Loading...
HomeMy WebLinkAboutNCG030289 DMR SW (10)STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT GENERAL PERMIT NO. NCG030000 SAMPLES COLLECTED DURING CALENDAR YEAR: 2016 CERTIFICATE OF COVERAGE NO. NCG030289 (This monitoring report is due at the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME Consolidated Diesel Company COUNTY Nash PERSON COLLECTING SAMPLES Andrew Rodak PHONE NO. ( 252) 437-6611: CERTIFIED LABORATORY Environmental Conservation Laboratories Lab # NC 591 Lab # _ PLEASE SIGN ON THE REVERSE 4 Part A: Specific Monitoring Requirements Outfall Date 04531100400 .."" 00400 0t'654";`00400 New Motor OilUsage, O1Q51� ,: Annual aYeru Fe N0 Sam le;Gollected P in .,., , ... PHS `:"Co "'er'.m L''Oil3M„Total PP Benchmark mg/L'and ,.., .,..;.5�a Grease, Toxic' z mak, mak:, mo/dd/ r`Standard units; .l� ,FZinc,`mg/L' ,.Lead, ` x� in i Benchmark��- . Withm60007s 0067 ��.� A 02/24/16 8.35 0.0867 0.374 0.0162 - 47.1 0.007 D 02/24/16 7.40 0.010 0.200 0.0102 < 3.79 < 1 Note: If you renort a sampled value in excess of the benchmark value. or outside the benchmark ranee for nH. you must implement Tier 1 or Tier 2 responses See General Permit text. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes X no (if yes, complete Part B) Part B: Vehicle Maintenance Activitv Monitorine Reauifments Outfall7Date n 04531100400 ,00556 No> SampleCollected;Oiland Grease, Total Suspended Solids; pH, New Motor OilUsage, L Stannard Annual aYeru Fe in .,., , ... ..��x m /I:RAW units:, al/mo' Benchmark 30.' Note: if you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses. See General Permit text. STORM EVENT CHARACTERISTICS: Mail Original and one copy to: Division of Energy, Mineral and Land Resources Date 02/24/16 (first event sampled) Attn: DEMLR Central Files Total Event Precipitation (inches): 2.91 1601 Mail Service Center j Raleigh, North Carolina 27699-1601 .5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my i certify that to the runoff has occurs plan included in tl wiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO),1 st of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management Stormwater Pollution Prevention Plan." JC)\-., A J�dA Name (Print name) P+SS I ST►'4NT p �q,,jT YV1Ai��g e f Title (Print tit 12-1 l (Sig ati) "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." -3)8 22 (Date) S WU-245-031308 Page 2 of 2