Phil Harris, P.E. North Carolina Department of Transportation (NCDOT) Project Development and Environmental Analysis 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Mr. Harris: D ������ D ti�AR 2 8 2016 DENR•WAi:R RESOURCES I RANSPURTATION PERMITTING UNIT In February 2016, the North Carolina Turnpike Authority submitted a Draft Preferred Alternative Report (DPAR), for the proposed Complete 540, Triangle Expressway Southeast Extension (STIP ProjectNumbers R-2721, R-2828, and R-2829) in Wake and Johnston Counties, North Carolina (AID SAW-2009-02240). On February 17, 2016, the participating agencies met with your staff and consultants to discuss the PDAR. On March 3, 2016, we met with your staff, the Federal Highway Administration, your consultants, and the City of Raleigh, to discuss questions we had concerning your justification for selecting Detailed Study Alternative (DSA) 2 as the preferred alternative, as compared to DSA 4, which has the lowest number of relocations, and also has lower stream and wetland impacts with no effects to the watershed critical area, historic sites, and likely only de minimis impacts to 4f resources. The City of Raleigh submitted a letter dated March 17, 2016, which fiirther clarified the impacts to City of Raleigh facilities by DSA 4. After consideration of all the available information on the DSA's, we have determined that we have no significant objections or Issues of Concern, and have no objection to your proceeding forward with identifying the Preferred Alternative. Eric Alsmeyer is responsible for processing your application and is available to assist you at telephone (919) 554-4884, extension 23, if you have any questions or comments. Printed on � Recycled Paper Sincerely, 4 �� Monte Matthews Lead Regulatory �roject Manager Wilmington District Copies furnished: Mr. Clarence Coleman Preconstruction and Environment Director FHWA —NC Division 310 New Bern Avenue, Suite 410 Raleigh, NC 27601 Ms. Amy Chapman North Carolina Division of Water Resources 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Cynthia VanDerWiele, Ph.D. Wetlands Regulatory Section USEPA — Region 4 715 Shepherd Street Durham, NC 27701 Travis W. Wilson Eastern Region Highway Project Coordinator NC Wildlife Resources Commission 1718 Hwy 56 West Creedmoor, NC 27522 Fritz Rohde NOAA Fisheries Service Habitat Conservation Division — Atlantic Branch 101 Pivers Island Road Beaufort, NC 28516-9722 2 Ms. Renee Gledhill-Early North Carolina Department of Cultural Resources 46171VIai1 Service Center Raleigh, NC 27699 Mr. Gary Jordan U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726