HomeMy WebLinkAbout20160137 Ver 1_Application_201603237"ransportation
March 23, 2016
U. S. Army Corps of Engineers
Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
ATTN: Mr. Steve Kichefski
NCDOT Coordinator
PAT McCRORY
Gnverno�
N[CHOLAS J. TENNYSON
S�cretary
Subject: REVISED Application for Section 404 Nationwide Permit 13, 23 and 33 and
Section 401 Water Quality Certification for the proposed replacement of Bridge
No. 69 over Rocky Creek on NC 115 in Iredell County, Federal Aid Project No.
BRSTP-0115(7), Division 12, TIP No. B-4766, Debit $570 from WBS 38538.1.2.
Dear Sir:
On February 12, 2016, a permit application was submitted for the above-referenced project. Since
then, the amount of permanent impacts and bank stabilization has changed, though total permanent
impacts remain the same. This revised application reflects those changes and serves to replace the
one sent in February.
The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 69 over
Rocky Creek with a 150' long, two-span bridge with pre-stressed concrete girders on the existing
alignment. Traffic will be maintained during construction via an off-site detour.
As a result of the bridge replacement and new roadway slopes resulting in a pipe extension, there will
be 98 linear feet of permanent stream impacts, 130 linear feet of stream bank stabilization and 0.03
acre (92 linear feet) of temporary stream impacts.
Please see enclosed copies of the Pre-Construction Notification (PCN), DMS acceptance letter,
stormwater management plan, permit drawings and design plans for the above-referenced project.
The Categorical Exclusion (CE) was completed on May 5, 2015 and distributed shortly thereafter.
Additional copies are available upon request.
This project calls for a letting date of June 21, 2016 and a review date of May 3, 2016; however, the
let date may advance as additional fiulding becomes available.
!`�'Nothing Compares';.�._
S[ate of North Carolina � Departmen[ of Transportation � PDEA-Nahu�al Enviromnent Section
1020 Birch Ridge D�ive, 27610 � 1598 Mail Service Center � Rnleigh, NorthCarolina 27699-1598
919-707-6000 T 919-212-5785 F
A copy of this permit application and its distribution list will be posted on the NCDOT Website at:
http://connect.ncdot.gov/resources/Environmental. If you have any questions or need additional
information, please call Erin Cheely at (919) 707-6108.
Sincerely,
. � 1-�-- �
Philip S. arris III, P.E., C.P.M.
Natural Environment Section Head
cc:
NCDOT Permit Application Standard Distribution List
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 13, 23 & 33 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No
1d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes � No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No
2. Project Information
2a. Name of project: Replacement of Bridge 69 over Rocky Creek on NC 115
2b. County: Iredell
2c. Nearest municipality / town: New Hope
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state g_4766
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if not applicable
applicable):
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 707-6108
3g. Fax no.: (919) 212-5785
3h. Email address: ekcheely@ncdot.gov
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1 b. Site coordinates (in decimal degrees): Latitude: 36.01543 Longitude: - 80.95629
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 6 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Rocky Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Yadkin-Pee Dee
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The land use within the vicinity of the project consists of about 40% forest land, 20% developed or disturbed lands
(roadsides and residential areas), and 40% cultivated land (agricultural fields and pastures).
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
960
3d. Explain the purpose of the proposed project:
The purpose of this project is to replace a functionally obsolete bridge (deck geometry rating 2 of 9).
3e. Describe the overall project in detail, including the type of equipment to be used:
The project involves replacing a 134-foot five-span bridge with a 150-foot two-span bridge with pre-stressed concrete
girders on the existing alignment. All traffic will be detoured off-site during construction. Standard road building
equipment, such as trucks, dozers, and cranes will be used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
ro ect includin all rior hases in the ast? ❑ Yes � No ❑ Unknown
p 1 �� 9 P� p )� P
Comments: Only perennial streams within project study area.
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
See 4a above.
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. If yes, explain.
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands � Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem orar T
Site 1❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 2❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 3❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts 0 Permanent
0 Temporary
2h. Comments: No wetlands within project footprint.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question
for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact length
number - (PER) or (Corps - 404, 10 stream (linear feet)
Permanent (P) or intermittent DWQ — non-404, width
Temporary (T) (INT)? other) (feet)
Site 1� P❑ T Bank Rocky Creek � PER � Corps 50 120
Stabilization ❑ INT ❑ DWQ
Site 1❑ P� T Temporary fill Rocky Creek � PER � Corps 50 �2
/Causeway ❑ INT ❑ DWQ (0.03 ac)
30" RCP SA (UT to Rocky � PER � Corps
Site 2� P❑ T 3 98
extension Creek) ❑ INT ❑ DWQ
Bank SA (UT to Rocky � PER � Corps
Site 2� P � T Stabilization Creek) ❑ INT ❑ DWQ 3 10
Site 2❑ P� T Temporary SA (UT to Rocky � PER � Corps 3 20
Creek) ❑ INT ❑ DWQ (<0.01 ac)
Site 3❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
228 Perm
3h. Total stream and tributary impacts 92 Temp
(0.03 ac Temp)
3i. Comments:
• Of the 228 total feet of permanent stream impacts, 130 total feet are from bank stabilization (120' to Rocky Creek and
10' to SA). DWR does not require mitigation for impacts to streams totaling less than 150 feet per stream. Therefore,
stream mitigation required by the USACE = 98 linear feet, required by DWR = 0 linear feet.
• Temporary impacts totals are based on rounding, due to some of the individual impacts being <0.01 acre.
• The temporary causeway will not block greater than 50°/o of the stream channel.
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of
impact number — waterbody Type of impact Waterbody type Area of impact (acres)
Permanent (P) or (if applicable)
Temporar T
01 ❑P❑T
02 ❑P❑T
03 ❑POT
04 ❑P❑T
4f. Total open water impacts 0 Permanent
0 Temporary
4g. Comments: No open water within construction limits.
5. Pond or Lake Construction
If ond or lake construction roposed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland (acres)
Pond ID Proposed use or
number purpose of pond Flooded Filled Excavated Flooded Filled Exca Flooded
vated
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer
impacts below. If an impacts require miti ation, then you MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number — Reason for impact Buffer Zone 1 impact Zone 2 impact
Permanent (P) or Stream name mitigation (square feet) (square feet)
Tem ora T re uired?
B1 ❑P❑T ❑Yes
❑ No
B2 ❑P❑T ❑Yes
❑ No
B3 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments: This project is not located within a protected buffer area.
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The proposed replacement bridge will be on the same alignment as the existing bridge and will be slightly longer and
have only one interior bent as opposed to four. There will be no deck drains installed on the new bridge. Instead, runoff
from the proposed bridge will collect via shoulder berm gutter into a storm drain system and flow overland before reaching
the creek. A retaining wall in the northwest quadrant will be constructed to completely avoid impacts to the parallel UT to
Rock Creek (SB). Roadway improvements have been designed to minimize water quality impacts by promoting sheet
flow and infiltration along grassed shoulders.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Traffic will be maintained via an off-site detour during construction. Best Management Practices (BMPs) will be utilized
during construction to attempt to reduce the stormwater impacts to the receiving streams due to erosion and runoff.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
� Yes ❑ No
� Total stream impacts requiring USACE mitigation = 98'
(no mitigation required by USACE for bank stabilization impacts
<500' )
2a. Does the project require Compensatory Mitigation for * Total stream impacts requiring DEQ mitigation = 0'
impacts to Waters of the U.S. or Waters of the State? (Of the 228 total feet of permanent stream impacts, 130 total
feet are from bank stabilization (120' to Rocky Creek and 10' to
SA). DWR does not require mitigation for impacts to streams
totaling less than 150 feet per stream.)
If no, explain:
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ � Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
project? � Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. � Yes
4b. Stream mitigation requested: 98 linear feet
4c. If using stream mitigation, stream temperature: � warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): 0 square feet
4e. Riparian wetland mitigation requested: 0 acre
4f. Non-riparian wetland mitigation requested: 0 acres
4g. Coastal (tidal) wetland mitigation requested: 0 acres
4h. Comments: The NCDOT does not propose mitigation for the 130 linear feet of bank stabilization or the 92 linear feet (0.03
acre) of temporary stream impacts. These impacts do not require permanent fill in the stream bed and, therefore, under
Section 404 of the Clean Water Act, do not constitute Loss of Waters of the U.S. and are not subject to compensatory
mitigation.
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes � No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If not, explain why.
❑ Yes ❑ No
Comments: If required from 1 a, see attached buffer permit drawings.
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? � Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings.
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
� DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? not applicable
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
4a. Which of the following state-implemented stormwater management programs apply ❑ HQW
(check all that apply): ❑ ORW
❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No N/A
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No N/A
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No N/A
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State � Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) � Yes ❑ No
Comments: Categorical Exclusion (CE) approved 5/5/15
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 26 .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes
additional development, which could impact nearby downstream water quality? � No
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby
land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
10
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes � No
impacts?
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
As of July 24, 2015 there are three federally listed species for Iredell County. Neither the bog turtle nor the dwarf-
flowered heartleaf has habitat present within the construction limits of this project (surveys were conducted for dwarf-
flowered heartleaf in all areas of habitat that exist near the construction footprint in March 2015, and no individuals were
found). The remaining species is the Northern long-eared bat (NLEB).
A memo was submitted to USFWS on February 26, 2016 indicating that NCDOT is in compliance with the 4(d) rule for the
NLEB, therefore satisfying Section 7 of the Endangered Species Act (ESA). The biological conclusion for this species is
"May Affect, Not Likely to Adversely AffecY'.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NMFS County Index
7. Historic or Prehistoric Cu�tural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NEPA Documentation
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA
8c. What source(s) did you use to make the floodplain determination? FEMA Maps
Philip S. Harris III, P.E. 1.�^ 3/�-3 2-°��
Applicant/Agent's Printed Name A plicanUAgent's Signature te
(AgenYs signature is valid only if an authorization letter from the applicant
is rovided.)
11
Environmental
Quality
PAT MCCRORY
�.St3N�@'i'A2fJS'
DONALD R. VAN DER VAART
s�crPr�.�,
March 18, 2016
Mr. Richard W. Hancock, P.E.
Project Development and Environmental Analysis Unit
North Carolina Department of Transportation
1548 Mail Service Center
Raleigh, North Carolina 27699-1548
Dear Mr. Hancock:
Subject: Mitigation Acceptance Letter:
B-4766, Replace Bridge 69 on NC 115 over Rocky Creek, Iredell County
The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the
compensatory stream mitigation for the subject project. Based on the information supplied by you on March 8,
2016, the impacts are located in CU 03040102 of the Yadkin River basin in the Central Piedmont (CP) Eco-Region,
and are as follows:
Yadkin Stream Wetlands Buffer (Sq. Ft.)
03040102 Non- Coastal
Cp Cold Cool Warm Riparian �p�an Marsh Zone 1 Zone 2
Impacts p 0 98.0 0 0 0 0 0
(feet/acres)
*Some of the stream impacts may be proposed to be mitigated at a L• 1 mitigation ratio. See permit application for
details.
This mitigation acceptance letter replaces the mitigation acceptance letter issued on November 12,
2015. This impact and associated mitigation need were under projected by the NCDOT in the 2016 impact data.
DMS will commit to implement sufficient compensatory stream mitigation credits to offset the impacts associated
with this project as detetrnined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the
In-Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this
mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from
DMS.
If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420.
Sincerely,
James B. fill
Credit Management Supervisor
cc: Mr. Steve Kichefski, USACE - Asheville Regulatory Field Office
Ms. Amy Chapman, NCDWR
File: B-4766 Revised
�.'"��iathtr�g C��p�ar°es:=-�._
State of Nor?h Carolina ; Envir�nmenYal QueJity
1601 MailSeiviceCenter ; Raleigh, Narth Carolina i7699-iGUI
919-707-8600
E������ti �ati, North Carolina Department of Transportation
St[)a 1ll�vdt+f'!' Highway Stormwater Program ��
STORMWATER MANAGEMENT PLAN
(Version 2.02; Released April 2015) FOR NCDOT PROJECTS
WBS Element: 38538.1.2 TIP No.: B-4766 County ies): Iredell Page 1 of 2
General Project Information
WBS Element: 38538.1.2 TIP Number: B-4766 Project T pe: Brid e Replacement Date: 9/14/2015
NCDOT Contact: Linda Johns Contractor / Designer: Ernest Hahn
Address: North Carolina Department of Transportation Address: North Carolina Department of Transportation
1590 Mail Service Center 1590 Mail Service Center
Ralei h, NC 27699-1590 Ralei h, NC 27699-1590
Phone: 919-707-6728 Phone: 919-707-6724
Email: Imjohns ncdot. ov Email: e'hahn ncdot. ov
Cit /Town: Lake Norman RPO Count ies : Iredell
River Basin(s): Yadkin-Pee Dee CAMA County? No
Wetlands within Project Limits? No
Pro'ect Description
Project Len th lin. miles or feet : 0.145 miles Surrounding Land Use: predominantly forested
Proposed Pro'ect Existin Site
Pro'ect Built-U on Area ac. 0.6 ac. 0.4 ac.
Typical Cross Section Description: two twelve-foot lanes with eight-foot vegetated shoulders two ten-foot lanes with two-foot vegetated shoulders
Annual Avg Daily Traffic (veh/hrlday): Design/Future: 3600 Year: 2040 Existing: 2100 Year: 2012
General Project Narrative: This project proposes to replace bridge 69 over Rocky Creek and to construct associated roadway grade improvements along NC 115, Wilkesboro Highway, in Iredell County.
(Description of Minimization of Water The existing structure is a 134'-0" five-span bridge (1 @24'-T', 1@25'-0", 1@35'-0", 1@25'-0", 1@24'-7") constructed in 1934, and the proposed replacement structure is a 150'-0"
Quality Impacts) double-span bridge (1@70'-0", 1@80'-0") at the existing location.
The existing bridge had deck drains over Rocky Creek; spread calculations indicate deck drains will not be required for the proposed bridge. Instead, runoff from the proposed
bridge will collect via shoulder berm gutter into a storm drain system and flow overland before reaching the waterbody. In addition, the proposed design reduces surface water
impacts by reducing the number of interior bents from four to one. Roadway improvements are designed to minimize water quality impacts by promoting sheet flow and
infiltration along grassed shoulders.
Surface water impacts primarily occur at the rip-rap bank stabilization along both banks and the temporary rock causeway. The cumulative total area of impacts equals
approximately 0.04 acres of permanent and 0.03 acres of temporary surface water impacts. Existing channel impacts equals approximately 228 linear feet of permanent and 92
feet of temporary impacts.
Waterbod Information
Surface Water Body (1): Rocky Creek NCDWR Stream Index No.: 12-108-11
NCDWR Surface Water Classification for Water Body Primar Classification: Class C
Supplemental Classification: None
Other Stream Classification: None
Impairments: None
A uatic T&E S ecies? No Comments:
NRTR Stream ID: Rocky Creek Buffer Rules in Effect: N/A
Pro'ect Includes Brid e S annin Water Bod ? Yes Deck Drains Dischar e Over Buffer? N/A Dissi ator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Bod ? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
����j-�`,, �a�, North Carolina Department of Transportation
:5tc�t ri1�r dfPF Highway Stormwater Program �-�.
STORMWATER MANAGEMENT PLAN _
(Version 2.02; Released April 2015) FOR NCDOT PROJECTS
WBS Element: 38538.1.2 TIP No.: B-4766 Count ies : Iredell Pa e 2 of 2
Additional Waterbod Information
Surface Water Bod 2: Unnamed Tributar of Rock Creek NCDWR Stream Index No.: 12-108-11
NCDWR Surface Water Classification for Water Body Prima Classification: Class C
Supplemental Classification; None
Other Stream Classification: None
Impairments: None
A uatic T&E S ecies? No Comments:
NRTR Stream ID: SA Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Dischar e Over Water Bod ? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
�
�
See Sheet 9-A For Index of Sheets
See Sheet 9 E3 For_Conventlon Symbols
�--�� OFF-SITE DETO UR
BEGIIV TIP PROJECT B-4766
—L— STA.13 +32.00
����� �� ������� ��������� PERMIT DRAWING
�������� �� �������� SHEET 1 OF 8
IREDELL CO U1�TY
LOCATION: BRIDGE No. 69 OVER ROCKY CREEK 0111
1VC 115
TYPE OF WORK DRAINAGE, GRADING, PAVING, £�' STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
SITE 1
_ _�
� � NC /IS
��TO STATESVILL� — — — — —
i
GRAPHIC SCALES DESIGN DATA
50 25 0 50 l00 ADT 2012 = 2,100
ADT 2040 = 3,600
PLANS DHV = 10 %
D = 55 %
50 25 0 50 100 T= 13 %*
V = 60 MPH
PROFILE (HORIZONTAL) * TTST =5% DUAL 8%
l0 5 0 l0 20 FUNC CLASS =
MAJOR COLLECTOR
PROFILE (VERTICAL) REGIONAL TIER ,
�
BEGIIV BRIDGE
—L— STA. 15 + 53.00
SITE 2 �
�
�,
�
m �
�, �
— i \
y � -� -_=_� �
� —
E � NC 1/S �
ii
;
E1VD BRIDGE
—L— STA. 17 + 03.00
�� B-4766
38538.1.2 BRSTP-0115(�
�
PE
�
� ,�
o $�q5
NP
E1VD TIP PROJECT B-4766
—L— STA. 2l + 00.00
WILKESBOR� �
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD
NOT A CONTROL OF ACCESS PROJECT.
DESIGN EXCEPTION REQUIRED FOR VERTICAL CURVE.
PROJECT LENGTH
Prepo�ed !n the Office of: H1'DRAULICS ENGIMEER
DIVISI011t OF HIGHWAYS
LENGTH ROADWAY T.I.P. PROJECT B-4766 = 0.117 MI �000 a;.�h Ridge Dr., nate�gh xe, z�elo
2012 ST9NDARD SPEC/FICATPoNS
LENGTH STRUCTURE T.I.P. PROJECT B-4766 = 0.028 MI
TOTAL LENGTH OF T.I.P. PROJECT B-4766 = 0.145 MI
RIGHT OF WAY DATE: JASON MOORE, PE
SEPTEMBER 30, 2015 PRo�Ecr FxcrNFFn
LETTING DATE: NYA K. BOAYUE, PE
J U N E 21 ,�L O� 6 �'ROJECT DESIGN ENG/NEER
P.E.
SlGNATURE:
ROADWAY DESIGN
ENGIIVEER
SlGNATURE:
P.E.
BEGIN BRIDGE
-L- STA 15+53.0(
BEGIN APP. SLAB
-L- STA 15+28.83 �
\ �,
GRAU 350 TL�\ NPE �77
� O �
�Trl � 1 IZ- - ....
GRAU 350 TL-3 TYPE B-��
END BRIOGE
-L- STA I7+03.00
END APP.SLAB
-L- STA /7+27./7
TYPE �77 /
NPE B-77 R
�
PROP. SHLG
eERM currER
SKETCH SHOWING BRIDGE/ROADWAY RELATIONSHIP
8 /
O
�.
S I T E 1 IINDA R. PATTERSON
/
/
/ RETAIN EXISTING ABUTMENT TO PPROXIMATE ELEVATION 1,000.0
ABUTMENT E%CAVATION TO APPRO%IMATE ELEVATION 1003.0
/ / / �
� � � ' �
W 5��� / /
/ i
�� � �
�.
,�
,
_ .�;;n;;n;:n;;�:�
�
ftETAIN EXISTIN ABU MENT TO APPROXIMATE ELEVATION 1,003.0
� �
� is,p k 1 1
4� can�,� ro� �a� � a
��} IS F D l� ,/ / I �
3 �� � oNc �I 5e � �
II� � � �' _ ��� €�
z.
X �_� � � � �� , ��� W, � r�
\
PDE
DWiG �N�C,���NGER
HILDA YOU GER
ITE 2
�ABUTMENT E%CAVATION TO APPR IMATE�C€�?�IC
BEGIN SHOUIDER BEkltp� G \
�AT BRIDGE STA 17+Oj'1 A � RT \
/
/ �S� END SHOULDER BERM
. � STA 18+20 LT f�,..:
�-15�`�"""" ^,'�`�•
�� �� E�
r��.,., E i--` �,-. ,-..;,�'� -c-L.
� �q5
/ NH�
�
/
�
� VICT AR EA�R�LE CAIL
VICKI LY NN FCALL
\
1 000.0
�
l5' 32' 0/l E
_� ����P.e�..��!�%������--�� � ��
� i � .%i� / � � � �� �
`j ��I��+� �.vi.i��: � ��� � - ���
-1�:�ri:�:����� _� �:r��i�= � � �l�� � �s'i�'�� i
-� � i�'✓ � � ''._ �►,►� 7 ��� �,� _ �
� � � �
„ ��1J
` • •.
RM' SHEET NO.
DWAY DESIGN HYDRAULIC
ENGINEER ENGINEER
PERMIT DRAWING
SHEET 2 OF 8
T 5
�
- - N ►f3��.5'E
ro moarn_��resooRo
�
— `��`.� � TOE PROTE TIO�f � o� F$ �;
I � P.SS II RIP RAP CL4S5 B RIP RAP � SEE DE �Qj a SE DETAIL '
P�I PU�' PUE PUE � PUEI PUE PUE �eJ �P + �-\
I 7 —� TOE PROTECTION / � � 5EE DETAIL DZAT�ON
� , SEE DETAIL A �
BM#2 ; I .� CLA55 II RIP RAP ��
-BL- STA.9+89 152'RT w � �
CLEV. = 1008.63' �
p�, w p� BANK STABILIZATION
�FERNE W.'C6UDNLlR � � � CLA55 II RIP RAP 200 TONS
BANK STABILI TION I UNCLASSIFlED EXCAVATION 125 CY
CLA$$ II kIP AP 350 TON$ I�
UNCLASSIFIE ' XCAVAiION 250 CY � � I�'.
S� PERMANENT SURFACE WATER IMPACTS
� TEMPORARY SURFACE WATER IMPACTS
I��� �� I��)� �����
��n'�\��II�� .�l��a�.�
.� � V / � b N gw u�yp�'
1 MiCNOAWAL �JACOBSSUTAAI E�SiEE
I
DETAIL A DETAIL B DETAIL C DETAIL D
TOE PROTECTION �� BANK STABILIZATION BANK STABILIZATION
(Ho��o Sm1e� FALSE $UMP � �Ho�w S�io) Irvo�io s�ole�
( N0110 SCOIe) EL=1024.0' TOP OF BANK
O iside Dirch ror oF enNrc Haru�i N r Nnluxn�
�P°��e Troffic Flow Nnruwa- ATORAL � I oaourvo
urol �,����5�°Qe �') � 2� GROUN� GROUN� GROl1ND .. I � —
G�o�nd , y y, F` �
I \
� I d �� GEOTE%TILE-
d=2ft. � RCP GEOTEXTILE- ,` � ry GEOTEXTILE
- GEOTE%TILE
6=2ft. —Geofaxt�le t$— 18" ITYP.I -/ IB" (iYP.� �
g Min D=1Ft.
T ofLiner=ClasslRi Ra S=Difch Slope —CE Proposed Ditch
8=0-2 F�.
YPe P P Type of Liner= Closs I Rip-Rop
-L- STA.20-40 TO STA.20+78 RT -L- STA.19+98 LT
-L- $TA. 17+00 TO $TA.17+40 RT 12 TONS CL I RIP RAP, 30 $Y GEOTEXTILE, DDE-IOCY -L- $TA. 20-80 RT, 5-6 4%, L-25'
-L- STA. 19+00 TO STA. 19+25 RT 28 TONS CL I RIP RAP, 55 SY GEOTEXTILE, DDE=20CY
� o>����� SEE SHEET 5 FOR —L— PROFILE
sr=�,�
P v���
O
z
� � `_ ~ � ..: . � �:.. :. .. \ � `. � t �.I �.'.' � �'�' . �\ '\ � .. \.�. \ � � l�� �.� \. .- . . � � '� ,� � . . I ' PROJECT REFERENCE NO. SHEET NO.
� . / -1 eEciN eRicc� ENo eRiocE � � \� � � � '� '� � r � � � _ / / � _ B-4�766eer No.
\' /
4
� STA �5f53.�� -�- STA n+�3.�� �� / � � �, ��, � �� � -� o�- - �;� ;� � � ��� --
� �� � � ''m� � sEe�N nP�s�aa ENo aPP. s�ae � � l� ` � � ) i � I �i, � ��� �\ �, _ �/ � , � ,
' / \ "\ \� , � 11`\\\\ � / - � � ROADWAY DESIGN HYDRAULICS
� � �� i/ � � -L- STA 15+28.83 -L- STA /7+27./7 �99, � . �����������������V��������������� � � — � / ���� / ti � �
� _ -_� ��a i / ,: / \ / � I l l ) 1 t�' I��` a e \,\1\\\\\\\\\�\ �\ = — � //��/ �� .,:x ENGINEER ENGINEER
s� � f � ���� �\\\�� ��\������������������������ � �� _ � i .� , �J �� � \ �
�
�� � � � � °� � � I i 1` i _ � � esai /�
-_ / / � GRAU 350 TL�\ TYPE �77 TYPE 8-77 � I ` �
" � i f _ � ; , , _ i _` /, \� - 1�� \\\\\\�\���\�\\\\�\�\\\\\\\\\�\\\\�� � = - � ,� � ;
' _ I � I I > > � � _ . �� / � `
.
_ �
�' _ �
„%� / � = i `� o � � � ' ��� a'>o� � � � \ �I � � II i I „�' \\\\\\��\��\\�\\\�\\\\ \\\\\\\�\ `` � � � ��� 1 � � - _.,- � �`� ,�
�.,� � ,a.=� _ � . � o / N lT 24• is.s� E o � � ��� �/ / � \\11 �' �' \��\\\`\ \ � 1 \\\�\\\�\\\\�� � � � - �'�
o� A,�11111 � �� �� ' i � �)�
� `
; � �
� � �� � �%_ � � nPE a-» ��- �, - � � � � �I � �� � � I \\\\��\\���\ _ - �� - - ! _ �r ' z,��,�/��
� �" r �-
i� � �
i � � % , i -�
� / / �//// �� —� GRAU 350 TL-3 TYPE �77 �� / � � �/ \\ I 1 1'\\\I\`\\\\\\I1I �\ \\ \ — -� ='f--- = / / �� �~�� I��
/�/ �/ i / � I / � � I I I I � � 1 \ � ' IIl � jeefi•o%/ -� — _ �
/ �� �� � � j (-'ROP. SHLC // � _ / \ ��I � I `jj���-� 1�111111�\\\\\\"`I�l \\\\�\�� i'�i_a�� � � — ,� _��F"; J�^ I����:
� -,/ �/ � % / % BERM GU7iER � I I 1 �I � 1' 1\ \ �,A �,aa e e � � � _ _ ' _/ / /
° %% �� % � � J ' I I� — �\ `; iii� i; 1' ' )`?il!��N`� �.�,� J :���m,,\� � � , _ — ;%% � �,aL ���i i PERMIT DRAWING
i��ii�i l i�i� i \ � � i � _ �
ii� ��� � i % � � ��A, , � �� � I �, ; ,,I `�\ \\\��\\ � � - =_ -- _ %�% � � i- ,��!% SHEET 3 OF 8
� =% iii , j � !;%� ETCH QWINQi BRIDGE/RJADWAY R t�TIONSHIP ��== \` � _- �_ �_\ I �/ ,, , ,�ti�''i,\\\\\�\ \ \ ` f _ : i, �� �i � ; % �,,. ,
'� %� %i , - -�� / � ,�,��, , \ I\, \\\\\\ \\\\ � - - �-`"- \,' ! �i^-- �� %,��I' , ,,;, �,�� _ �
� 1 .- ��°m.- /
� . / � � / ��. % � � . . � -` - -_.:.- � � �_ \ �, � l��l `� � � � � DIUGtii C ." NGER '' `�� . � #� 1 ,a�- ��// - �/ �`� ��Il � � � � v � _ ,
i �- � i `
-
� � ��� � /�os�� � � �/ � - /m�b / % lli i �ii
/ / j � / -�/ � � � � ^ \ \ 1 \������� ���. � AN �ki � ,_ ..- .p i � /// i/ .._- i irr .�ii N� ; �--.. �
g %�/��/�� i� I �i� �
� � I ---�1 �� � � il�� �� �, � � �' � HKDa � rO��GER ,-_ :/ � �N 0%� - i % �� ���r � i
�� ��/ / � � ; ' ,. _ -- /! � � r �\��l , �., �„ I �� ,\\`� , � ��/ %� j/ �_ �����%�/��� ����///%9��%i� '� � ����
Q J%j/ �j � � . � `.,' �� ,� �� .% .�- �� -,.,,,, --. - . .--� g� / J� II />���I � � '; II'iil i � � � � �i re;;/ / // . -�_.� �%����/�����i"1�/�/m� � � `1- ^ \\ .
- //i / � / � � � /( il���� ic � � , � / i � � / � r/�////��- _� \
/ �� — ) - � \ � ' 9��� ' � � �
J _. �.,,� r :, , , I I � � ����� � ,e, % /; ////// ��/ � % _ =�o, � �
_ �.i/�� ,�= % .- _ - ^ I ;;,� '" � ;; / � . _- --' �" � ----�-��NQA `PtaPATTERSON _. � .._ � I � ' � �' � .; � � - \ =\ . ,��/ �-� //i��� � � m� , � ' �,;////� `�`� ��r°'/��////���'J � =�i � � � � '
' � � � - - - - � .. � ` `- l , '�'�I �-'- y - ' � �
� , �- ,; � � #T 1. , _ l �!� ���� ; , ; , ��_ �ti, , - � �- �-^�-- �- � -_ � ,�3; ����,,,%�,,��%�mL��% ; - - - �
-- , �
!/''�i � /��i p � �� � _ - � _� �11 � � i � �� \ � i 1 /�,a���i ! � �. , � /, /�% //�/// � �v �/ �- � - - � \ \ \
� �, �.:_
, - -
' �/ / �m�� _ A i"w� "%` , ' -- ' --__\\ '�� Le�'i �j/ ; �/�, � _„�. /�� �% /����///%�%//%�iid'�/_ �-- \
/ � � � , — ,.e .; _ � � _ — — _ �114 _ pl! ; ;� � � � ��%� � ! � — ,q'%,/ r �����/ � - � � �
� � z.,_ _� _ �::, ��� �% %,� ��.. _-� _ _ _ - - � � P - - , � � , � ��� , ��� ,- /iii��� l'� m;� �� _ � .
�'/ / i � � � � ", � a,= ` — — — — — � �_ Jl� ;/, /: 1 � �; � //,� a/ / � /`e•m �
/ i i � � — ��_ — -- ���1��_ �_ �/ � � ,/, �Lm' � � ,a�r�,/%i�ii/ /�` � — �
/;, �� J- '" �;i; ii����'- l � a,- =�� _ _ - - , - _ ,.-� _ a ��)� i,i�!�Ir c _i�/��;,;�; � \ � ` � ,' �� �j�� - -- � � �/i;� ' ,� � , / �, ��/ % � �` �i � , � � � �.
J
a,w
/ -r, �
� '
,w �
�
-�,a,_
/��-� � i / � �/ //�/ /� �/� � - �/� _ -` \\ � _, / j/� �%� ��'' � � � �I i`�\� �r�� l \ � � //� �/l �� _, � �J' �6/j� � � /%// �� � /� / �"�
_ � //;/, �// / �/ /// i — � �- � � / � •�"�/ , � � i i �� a��\� "aP� � v� � %j - � ti / � ��& %� / % vicTOR nR� " cnu � � / / � / �y "�
— ' �i, ii//i� / i i� - =.5� — � \ � � — .,, � // l � � �, ��C.. / �������1 ' � e� �% %%%i � � ' . - �,%/ ! a�� w�k � i/ ��l / � � i i i'�� �
r
, � P _
� ;
, s,:- � ) a
i \ � ' / ' // /, // / � � __ � �\ � 1 �i C� � `� \ \"\1� � � � / .i�i � �, viCKi! tNk �sL� �� / �r , -�L -�- -
�� � r . / ���/ /// /� ��/ /� /�/ . � YCA BUTMENT PPI{OXIMHT�E ��EVATI�M' �10000` I�.a-� ..,� \ \\\\\1\II \��\ � �� % �/., � � - � _ /� / /��/�/ ' ,'� / //I�/ // � ���' '\— `"1
i �� RETA�UJ EXIS f G�P, I
,"1 - � ��// �J /d///� / // � j / \ ' \ ., . � � S�� //�__�� _ \ \` �� � jj (i, ;-� L � �� � . / / �
\ ���� `� � / // � ;� �,,,, � � � ,. , : .; '', - � � lI\`� �` - %; ; 5 / % ��� � e!�� � , l� �i� / / ,�� � � -
...... ` � ' ��/ /j / �� "�. / " ABUTMENT EXCAVAT{O TO APPRO%IMATE ELEVATION 1,003 0� ' - � -- �, � � � • \` �`� _ -� � ' � � .. . , . / / / � � ' .
'' - � A
-'- / ��f %��' / m'�� / /� � , % . . --' i _ - I - l I .. � adrtnEr�r�x�n�t3`�D�nFex i�nnrE ' o � ,00a o ��,: j�� � i � � �% � \ . .
,� ,,,� , � ,.�a , i ��; ;4°� � - �. �',� , , � � � �; ► ��=� � w , , _ � e� ��` - %,,. _ = � J .,� ! r � i � � �
� �, , .P , i �o - � ; ; , ' . ;{ � , � L. � , !-= � _ �/ %; / , � �
;
1
I �-- �'���/ _.�'" -=P'�"� � /" / � � - R AIN EXISTIN ABU.MENTTO�...:A �XIMATEELEVATION�1..003. \ ..� � t.� I ��.,;��.',� �.` - �..�_, - ^,�� ��ULDERB��G %� /,��.�� � �y ( ,'f m� �� 1 '
��,,i,. _- � �" .. �' ^ .�� �/.. . � � ._._ . �Q_ ___ _. . __.� -__.- .. ��,I „�� . ATBIYiDGE STA_U' �i A.. ���RT - � �15�.�G OIIL I �� i I I � � � .
._ ��,;;�-.. ���/ �� /�,„ . �-/ - ' `., \ / ;.I� li � _ __ _, / �� // - �; I � / / .
� `si�� � / ,._� .r-- � � � � _
, /
� ./�% �-,� .� i-' .,s j�� " . � . '. i \ 'v, / l ` I _.•\ -__ � NK' /IL�Eildfil/ � I \ ^ `�
_ ,�. ,, , - -, �; �� ISFD � ��' �_ , � _ � /� � � I i� �, ��
���� '
_ � �. �
�' ,� � - �� : - � � � �
\ /' f � � � cano� '�o� �a� �oa �I � r � — �s t'`� - � �� � � �
� _
0
� � -; � , �; - - �= / �� �` - , - ��
� < � -
/.--` � , ����-%0-i ;:,p is F D :/� �„�r � ' .ti; ,� C'�"J .-y _ -_'- , -..� ��ST�18+20LDER BER�M. P�E � — —1��
�
` _
, -
�i ,� �=��i si� a- � � , - �., _-` , i..�/ � n . �� / � I `' �� � � � ., � , --�- PD'E - . ,- , � .�.. �-'-'. �. �µ.,, , - � �j � -� - _s=f - -
�
,
'� y� ---- � . _ � ) .. � -t. �_�„ f �: � -o .�c. . , ., �- � , _ ���- - - �
%� i //, � ,_ � i i �-: - � .oNc o �(�.� / �� � �, _ ` I �, � . �„r:� � � � �.� . , ,N %` . _ �E'�" ��_,.^,. � �� � E�.� ��,S,ti:�.". �-„�� ` F � , (V��.� � �. � _ '__ .r =— � --
//�� � / ��.;� ��-- - - � �.� � '4 �_`_'-� y �� �� � €i� - �.� � � _. �..,.,,�-�
_ _ � „ � : : . ,. . �� � . _ Y�a�°"� _,�. - Y ..
/ „ - - m L�j E _��^
�
� r ? .! � � --��—�� _
I �� iz
� ' _ ' 36" CHL -I� v � �>: � ' tlS'/ \ . L... W.
:e � Ex�T�� a�w _X—��= _
-, _ x- �_� -
/, i ���-� __ ---- _ _
_ , /�� �� --
1
�� -- r� srnr�sv�uE Nc ns � esr - - - __ � -- - " � � `
_, /� � _ -- ���y - - -..- ; -� � �:_ � , �.,o'�o��, . � .>, - i . .. , ,. � �w� -.-�,� �,% .
�.... _n �� �._ � � /
- - �
--. - --- ...� ..— -r-� . -- - -- -- - - .n-Y _ � �
esr �� � �
� -- - _ _ _ �- - " f-' _ � �" t � ��. � ,..�.. _ � � � � , � ,v �X���-:- ��G
___-__._., nE�u:. _. _ _ -\ ._y v .�� - 4� s.`'s` ��?_�._ E - .� � �� \ � '"'r ,
' A �
� — l � c -�- , w
� _-� _ _ r�"o-� . _ , � � , � f } Y, ya, ` �-� � eemo e W a , wi2� � ` \ ,o„� �
_ .
" ,,,�"_ " o ..,„-- --- . . � n' � \ 'I " � S R nnove � f � ;', � ��� ,;, , ' , � �iac�� QJE' dh°� � - ' a � X � �'- ��. �' - � � \ ` �� � .\�� \\� � 1
- -• �
"' �\, . �_- � . , �
' _� -�- . _ � ��.,,� , �" , � e , .�. �� � � � . ' ` \ e � , . A�
� _ _ -,,, _ .. . . .
.
� __ ��� � _ . � . ` . ,I E.. �, ,`' „ END SHOULDER flERM ,�; / /. `.': `` � . ' - �
-- . ��j� � . ,�- I � . E ���� - �� , , •o _
_ . , �.. V . ir � . �urreR srn�nrsD.et �. o _ . �D ,_ . �_, , ,A
^ � ' � Y
E
�_ �:, - - - �, �� �. �� - . . . '
_� � \ _. � , �� ��� . . � ..f �, f $j . . / �'/ ',. � � ",I, r I ; i �.,`- d 1 .I , .. � o � pp � \�\ ..\.�� s, \ �\ ��� � � � � \ � � �..
_ � ��., 1'9� � oe�Pryor� iow�, a Fs- V s �
_ „ -�`{l ..,. �-:.. P '. ` _ i r.l � . aSs u: iP aa.a .. ; , , I . . � - � k �i s�E'RE . � � . � � _ � �\� ��� � \ \� - � � �
�� _ .. .. . �. :� ' I i CL455 Rip RAP� " � i ;� 1 , / �" 5� _DETAIL .. � � -t��. �,F � � ,. \
�, � ��`�'� 4� ��.,, , � �__ ...... �' . � II . ..PU PUE � /' . PUE ���PUE I '� P. � �' �. P ',�III �P� /�✓-1-" _ � /�` \� �' i e,�3�a� ��i�''i'"� \� \ � \.....
�, i �� � . - - 11 - - ' ` � - �
,�/��� � �,,',__ - -'� � � i � 1 ,f � � 1E, �J /;i' ;,�� �P nNKsr anr�c_- <� �1J�%����� � ' �
. __-. , ,.. ' - __ . \-� . . . . li�� - . � � -- "� 'j� � , 1, OE� 072CTI_Q�._-._�__�., - '" .� i/ i ����/ i" '� � - /� \ � \�"\
-
�� \ ` _ _ . ' _ l i . � �.' " SEE DETAIL .p ' - - � � ' /_�-'� -� � � ._ 1 \
--_..... � „ �--. __' �.. '�, � l�i -� � � � ��' � �. �� -.� \�. i I i � . r I 7 , . � .: . i .. _ . / ' :'i/i ". /� ��J �SEE�ETAG.-.4-�,,:' .__�. > ': ; . � ' - .. __ _ -.�d� 1 � � ���l�f���� �= �� ��� . .. \�..., \ \ \� .
C
� �_ J \ � _� __ � � , ,,, � , � ' 1,�, � ' Jl,�� i �,,� - � -� L � � \�
� �_ �' �\ - \ � ( i'`� ' lgM�2 ; x ci as�ri yP�po.�r - 4 1 ��//�i� /i. - �_ � -• � _ _ �\ \\��
_, � �� ,�,� \�\` \, - .. �� , . ..� � ,.\�..�. .����. �� ,; " ..' �BL- TA._9+89 152�R. � � �� �.:/ / [ -�. =; i' / %�� /� � ; �(� / \� % � � % I ` � �� �� �
.. . W� -. _ I I %/ . . .
— \ �� �- � 1 � � \ )I��� I I I � , EV. 1008.63 . . ' � (' � . �l l/ �1/l� ,/ /��i � - t a �.�; / � \ � . � \�
\ � � �� ._ m I ' �, ��, � � �j.m �� 1 / , � � ���� �� /- � �
__ - \ _ \� . A" Y Y .. �.. \ \ \ \����a \ L /' � -- . � ,�� �. i: /� . �: BANk-'S��III�� OO�TO�JS �y � /`���// . //� /I I �II m '` /��� �'�' i - � ���\ �� . J� \���\ �` \�� .. \ � �.� � w ..
� � �� � '
�
- - � -� �� - � �F N� N.0 UDLL� �. A ��� � � I � i � � , � �� c� � su �l 2 : �/ i � ��I �I I �I�� � �� / _„.�/� � �/ .- � � ; � - � � � �. �
- - � � � � � � � � ��� ��a � � /%1��� ��I" , � I � � � � "� l � � � / / jl�l/ li' l/ / � /i � �\A� � ) �, �
- - -- � \ . _ � e ; �B' K kTABILI TION ��i �I , I I ' / / � � � � ; �� �\a �/ " � �- �
� \ �� m � � I
.
- � � \ \ - � e . =� I � „o m � i i : .>�AI i ,' �u c�n� Fi�o �cCnvnno�:ns cr � AI i l� / � / � / .i/. � .m , ��\� ✓ \�
a 1 /; (
m �q
� � �„�
_ ��� �� \ � .. \ . .. � .. '���I1�'� \ ///�%/�//�I I J.GI.ASIIRIp AP�SO�fVNS J 1 ��, I/ :� ,�� \ . . . . � /��I//�II /l//// j //� �� ��/ / — _�ft�`,��` �� ` / �� \\ in., \\ . .
� `� � � � -\ � . __ � ~ � �.� \ I � 1 I I // l /l/ I I i �' Y1�LALSIR,1 � XC7VATA61�'�7i��Y I'� .. J� � ._-- .. ; I /. �/ ' �/ / —_ —� ♦� \ � / , '
_ _ �_ � i . ; � � ',
, A � ��o_ �� �� I / l� �� � % � /� ��/�m/ � /sa �_ y ��� �,,,,m, ��,, � e.� ��
6 / -,
' � � I I �,. �- / �. , � � �MiCHE a.�, �
� � � �„,' . � , � �� � � i , i u/ �� � �I 1 I ��� � ll / / / // � �i_ - �,a � � �=e- '
-- � A �� � ��� a > `.. ' � � � �� � I � � I I � I I I � , � .. � A� I �f��r i , � � � . DUR�iAM WAR TRU57E€ � � � v �� �/ �� � �� i � �// � // � � � �� ��`�� � 'v _ . ✓ � /
\ , g � i/
.. I I . . �.. � : � A ARI R / .
�a 1l � �
- � v �v � - l � > 1 \ � � � I � � � ( � � � � � � � � � �� v � ��y ///�; ' � v � � �A � M 5U� `�, i ; ( � � � �� � �m �� � / i /% �-- � �,� ���� ,,• �� � �
\ I � D N L JACOB SU ,iA7E a i �/ / -�
� \ � � � � ( � �� , s �� ��� „l, / �// / � _ — � �� � �
.
� � �s -. � � � --, � � % \ \ � � \ � � � � ' ) � � , �%� � � ) �, � � .��� /r ,i� � i � �i � � � _�� � � _ � /°�
\ � � �
��°�� � i �� - - �\\� C � � � I�I �I� I 1 ���I ���� I � I' � , , , ;' _i , > ,� - , ; �i°a � � � ��� �� � �- ;- = _ _ ; ���,�,� �(
_ �� � _ ��( I I � � I�I / � � l� � � � ��i��' ��� �'� r , � /;'��✓/i%�iii ��°�� ii� � � ���, -, I �
� � � - _� � - _ �� �- _�� 1 � 1 � � � I ) � � / / � �� i �- ( � ,, ,,,, � /�j �� i�-.. i i -- �-���„ �
�� � � � � 1� � � I � I�l � II � � � / �� � 1 �r;���ii/ s m�/ / � , �i� i/ i� -� ; - - - � �ro� � 1 �.
� 1 I ,1 I � / � 1 � / / i i�/� .� ._
°�� � - � A � 1\ I 1 I � � I / // l �� �� /�- / / / � .r/ // � �� � � - �
� , � � � �� I � _ , ��, I I / i � � ,,, , /� , 4 �- � � _ - - ��a� �
- �- � � .,
.�
� � \\ � � � a / l � / i - �s / l i �/ / � i / /. i — — � � -, � �- _ � ; ��
� ) l ; l / > 1 r �i / - � � -
V � ii -%'
� i� i, l � �` , / � J /
���A 1 I / / , — �/ , , / _ _
� � � � \ \ l l\\V "�a ��� f �f����a l � 1 �i � ��1�/, l/,a � i � �� � / �� ,� // �!/ �/ � // , � �r:„ � , � -- - _ _ - e1__ _ _ � �
a
_; � �� � � �e, ����� ���� �� mi � �� i � � i � � �������, � _ � , iiii /,��,,i��rii/, i� �. � i,�� — — — —� —
- _ � � � �� �� /�� � � ► �� � ���il/�/� �, � � , � � � ,., � � ii i�i�a, ro,,, � � i i, ri � � �5 0 , � , �—� � , _ _ _� � � �
� � � � � �� \\1 I 1111 �//lr� � � III �I �� I�ll/l � i m � I � 1 �> > , J � �iii, //i/ � �% / �//am /// / � i�� � � ��- � _,�, - �
--� � � � ��A\\\\ // � �� �// i � � / � ( � �� �i��r l! � � d� // �//�/ �� _/ . / / / �� ia � _ � — _a�,_ � _ � , ���
�
�' � ` �- , �, , , , ,,,, � , �I� ; , �il /l/// � I , s ijj ��j%//, ,/��� �� �/i�//� � i,,� ,, — � � ✓ r
� -., � 1 I I ; % �� ; f � / ///// „ / ; � � �� 1 1 ,� 1 ��')i; //�! ii�.�,,� �� _� iii ,,�� , -- -- - '_."- _ - -
� � ��`�> i � ll//l , � � ; � � , � _ _
, ,� _ �_ `. ;;��;� i ///////i; / ' ; ;% ; �' � � �1 , � ,I „.,- i;i��/%/, �//� /,; - ��/ ''/'i' % �;- -i - _; -- _ _ � _ _ ��s�_ _ -- - - - �����
J �q
_�
__._ P ,.
�
, ,, � , . , � � � ,�, /. , --
:
� � � ,���ii � ,��� �� �� - � � , , � /���j/ i//;% �� %j���,�//� ���,�, �i' �_ _-�_-��`-=_-= �� �
�� �, -i , /,� � : ��� _-�--_ ==9s�-==-- �
-s�,
,
-
i i DETAIL A DETAIL B -� / i, � DETAIL G ���/ j DETAIL D ��
� �� � � BANK STABILIZATION BANK STABILIZATION —<�P-
� TOE PROTECTION N_ ��� /. - � Irvm�o s�iel .. -- — — — ' — — i � _ � \ �� �
� (Ho��o smie� FALSE SUMP , �Ho��o s��,� � - „ — .
S� PERMANENT SURFACE WATER IMPACTS cNo„o s<a�ei � E�=,o2,0 � - - - _„a - - - ` � � � �
� � � �: F�°��a �Traff c FD rwh � '. ror oF enNrc Hnruxni / � Nnruen� - � rov or e NK _ NnTuxn� ..-- _--. _ — —a�o - — — — V A � � - ��
� � � Q �O / j NAiURAL GROUND �/ GROl1ND � � A � I GROUNO ' � — _ � � �— ` �ar
.» V � � Na�o�oi ti> ��S�o . � I 2, � exouNo / _ _ a. � � ,
� � TEMPORARY SURFACE WATER IMPACTS � �'°°"' � ` '' � ��,, / /i� �orxr - - - - - =<a- - - _ � � � �
� _ '
�' � - - -
d RCP " � cEarEx1 iE - �, ` / D �- _ - 1 _ � �u -� -�
GEOTEXTILE
EA d=2H. � /�"% `_GEOTE%TILE � _ _ \_ •ie� � � � ` �
� � . � / , 18 IiYP.I � /j ! 0 Mn D=1Ft. - — �_ � � s.a— � � � \ � ��.. �
Hi � 6=2H —Geofext�le f'S— / ! IB (iYP.� '
� \ ^ . / S=Difch SIoPe � CE Prop d Di}ch � 8=0-2 Ft. / _ — —�' 9 _ � � \ ` ..
1( �7 � / ' YPe L- ST . 17+0 TO $?A. 17 i-40 R, ' /, / � / $ �.Y 9 / �'� TYPa f L ner Class I R p RaP � �
/ r T f L ner= Class I Ri Ra i �
<» ._. � I �.� l_� 1 I Li ��� <. �� O /. � , A r � ' \ -L- STA 2 �;a6/T i r�yiA' U+?§ /;i � � ' L� ��P P"YA^cs�+�9@OT % �i � d � , � / ' 'L15T .20-� 80 �RT-5=B:4%, l. 5' -'' �- = - — — —�.e�� _ \ \>�o, \ � .
� ` �`� -�- STA.19+ TO STA.14+25 RT / � ' �� � � ' S''��T •p� - ' B�TONS CL RIp-RAP 55 SY�fiE6TE%TILE, DDE=20C1`� _ _ _s. � � � -
� � ,� � / ��� � ', IOCN�,'
� '� � �� .;1 '"� , "// � � ���/ � �si�,zr� �� / �- .. /, ' /m l , i , . �- �- — - � � ��� �. �
z � � � � � ; / � � � / i' 7 �l ��� � ��/lll� � '�' %, / i ///� /_ _ � � _ - - s�- � � � � � �
� ; � ,���%��s��;°'i�����/i/i��iri� l il ��1� im�°/ �� „�; ii� ��,; �.%. ,-- --aa-__��������
� � � GRAPFIIC �C�I_E ' � - � � '�i - � % /r/��� / � //!/�j� /' / I� �� �� � � o���// ��/ � ' .',.�� - � � - - - � �
`� ,� /� ��i. —�/�j�/� ���� �%ill/////� / ��ll � � �� (� �/ !� �/ '/ � _-%'%— ---_,eo� —��� ��
� � �� /�j,- - �S // �j �/� , //� �/ l �, � /� � � � � .�, i � � � ee,� , � �
i � � II � � J� �.
, �
� �/ / `//�� r ////m % /� � � ���/� � l � I I ( / i � � _ � _, � �
-
� � \ \ I I �I' I'I I �I; � 1!6 I l �ly�;%, � ��� ��-�i� f/ �i�� j/���� �� /i� �� a� �� � l I � �� /�� ���99 ��� , \
� � , � � Ll/ � �, f �,% �,.sa� �,; ���� /� � �l, l , / j I l , l �_(,, �� /� �� / � _
� / i l l/ �i l �/, 1 l
� � ��� '��� ��� �� � � �
� v�� 1 ������� �II�� I I �l 1 �l� 11�1';�I:I'�I���I���I �� � � =�,�;�,; � � ,,. � � , ��� , '' ` -- :.
�� I
, , �
� , \ \ / 1 � / � / / ) , j I I � � ! � SEE _SHEET 5 '�QR L PROFILE
�� ��,<, �� �
� � 1 i � I I I I I I I'(' l l/� I I I;1 I � , � i` , , � � �' � __ �
� , ��,� _
� L- C 115 '� ESIGN EXCEPT ON RE UIRED FOR V RTICAL PROIECT REFERENCE NO. SHEET NO.
� URVE —VALUE AND SSOCI TED S D. ROADWA'Y D�GNV HYDRAULIC$
ENGINEER ENGINEER
Pl = l +q2pp Pl = l +03A0
BEGIN GRAD y� _� EN GRA E
—L— ST 13 +3 .00 K= 6 * K_ * —L— STA 1+ 00.00
ELEV. I,020 48' V= MPH y= q ,�pH EL V. _ ,O16.69'
B GIN B IDGE EN BRI GE END
—L STA.1 + 53.00 —L— TA.17 03.00 —L— ST P E RM I T D RAW I N G
� 04o SHEET 6 OF 8
�
i'
1 030 r oF cnusewnv i� 1 030
� STA ON 16+28 -L ' /
1@7 ', 1@80' S4-IN H �
� � � � � � � PRES RESSED CON ETE
� � GIR ERS SKEW=90
1 020 �� /PE fn' R,auL/C DATA 1 020
r_�`� �-�"��4� � N DES/GN REROUEN +� 'S0 YRS
/% � 18%
B IDGE H ORA(1Ll DATA �+�23 DES/GN /SC/-/ARGE - 28 CFS
1 O10 � o DES/GN ELEVA /ON � /023J/ FT j 010
� +
DES/GN REOL/EN � 50 YRS /00 1'E HW ELE AT/ON � /024./6 FT
DES/GN ELEVA /ON � /A02.8 FT ti OVERTO /NG FRE ENCY � / 00+/- YRS
BASE D/ C//AI4GE = 6.409 CFS ABUTMENT EXC VATION 400 C �< r" OVERTO ING O/SC ARGE a 33 CFS
� OOO BASE F OUENCY � /00 YRS To ELEVaTION 1,003.0 3 • OVERTO /NG ELE AT/ON a /024Ap FT j OOO
OVERTOP /NG D/SC ARGE � /8.000 CFS CLASS I RIP RAP h "�
OVERTOP /NG FRE ENLY� 500+ YRS (STRUC URE PAY ITEM)
OVERTOP /NG ELE T/ON � /A/4A• FT N ry' ABUTMENT EX AVATION 400 Y
990 FT BM#2 ELE .= 1008.63' No WSE = 990.0 �'�^ %' To ELEvnTlo 1,000.o BM#1 ELE _]055.4P 990
DATE OF SURVEY e MAY /9. /5 BL STATION 9+89.00 ISYR HT oBSER D WSE = 989 CLASS II RIP P - �
WS.ELEV TiON
IUR SPIKE S T IN ROOT F 28"X48"TRI MAY 1 2015 (STRUCTURE P Y ITEM) REBARA]VD AP STAMPE 84766 BL1!"
AT DATE OF SU Y � �� FT FORKED BE CH TREE BANK STABILIZ TION SET FLUSH ITH TNE G OUND !N
%HO �OVExiO�"PiMGE AiK.wEOWLS AIC%OwMAt �AWbw.Sr,vqx �a-l- CLA55IIRIPRA GRAVEDRI WAY �%80
10+00 11 12 13 14 15+00 16 17 18 19 20+00 21 22
TEMPORARY OCK CAUSEWA
TE POR,4RY SURFAC WATER IMPACT
3�
E v>
n .A
�i tA
�
rn �
; Fn
�
� �
i �
a �p
� Z
��� BRIDGE PROFILE
w�'� SITE 1
���
��
���
a��
���L
_��
���-
o ��
,��
v ���
' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' F.A�. PROJE�T ��. BRSTP-�}115f�)
➢S+OCe i5+50 15+04 16►5U 57�44 17+5p.
GRAiDE �DATA
t^l3,ga��y FILL FACE 2 ENf3 €)ErVT i FILL FaCE ra ENO �ENT 2 GRAQE aATA
s-�o.�aiar. srn. i�•s�.ofl -�- IHr. SPAN A SPAV�V B =�r.
GRA�E PT.EL.1015.62 STA.IT+D3.�a -L-
�I STA = 14+-02.D0 'L' GRapE PT. EL. 1d14.Bt t-1p,5pIGX [+i3393�Y
EL.= 1015.38 ��IH FitOhfT SLOt'E �'-�•�I�1.BE�1� �'-6"MI�i. PI STA = 18rD3.0a -L-
L = 22€]' � [TrP.a �EGIN FRpNT SLOPE
102Q STa.15►aV.9t -L-
G�Ai]E PT.EL.401S.59 a.ps U�CLASSIFIEO EARTH SERt�IA 5Ta.1T+�3.85 -L- EL.• l01a37
��,1fl� STRCiCi4lRE E�. lQ�3 [TYP,1 CRApE PT. EL. 1014.82 �=19�• P E RM I T D RAW I G
� E%ISTING EkCAVdTI�OH �r
—� �L. �flz�.o � o� F=�. F=�. ST ¢TrP.�E �,.�.� ��.,aa9 �'� S H E ET 7 O F 8
mio i°-o- � �4• asva � a.
@ ITYP.� , �{ � � EL. 5044.12 � aS
� APPROlfIAIATE
+ � •�
W �� �.�s f1 � ti EL. rooa.ot � cR�No
� I E1.'�� l t TEhdPORpRY +` EL. I� I w
�oao �� EL.947.Ot A� ROCK 448.A$I
�CkItSEWAY � ti
+ I` N1.5 � EL. 9B9.6 N.W.S f i � I
1%2�' �O�PE ` kCAYATE TO � t05/19/l51 •`�9ad � 1
99� I! �• �oo�.0 1 ti I 9 ! t i'rni s�oPE I I assu�aea ExISTIhtG
1 1 f 1 z= i S � a P E I � E7fCAYATE TO �i � STETL��ILES 5TRUCTI9RE�
C_� �� �i� �ap 7 q���4 �7 �. toav.o C_� n
CLT��.II P � 2e1 SLOPE � 1 IP RAP �� ITYP i � H
ASSl11AE� T0� CLA55 B
9$� OF �RILLED PIER J yJj "� �dOF�M+aL
Ih1TEGRAL EL.99I.00 '" INTEGi�AL warE�
EN6 BENT 1 BE�iT 1 E�ID BE14T � SIJRFACE
�+ n�,I' /�^II �+ � � �RAP �
�E1.TIlJI'� �LVI�Y1) —L— �� CLR55 II STREAAY
8E[}
15m°-e'[i6TAL LEhlCTH 9F BRII?GEI [FILL FACE TO FILL FACEs T E�IP (�R A R Y
za•-o- ao�-o- R J C K C A L� 5 E W A Y
�•-a-
�
� 9EHT , �9
CDMTROL
LI�iE
Y
W
W
q �� '� RIP RAP � �
CLASS II� � ���P
3•-o•�irr. } � �rnxw:
Ea�TH BE�t� �
EL.1�45.00 I� � �
fLEVELI ' I g
a
����1����� u ��%'S��
�rseo L�� V��T �o�� �[fDf� ��i��4�E�'�TI��
n�c wa«
� �n I � 4'
FILL I I
FkCE i .
TO SR 1596 'g ��� �� I
�, STA. p6+23.� -L-
W'.p. •1 nI I nI � N jI�I"�I Nl.f'. •3
STA. 15+53.Oi7 -L- I I I I I I T I�16 28.OmT�� � I� I I I STA. i7+�3.00 -L- E STA.�7+27 1H
BE�CIN n�PR�OACH SLA6 GIF� FRpNT SLOPE
5Ta.15►28.8� -L- gaa'q0''QO" I I E -L-
BEGIN FR(7NT SLOPE I I i [TYP,] I I � ., I � � � �FILL STA.17+13,85 -L-
STA,15+d1.97 -L- I LJ � Q �� I I FACE
ExISIrNc �,
I STR4JCTURE �TEFAPORART n' I TQ SR 1597
[TYP.1 itDCK
+ CALfSEWAY _
� � � � �
q� �„I �'-0"MIN. �$
� z5,_�,* EARTH BER�AI
4� EL. 10�4.25
W tLEvEL}
. � y� � RIP RA�P
RIP RAP q- } � CLA55 II
q� CLA5�5 II p �
� �
� PLAIV �
pRA'�!� BY � N.i7`AIi1T0 pA� � PdZ4/15 � IPILES, COLLJA�HS a PIE�tS hYOT
��KEp py � V.A�ATEL pA� � i12i115 SN61Y�N FOR CLARI7Y1
GiSIGN EHGIb1E�Pi 9R �COR{,y RATE 1
p cv
SL=
P v�
I FEitEB�' CERTIF'r TFESE �'Ln�S
,4RE TFE AS-B6JILT FLAa�S
PR��EeT �vo. �-4 76�
IRE�ELL couNTr
STATION: ��+28.oa -�-
SFEE7 1� pF 2 REPLACES BRIpGE Fs6.fi9
sr,�� n iaen u�c�ar
UEPARTMENT OF TRANSPi]RTATION
PiRELIMINA�RY
�EhIERAL aRAWI�JG
FC1R BRIC�GE OVER ROCKY CREEYC
4N MC 115 �ETWEEN
SR 159b ITAYLQR SPRINGS R�f.)
& SR 15�� (RACE PATH Rp.f
H[vZsiaxs s�F£r rw.
. Rr. ru,r. w ... �.,r. 5-1
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
ac ac ac ac ac ac ac ft ft ft
1 -L- 15+76 / 16+80 bank stabilization 0.03 < 0.01 120 10
1 -L- 16+00 / 16+36 temporary rock causeway 0.03
2 -L- 20+50 30-inch RCP-IV < 0.01 98
2 -L- 19+80 / 19+98 LT bank stabilization < 0.01 < 0.01 10 10
2 -L- 20+79 / 21+02 RT bank stabilization < 0.01 10
TOTALS*: 0.04 0.03 228 30 0
*Rounded totals are sum of actual impacts
NOTES:
1. 62 feet of temporary surface water impacts due to temporary rock causeway are within permanent surface water impacts due to bank
stabilization
2. permanent surFace water impacts due to interior bent equals 21 square feet
3. 25 feet of existing channel impacts due to widening of the channel bed upstream of the 30-inch RCP at -L- station 20+79 is considered
part of the pipe installation
Revised 2013 10 24
�
�
�--�—� OFF-SITE DETO UR
BEGIN TIP PROJECT B-4766
—L— STA.13 + 32. 00
���� 11 A �ll ���' �1�� �d 11����� d J1
�� �Y ����� �/O� ��`l_ly� VV � 11 �
IREDELL CO U1�TY
LOCATION: BRIDGE No. 69 OVER ROCKY CREEK 0111
NC 115
TYPE OF WORK DRAIIVAGE, GRADI11tG, PAVI1�lG, � STRUCTURE
�
-- �
� � NC l/S
_�TO STATESVILLE — — — —' —
a
�
A
Im \ �
x /
� 1 � � �
�I �\y ��_ =-f�" -�
� � _ _I- � , �
BEGIIV BRIDGE
—L— STA.15 + 53.00
E1VD BRIDGE
—L— STA.17 + 03.00
L,
NC 1�5 �
-�- SZA z�
�
N
PO a�95
E1VD TIP PROJECT B-4766
—L— STA. 21 + 00.00
WILKESBORO ��
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
NOT A CONTROL OF ACCESS PROJECT.
DESIGN EXCEPTION REQUIRED FOR VERTICAL CURVE.
PRELIMINARY FLANS
DO NOT USE FOR CONSTRUCTION
P�epored !n ihe Offlce of: H1'DRAULICS ENGINEER
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH
ADT 2012 = 2,ioo DIVISION OF HIGHWAYS
50 25 0 50 100 1000 Birch Ridge Dr., Raleigh NC, 27610 ��R�'
`7.�ji�I� ADT 2040 = 3,600 LENGTH ROADWAY T.I.P. PROJECT B-4766 = 0.117 MI ��°� �c,��
DHV = 10 % 20/2 ST9NDARD SPECIFICATlONS �@ p
PLANS � �s
o P.E.
D= 55 /o LENGTH STRUCTURE T.I.P. PROJECT B-4766 = 0.028 MI s,cxnrunF: � '
50 25 0 50 loo T= 13 %* RIGHT OF WAY DATE: JASON MOORE, PE � �
V= 60 MPH SEPTEMBER 30 2015 PXo�Ecr eNc.NeEn ROADWAY DESIGIV
PROFILE HORIZONTAL ENGINEER
( ) * TTST =5% DUAL 8%a TOTAL LENGTH OF T.I.P. PROJECT B-4766 = 0.145 MI ������ ��°���
to 5 0 l0 2o FUNC CLASS = LETTING DATE: NYA K. BOAYUE, PE p���
MAJOR COLLECTOR JUNE 21, LO�G PROJECT DESlGN ENGINEER
PROFILE (VERTICAL) REGIONAL TIER r.E.
S7GNATURE:
�
�
�
Note: Not to Scale
*S. U.E. = Subsurface Utility Engineering
BOUNDARIES AND PROPERTY.•
State Line --•-• •-•--
County Line
Township Line --- ---
City Line - -
Reservation Line — — —
Property Line
Existing Iron Pin �
Property Corner —^
Property Monument �
Parcel/Sequence Number 123
Existing Fence Line -x x X-
Proposed Woven Wire Fence �
Proposed Chain Link Fence a
Proposed Barbed Wire Fence �
Existing Wetland Boundary - - - -��a- - - -
Proposed Wetland Boundary •�B
Existing Endangered Animal Boundary E•a
Existing Endangered Plant Boundary E°a
Known $oil Contamination: Area or $ite � �
Potential Soil Contamination: Area or Site � �%
BUILDINGS AND OTHER CULTURE.•
Gas Pump Vent or U/G Tank Cap O
Sign �
�/@�� �w
Small Mine 5Z'
Foundation �
Area Outline 0
Cemetery 0
Building �
School �
Church �
Dam
HYDROLOGY.•
Stream or Body of Water
Hydro, Pool or Reservoir �-----
Jurisdictional Stream —�S -
BufFer Zone 1 ez i
Buffer Zone 2 sz z
Flow Arrow F —
Disappearing Stream �- ---
$pring p�_...�, ^
Wetland �
Proposed Lateral, Tail, Head Ditch �
� ��
False $ump �
����I°]E �]F 1���$�]�[ ���$�]L�1��
�����]I�� �IF l�[��]I���1�Y�
CONVENTIONAL PLAN SHEET SYMBOLS
RAILROADS.•
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
RIGHT OF Wfl Y.•
Baseline Control Point
Existing Right of Way Marker
Existing Right of Way Line
Proposed Right of Way Line
Proposed Right of Way Line with _
Iron Pin and Cap Marker
Proposed Right of Way Line with
Concrete or Granite R!W Marker
Proposed Control of Access Line with
Concrete C/A Marker
Existing Control of Access
Proposed Control of Access
Existing Easement Line
Proposed Temporary Construction Easement -
Proposed Temporary Drainage Easement
Proposed Permanent Drainage Easement
Proposed Permanent Drainage /Utility Easement
Proposed Permanent Utility Easement
Proposed Temporary Utility Easement
Proposed Aerial Utility Easement
�
CSX 7RWJSPoRTATION
0
MILfPOST 35
0
SNITCH
�
�
��
W
W
-E
TDE
PDE
DUE
PUE
TUE
AUE
Proposed Permanent Easement with O
Iron Pin and Cap Marker �
ROADS AND RELATED FEATURES.•
Existing Edge of Pavement -----
Existing Curb -----
Proposed Slope Stakes Cut --- �---
Proposed Slope Stakes Fill --- F---
Proposed Curb Ramp CR
Existing Metal Guardrail
Proposed Guardrail T T T T
Existing Cable Guiderail n n �
P d C bl G'd 'I n n n n
ropose a e ui erai
Equality Symbol
Pavement Removal
T�EGETfITION.•
Single Tree
Single Shrub
Hedge "�'
���������
�*
Woods Line �''-'
Orchard
Vineyard
EXISTING STRUCTURES.•
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Drainage Box: Catch Basin, DI or JB
Paved Ditch Gutter
Storm Sewer Manhole
Storm Sewer
UTILITIES.•
POWER:
Existing Power Pole
Proposed Power Pole
Existing Joint Use Pole
Proposed loint Use Pole
Power Manhole
Power Line Tower
Power Transformer
WG Power Cable Hand Hole
H-Frame Pole
Recorded U/G Power Line
Designated U/G Power Line (S.U.E.*)
TELEPHONE:
fl f3 f? f?
Vineyortl
CONC
— � CONC WW I
�
CONC HW
?---------�
� CB
Os
•
•
O
►/
r
��
Existing Telephone Pole ♦-
Proposed Telephone Pole -O-
Telephone Manhole OO
Telephone Booth ❑e
Telephone Pedestal ❑T
Telephone Cell Tower �
U/G Telephone Cable Hand Hole NH
Recorded WG Telephone Cable T
Designated U/G Telephone Cable (S.U.E.*) - - - - -�- - - -
Recorded WG Telephone Conduit �_
Designated WG Telephone Conduit (S.U.E.*� - - - -�_- - - -
Recorded U/G Fiber Optics Cable ���
Designated U/G Fiber Optics Cable (S.U.E.*� - - - -• °�- - -
WATER:
Water Manhole OO
Water Meter o
Water Valve �
Water Hydrant �
Recorded U/G Water Line w
Designated U/G Water Line (S.U.E.*� - - - -•- - - -
Above Ground Water Line ^�c Watef
TV:
TV Satellite Dish C�
TV Pedestal ❑O
N Tower �
U/G N Cable Hand Hole HH
Recorded U/G N Cable ��
Designated U/G TV Cable (S.U.E.*) - - - -*�- - - -
Recorded l�G Fiber Optic Cable T° ��
Designated U/G Fiber Optic Cable (S.U.E.*j- - - - -*� ��- - -
GAS:
Gas Valve 0
Gas Meter �
Recorded WG Gas Line °
Designated U/G Gas Line (S.U.E.*) - - - -�- - - -
Above Ground Gas Line A�c cas
SANITARY SEWER:
Sanitary Sewer Manhole �O
Sanitary Sewer Cleanout �
U/G Sanitary $ewer Line ss
Above Ground Sanitary Sewer A�c so��tarY sewe�
Recorded SS Forced Main Line �5s
Designated $S Forced Main Line (S.U.E.*) - - - - -F�s- - - -
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
Utility Located Object
Utility TrafFic Signal Box
Utility Unknown U/G Line
U/G Tank; Water, Gas, Oil
Underground Storage Tank, Approx. Loc.
A/G Tank; Water, Gas, Oil
Geoenvironmental Boring
U/G Test Hole (S.U.E.*)
Abandoned According to Utility Records
End of Information
•
0
O
�
�
�
�
AATUR
E.O.I.
PAVEMENT SCHEDULE
(FIN�IL PAVEMENT DCSIGN)
PROP. APPROX. 1 1/2" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
C1 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD.
PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
C 2 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO
LAYERS.
D1 PROP. APPROX. 3" ASPHALT CONCRETE INTERMEDIATE COURSE,
TYPE I19.06, AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD.
E1 PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE 625.06,
AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
R SHOULDER BERM GUTTER.
�J EXISTING PAVEMENT.
T EARTH MATERIAL.
NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.
�-L- NC 115
s� iz� � ir s�
TYPICAL SECTION ON STRUCTURE
—L— STA. 15 + 53.00 TO STA. 17 + 03.00
PROIECT REFERENCE NO. SHEET NO.
B-4766 2
ROADWAY DESIGN PAVEMENT DESIGN
ENGINEER ENGINEER
�-L-NC 115
TYPICAL SECTION NO. 1
�-L- NC 115
?'I
a�
4:�
USE TYPICAL SECTION NO. 1
—L— STA. 13 + 32.00 TO STA. 15 + 53.00
—L— STA. 17 + 03.00 TO STA. 19 + 00.00
� � ��...�� ���. ��v� � �.v. �.-.
� -L- NC 115
8' EXIST. EXIST. 8'
VAR. 70J' +/- TO 11.2' VAR. 10.0' +/- TO 10.9' 11' w/GUARDRAIL
CROWN
POINT C�
E`_IST. EXI �ST
0.08 0.08
U
TYPICAL SECTION NO. 2
NOTE: LOCATION OF RETAINING WALL
-L- LT. STA 17+12.00 TO STA.18+15.00
USE T.S. No. lA INCONJUNCTION W/
T.S. No. 1
�C SEE PLANS FOR LOCATION
OF SHLOULDER BERM GUTTER
AND DETAIL ??? FOR PLACEMENT
�'�R
SFF 6 7 TO
�'SF�r�o�?S �
USE TYPICAL SECTION NO. 2
—L— STA. 19 + 00.00 TO STA. 21 + 00.00
Z
0
>
�
a
�
n
a
s
�
�
�
BEGIN BRIpGE
-�- sra is+s�
BEGIN ?PP.SLAB
-�- sra is+2a.as
GRAU 350 TL-3 NPE B-77
� o
� o
GRAU 350 TL-3 TYPE B-77
END BRIOGE
-�- srn n+os.00
END APP.SLPB
-�- sra n+2�n
TYPE B-77
-p o �
��V�E p
TYPE B-77
PROP. SHLD
BERM GUT7ER
� I
SKETCH SHOWING BRIDGF�ROADWAY RELATIONSHIP
-L-
Pl Sto 11+49.47 Pl S10 20+59A3 Pl Sto 2/+8280
�_%07'38.4'fRTJ �_ �52'l75'tLT1 �= 3'54'5b2'tLT1
D= 2' 23' 14.4 D=/' 54' 355' D= 3' 49' llA'
L= 29855' L= 9799' L= 102.47'
T=/49.47' T= 49.00' T= 5/26' 3l q 5
R= 2.400.0�' R= 3.000.00' R=/,500.OIp' �
PROJECT REFERENCE NO. SHEET NO.
8-4766 4
RNJ SHEET NO.
'.OADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
PRELIMIN RY PLANS
DO NOT USF, FO CONSTRUCTION
DETAIL C DETAIL D
DETAIL A DETAIL B �� qqNK STABILIZATION BANK STABILIZATION
TOE PROTECTION FALSE SUMP i�a��o s�oml
� rvm m s�oiel I Nm m s�aie7
( Nm to Scale) �� EL=7024.0' ror or enHe
Ouiside Difch roP oF enHK Nniuxn�
�P°'�e Troffic Flow Nnruan� (� N^ouw.� Naruxni crtouNo
Nafurol .��� �`�S�°Q l�') � 2� GROUND ��E% UN� GROUNO —
Graund � y � F
�� ti,
� 'i d �� �' GEOTf%TILE
d=2fr. RCP GEoiEX�lIE T1LE � GEOTEXiILE
6=1fr. Geote.�lle r5— 1e.�n.p� te^�Tvv.� B Min D=1F�.
S=Difch Slope CE Proposed Difch 8=0-2 Ft.
Type of Liner� Closs I Rip Rap Type of Liner= Gloss I Rip-Rap
-L- STA. 20+40 TO STA.20+76 RT -L- STA. 19+98 LT
-L- STA. 17+00 TO STA.17+40 RT 12 TONS CL I RIP RAP, 30 SY GEOTE%TILE, DDE=10CY -�- STA. 20+80 RT, 5=6.4%, L=25'
-L- STA. 19+00 TO STA. 19+25 RT 28 TONS CL I RIP RAP, 55 SY GEOTEXTILE, DDE=20CY
SEE SHEET 5 FOR —L— PROFILE