HomeMy WebLinkAbout20071841 Ver 6_More Info Received_20160318Burdette, Jennifer a
From:
Rebekah Reid <rebekah@cwenv.com>
Sent:
Friday, March 18, 2016 9:49 AM
To:
Burdette, Jennifer a
Subject:
Asheville Airport Southside
Attachments:
DSCN2605jpg; DSCN2603jpg
Jennifer,
The two culverts that are a part of the proposed double barrel crossing would be at the same
elevation. The existing double barrels are installed this way (see attached photos). We discussed the
elevation of the culverts on our side and the engineering team felt that one culvert would fill in over
time leaving primary/base flow to the other culvert. Installation would include burial for aquatic life
passage.
I discussed the culvert elevation and installations with David Brown and Zan around the first of
February prior to submitting the modification. Both agreed to leave design decisions regarding the
installation and elevations up to the engineering team. And, David agreed that one culvert would fill
in over time.
Thank you and please do not hesitate to contact me with any other questions.
Rebekah N. Reid
32 Clayton Street
Asheville, NC 28801
Office: 828-698-9800
Mobile: 828-606-6512
rebekah(7cwenv.com
Please consider the environment before printing this e-mail.
�, ow