Loading...
HomeMy WebLinkAbout20071445 Ver 1_Staff Comments_2007121907-1445 Wilmington Beach Street Improvements AML comments December 19, 2007 The 12/6/07 memo from S&EC states that: "The project area, as defined in the scope of the project in the initial application, is just the right-of--ways [sic] of the proposed roadway improvements." The project area is actually defined by the ACE. If the applicant can demonstrate that the ACE has defined the project as just the rights of way, then the DWQ will define the scope of the project consistently and require stormwater for only the rights of way.