HomeMy WebLinkAbout20070812 Ver 1_Fax_20070921Caty of Salisbury 9/21/2007 10:57 PAGE 001/005 Fax Server
~A.LIS~URY~
NORTH CARQLINA
~~
Salisbury--Rowan ~Ttilities
Department
Administrative Division
City of Salisbury
1 Water Street
Salisbury, NC 28144
General Phone: (704} 638-5205
General Fax: (704} 638-8470
~Veb Site: www.salisburync.gov/utilities
TQ; Name:
Company:
Fax Number:
Voice Phone:
From: Name:
Fax Number:
Voice Phone:
Mr. John Dorsey
NCDENR-DR'Q
1-919-733-6893
1-919-733-5083
Terrie Tooley, Administration
704-638-8470
(704} 638-4476
Notes:
Please see attached documents. Originals to follow.
Date and time of transmission: Friday, September 21, 2007 10:55:22 AM
Number of pages including this cover sheet: OS
SEP-21-2887 FRI 10:51 TEL:9197336893 NAME:DWQ-WETLANDS ~'• 1
N
l11
m
H
LL
r-1
~U
i
W
~~
M
W
lD
f''1
M
N
Q1
J
W
F-
lD
Ifl
~--i
H
LL
~Y
(1J
r-1
N
i
CL
W
N
y
~C
w
0
0
0
0
w
a
0
0
O
N
.--I
N
.~
r '~
a
+}
•,~ .
U
r~
m
~o
M
N
Q~
J
W
H
H
m
N
w
City of Salisbury 9J21/2007 10:57
COLLBC~B OP
ARTS ~ 3C[8NCH8
September 19, 2007
Matt Bernhardt
Salisbury,Rowan Utilities
Salisbury, NC
Dear Matt:
PAGE 0051005
xx~ uH:v~~Latrv
Rt CiAliL 1LLL
Fax Server
pBIMA1'tiLDFtr dp 11L10G1lAr~nY
3A1JNriDll9 BAL'1: T 9~p.pA~,sgor
L`Al~'V~l L+Cn4 7a~o r grp.gtis.tS97
4`HAYiI tuft. NC. 37J04`7~~a ••+R•.-anc-ada/dc~tafAso~
On 13, September 2007, APGI's attorneys Sled letters with FF,RC and NC DWQ advising those
agencies to question the conclusions, accuracy, and scientific validity of my report Effects of Bridges
over Yadk;~ River on Water Surface Elevation Profiles. As I understand it, the attorneys conclude
that the information in the report is insu~iciart for an outside expert to evaluate the report's
assumptions, methodologies, accuracy, or conclusians.
My reports are intended to identify the information that I used to conduct the analysis and to provide
the information that another scientist or engineer would need to replicate my analysis. In the bridge
report, paragraphs 2-4 describe the bridge dimensions that I used. All other data (e.g., channel
geometry} are based on previously presented data sources. I also provide the assumptions that were
required in the execution of the HEC-RAS model. These are clearly stated in the report, and a
scientist or engineer could execute the model as I have described therein. One of the sources for the
bridge information is www.gribblenation.com/ncpics/us29/veilcox.html, which was inadvertently
omitted from a footnote.
The Alcoa attorneys do not refer specifically to my report, F.quilibriurn .!*alysis ojYadki* aid Soutb
YadkiA Rivers, but the letter might be read as referring to it (because it is one of the reports submitted
to DV~'Q and FERC by Salisbury on August 24). The data and analysis in that report were extremely
simple. As recommended by Dr, Bales of the USGS, I simply downloaded freely available data from
the USGS website and ran a correlation analysis between width and year. This work is easily
replicated.
Throughout these reports and previous reports for Salisbury, I have presented the level of data,
methodology, analytical detail, and substantiated conclusions that I am accustomed to presenting
andior evaluating in scientific analysis and publications, which includes more than 35 peer-reviewed
journal publications, and service as apeer-reviewer of more than 50 manuscripts for technical
journals, In sum, I have provided the information needed for a scientist or engineer to replicate my
analysis. I would be more than happy to discuss these results, and their underlying sources, and
particularly to discuss any potential erroneous conclusions that may be present if shown quantitative
results that indicate error in my analysis, results or conclusions.
Best regards
~,.~~•°~
Martin W. Doyle, Ph.D.
Associate Professor
SEP-21-2007 FRI 11:03 TEL:9197336893 NAME:DWQ-WETLANDS P. 5