Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC205934_NOT Closeout Documents_20241213 Engineering Department
C� Greenville 1500 Beatty St.-PO Box 7207
"Iir NORTH CAROLINA Greenville, NC 27835-7207
Office:252.329.4467
ENGINEERING
Engineering Department - Sedimentation/Erosion Control Program
December 11, 2024
Letter of Final Inspection
Re: Project Name: Sagewood Phase 5
Project Number: ESCP-2020-0045
County: Pitt
Disturbed Acreage: 5.58
Responsible Party: BILL CLARK HOMES OF GREENVILLE LLC
Dear Sir/Madam:
At your request, this office has completed its final site inspection of the referenced project. We found the
site stable and in compliance with the approved Sedimentation and Erosion Control Plan.
Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been closed for
this project and you will need to terminate your NCG01 permit.
Please do not hesitate to call if you have any questions.
Respectfully,
Eric Fleming
EN LD Engineering Assistant II
Engineering Department
City of Greenville
efleming@greenvillenc.gov
www.greenvillenc.gov
(252) 329-4681
Engineering- 1500 Beatty Street- PO Box 7207-Greenville, NC 27835-7207-Office: 252.329.4467-greenvillenc.gov