Loading...
HomeMy WebLinkAbout20160114 Ver 1_Approval Letter_20160224Water Resources ENVIRONMENTAL. QUALITY February 24, 2016 Heiko Meyer 7051 South Malaya Court , Aurora, Colorado 80016 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director DWR # 16-0114 McDowell County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION Sunset Point Owners Association - Lot #17 Dear Mr. Meyer: You have our approval for the impacts listed below for the purpose described in your application dated December 29, 2015, and received by the Division of Water Resources (Division) February 5, 2016, approval has been granted for the impacts listed in the table below. This approval requires you to follow the conditions listed, in the enclosed certification(s) or general permit and any additional conditions listed below. Project impacts are covered by the attached Water Quality General Certification Number 3898 and the conditions listed below. This certification is associated with the use of General Permit Number.30 issued by the U.S. Army Corps of Engineers. Please note that you should obtain or otherwise comply with any other federal, state or local permits before proceeding with your - project, including those required by (but not limited to) Erosion and Sediment Control, Water Supply Watershed and Trout Buffer regulations. IMPACTS APPROVED The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification, General Permit and/or Buffer Rules are meta No other impacts are approved, including incidentalimpacts. Type of Impact Amount Approved Permanent Open Waters Above Pool Below Pool 0.0218 (acres) 0.0103 (acres) State of North Carolina I Environmental Quality I Water Resources Asheville Regional Operations Center 2090 US 70 Highway, Swannanoa, North Carolina 28778 828/296-4500 Sunset Point Owners Association February 24, 2016 Page 2 of 3 ADDITIONAL CONDITIONS l 1. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee: If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s)/Permit/Authorization and is responsible for complying with all conditions. 2. The proposed project must comply with the McDowell County local riparian buffer ordinance approved by the Division of Water Resources under the Catawba River Basin: Protection and Maintenance of Existing Riparian Buffers, 15ANCAC 02B .0243(b). 3. Stabilization techniques must meet the General Conditions listed in the Shoreline Stabilization Technique Selection Process found in Duke Energy's Shoreline Management Guidelines for the Catawba-Wateree river system 2006 Shoreline Management Plan. This approval and its conditions are final and binding unless contested. 3 This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at.http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and_5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. _ Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc): +' Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 Sunset Point Owners Association February 24, 2016 Page 3 of 3 One (1) copy of the petition must also be served to DEQ: Sam M. Hayes, General Counsel Department of Environmental Quality. 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Act as described in 15A NCAC 02H .0500. Please contact Ed Williams at 828-296-4686 or ed.williams@ncdenr.gov if you have any, questions or concerns. Sincerely, G. Landon Davidson, P.G., Regional Supervisor Water Quality Regional Operations Asheville Regional Office cc: Cathleen Atkins — CUPM, LLC (via email) William Elliot- USACE Asheville Regulatory Field Office (via email) Wade Harmon —Duke Energy Ron Harmon — McDowell County Planning DWR ARO 401 files DWR 401 and Buffer Permitting Unit G:\WR\WQ\McDowell\401 s\Non-DOT\APRVL401 SunsetPointHomeownersAssociation_Lot 17.02-23-2016.docx I