No preview available
HomeMy WebLinkAboutNCC205934_NOT Closeout Documents_20241213 Engineering Department C� Greenville 1500 Beatty St.-PO Box 7207 "Iir NORTH CAROLINA Greenville, NC 27835-7207 Office:252.329.4467 ENGINEERING Engineering Department - Sedimentation/Erosion Control Program December 11, 2024 Letter of Final Inspection Re: Project Name: Sagewood Phase 5 Project Number: ESCP-2020-0045 County: Pitt Disturbed Acreage: 5.58 Responsible Party: BILL CLARK HOMES OF GREENVILLE LLC Dear Sir/Madam: At your request, this office has completed its final site inspection of the referenced project. We found the site stable and in compliance with the approved Sedimentation and Erosion Control Plan. Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been closed for this project and you will need to terminate your NCG01 permit. Please do not hesitate to call if you have any questions. Respectfully, Eric Fleming EN LD Engineering Assistant II Engineering Department City of Greenville efleming@greenvillenc.gov www.greenvillenc.gov (252) 329-4681 Engineering- 1500 Beatty Street- PO Box 7207-Greenville, NC 27835-7207-Office: 252.329.4467-greenvillenc.gov