Loading...
HomeMy WebLinkAboutNCG020060 DMR SW (4)..ANNUAL SUMMARY DMR.- STORMWATER SEND TO CENTRAL OFFICE* STORMWA TER DISCHARGE OUTFALLS (SDO) GENERAL PERMIT NO. NCG020000 *ReportALVSTORMWATFR Monitoring W a on this'form (including No Flow .and No. Discharge: and Perniii Zimii;Violaiions:) by. MARCH / ojegch year CERTIFICATE OF COVERAGE NO. NCG0200.60. SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Pomona Quarry COUNTY: Guilford PERSON COLLECTING SAMPLES: David Thorne PHONE NO. 336-299-2211 CERTIFIED LABORATORY: PACE ANALYTICAL Lab '#12 ADD TO LISTERVE? YES 0 NO ❑ EMAIL: Part A- Stormwnter Mnnitnrino Ram.ira fo Outfall No. Date Sample Collected (mo/dd/yr OR NO FLO t In Tier'2 Monthly # of -Months in Total Flow Monitoring? Tier. 2 (MG) /n Sampling2. Total. Suspended Total Event Solids- Turbidity° Settleable , Rainfall Duration (mg/1) (NTIJ) Solids (ml/I) (in - 1003'4 ` See-Footnote.4. 0.1 3 Jan. -Jun. No Outfalls Exist Jul. -Dec. No Outfalls Exist 1 ' If "Nil FI (lW° �r °un nrcru a vr.❑ e...e_ wrn crna,.n _ - I ------ - - __ . . . ...,ate......... no.c auu uie LAM mange. e d 3Per NCG02: Tier 2 Monthly Sampling shall be until 3 consecutive samples are below the benchmark or within the benchmark range. 4°If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Teir 1 or Tier 2 responses in the General Permit. TSS benchmark values are 100 mg/l except in ORW, HWQ, trout, and PNA waters where they are 50 mg/l. SThe discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservois designated as trout waters; 25 NTU for all lakes and reservois, and all salt water; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO. Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO. Permit Date: UN2010-12/31/2014 Last Revised 01-21-11 Page 1 of 2 "W. Part A: Vehicle Maintenance Activitv Monitorine Requirements for facilities usina > SS ant of np.w mntnr nfl/mnnth nn a.,Ar— Outfall No. Date'Sample Collected (mo/dd/yr OR NO FLOW)' . In Tier -2 Monthly, #'of Months in New Motor Monitoring? Tier 2 Oil Usage (y/n) SamplingZ (gal/month) _ Total Flow TPH using method (MG) 1664A SGT. --HEM (mg/1) - 15 3 Total Suspended Solids (mg/1) 100 s pH Total Event (Standard Rainfall Duration Units) (in) 6-9 s Jan. -Jun. Corrin led Water Jul. -Dec. Comingled Water HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO Fr— HAVE— HAVE YOU CONTACTED THE REGION? WHO AT THE REGION HAVE YOU SPOKEN WITH? YES ❑ NO ❑ MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW" "NO DISCHARGE" & LIMIT VIOLATIONS) BY MARCH 1 OF EACH YEAR TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6300 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information sumbitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for. gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant -penalties for submitting false information, including the. possibility of fines and imprisionment for knowing violations,'---------)� f `— 1/6/2016 (Signatur f Permi e) (Date) Permit e: 1/1/2010 /31/2014 Last Revised 01-21-11 Page 2 of 2