HomeMy WebLinkAbout20151222 Ver 2_Approval Letter_20160321Water Resources
ENVIRONMENIAL OVAUiY
PAT MCCRORY
c����e�-„�,�
DONALD R. VAN DER VAART
s«�em,�s�
S. JAY 'LIMMERMAN
Dn'C[ Inl'
March 21, 2016
Dare County
NCDWR Project No. 20151222 v.2
TIP B-2500 Phase I
APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS
Mr. Philip S. Harris, I]I, P.E., CPM
Natural Environment Sec[ion Head
Project Development and Environmental Analysis
North Carolina Department of Transporta[ion
1598 Mail Service Center
Raleigh, No�th Carolina, 27699-1598
Dear Mr. Harris:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
constructing a 500 ft. long by 4.79 ft. high habitat enhancement structure in Patnlico Sound in Dare County:
O en Water Im �acts in the Pas uotank River Basin
Site Open Water Fill (ac)
1 0.06
The project shall be constructed in accordance with your application dated received February 19, 2016. After
reviewing yoor application, we have decided tha[ these impacts are covered by General Water Quality Certification
Number 3885. This certification corresponds to the Nationwide Permit 27 issued by the Corps of Engineers. In
addition, you should acquire any other federal, state or local penni[s before you proceed with your project including
(but not limited to) Sediment and Erosion Control, Non-Discharge and Water Suppty Watershed regulations. This
approval will expire with [he accompanying 404 pennit.
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you mus[ notify [he NCDWR and submit a new applieation. If the proper[y is sold, the
new owner must be given a copy of this Certifica[ion and approval letter, and is thereby responsible for complying
with all the conditions. If total wetland fills for this project (now or in the fumre) exceed one acre, or of total
impacts to streams (now or in the future) exceed 150 linear feet, compensarory mitigation may be required as
described in I SA NCAC 2H .0506 Qi) (6) and (7). Additional buffer impacts may require compensatory mitigation
as described in 15A NCAC 2E3.0259. For this approval to remain valid, you must adhere to the conditions Iisted in
the attached certification and any additional conditions IisCed below.
SlateoCNonh Camlino iGnvrtoninenlal Quality I W��er Resnumes
1617 Mail Service Center, Raleigh, Nonh Carolina 27699-1617
Phone�.919�807-6300
Condition(s) of Certification:
l. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal)
havingjurisdiction, including but not limi[ed to applicable buffer rules, stormwater management rules, soil
erosion and sedimentation control requirements, etc.
2. The Permittee shall ensure that the final design drawings adhere to the certification and to the drawings
submitted for approvaL [ 15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or
protected riparian buffers. [15A NCAC 02H.0506(b)(2)]
4. If work conditions require barges, they shall be floated into position and then sunk. The barges shall not be
sunk and then dragged into position. Under no cirwmstances should barges be dragged along the bottom of the
surface water. [15A NCAC 02H .0506(b)(3)
5. Adherence to The Gtrlde[ines for Avoidrng Impacts to the Wes! /ndran Manatee: Precat�tronary Measures for
Construction Activities rn North Caralrna Waters will be required throughout construction.
6. All mechanized equipment operated near surface waters must be regulady inspected and maintained to prevent
contamination of s[ream waters from fuels, Wbricants, hydraulic fluids, or other toxic materials. [15A NCAC
02H.0506(b)(3)]
7. Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect
s�rface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3)]:
a. The erosion and sediment conVol measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosron
Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must
be such that they equal, or exceed, the requirements specified in the most recent version of the North
Carolrna Sediment and Erosron Control ManuaL The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) projects, including contractoo-owned or leased borrow pits
associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Ac[.
8. Sedimen[ and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by
this Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)]
9. Native riparian vegetation (ex. list trees and shrubs native to your geographic region) must be reestablished
within the construction limits of the project by the end of the growing season following completion of
construction.
10. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water
quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act)
and any other appropriate requirements of State and Federal law. If NCDWR determines that such standards or
laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law
is being violated, or that further conditions are necessary to assure compliance, NCD W R may reevaluate and
modify this certification. [ISA NCAC 02B.0200]
11. The Permittee shall report any violations of this certification to the Division of Water Resources within 24
hours of discovery. [ I SA NCAC 02B.0506(b)(2)]
12. Upon completion of the project (including any imp2cts at associated borrow or waste site), the NCUOT
Division F,ngineer shall com�lete and return the enclosed "Ce�tification of Completion Form" to notify
NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(fl]
13. A copy of this Water Quality Cenification shall be maintained on site at the construction site at all times. In
addition, the Water Quality Certification and all subsequent modifications, if zny, shall be maintained with the
Division Gngineer and the on-site project manager, [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506
(b)(2) and (c)(2)]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the offlce of Administrative hearings. You must file the petition
witl� the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hows. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, excep[
for official state holidays. The original and one ( I) copy of the petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the documenf is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919) 431-300Q Facsimile: (919) 431-3100
A copy of the petition must also be served on DEQ as follows:
Mr. Sam M. Hayes, General Counsel
Department of Environmental Quality
1601 Mail Service Center
This letter completes the review of the Division of Water Resom�ces onder Section 40I of the Clean Water Act. If you
have any questions, please contact Garcy Ward a[ (252)94G6481 or garcy.ward r�i ncdenr.gov.
Sincerely,
I � �' I ���i I �l
1%' /
S. Jay Zimmerman, D�rector
Division of Water Resoumes
Attachments (Gcneral Certifications and Certiticate of Complction form)
Electronic copy only distribution:
Tracey Wheeler, US Army Corps of Engineers, Washington Field Office
Rodger Rochelle, NC Department of Transportation
Chris Rivenbark, NC Depar[ment of Transportation
Colin Mellor, NC Department of Transportation
Dr. Cynthia Van Der Wiele, US Environmental Protection Agency
Gary Jordan, US Fish 2nd Wildlife Service
Travis Wilson, NC Wildlife Resources Commission
Clay Willis, NC DOT Division I
Greg Daisey, DCM, Elizabeth City
Cathy Brittingham, DCM, Raleigh
Garcy Ward, NC DWR, Washington Regional Oftice
File Copy
Water Resaurres
ENVIHONMEN IAl OUALITY
NCDWR Project No.: County:
Applicant:
Project Name:
Date of Issoance of 401 Water Qaality Certifcation:
PAT MCCRORY
�
DONAI.D R. VAN DER VAART
s«���•,���,�
S. JAY ZIMMERMAN
I)IfPclr)Y
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Cer[ification or applicablc Buffer Rules, and
any subsequent modifications, the applicant is required to retum this certificate Co the 401 Transportation Permit[ing
Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-I617. This fonn
may be returned to NCDWR by the applicant, the applicanYs authorized agent, or tlie project engineer. It is not
necessary to send certificates from all of these.
Applicm+t's Cerlificntion
I, , hereby state that, to the best of my abilities, due care and diligence
was used in Ihe observation of the construction such that [he construetion �was observed [o be built wi[hin substantial
compliance and intent ofthe 401 Water Quality Certification and E3uffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Date:
AgenPs Certijleafian
I, , hereby state that, to tlie best of my abilities, due care and diligence
was used iu the observation of the construction such Ihat the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certifica[ion and Buffer Rules, the approved plans and
specifications, and other supporting ma[erials.
Signature:
Eregineer's CerBJlcnlion
Partial Final
�, , as a duly registered Professional Engineer in the Sta[e of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, lhe approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
Slale o(North Corolina'�.Envimninenlal Qnaliiy I Wmcr Resoirtces
1617 Mail Service Center, Raleigh. Notlh Carolina 27fi9946ll