March 10, 2022
Kenneth Waldroup, Executive Director
Cape Fear Public Utility Authority
235 Government Center Drive
Wilmington NC 28403
Subj ect: Letter of Intent to Fund
Northern Regional Pump Stations and
Force Main Improvements
American Rescue Plan-Earmark
Project No.: SRP-W-ARP-0062
Dear Mr. Waldroup:
The Division of Water Infrastructure has reviewed your Request for Funding, and
determined your project is eligible to receive American Rescue Plan (ARP) funding from the
State Fiscal Recovery Fund established in S.L. 2021-180. Projects funded from the State Fiscal
Recovery Fund must meet applicable federal law and guidance for the ARP funds. The ARP
Project Grant will be one hundred percent of eligible project costs up to a maximum of
$30,000,000.
The first milestone is the submittal of a Bid and Design Package by August 1, 2022.
Please note that this intent to fund is contingent on meeting all of the following milestones:
Milestone Date
Apply for all Necessary Permits` ASAP
Bid and Design Package Submittal obtain allpermits) August 1, 2022
Bid and Design Package Approval December 1, 2022
Advertise Project, Receive Bids, Submit Bid Information, April 3, 2023
and Receive Authority To Award
Execute Construction Contracts May 1, 2023
Receive last reimbursement- Statutory December 31, 2026
*An engineering alternatives analysis (EAA) may be required on certain projects.
Failure to meet any milestone may result in the forfeiture of funding for the proposed
project.
Note that the Division will make no reimbursements of ARP funds after December 31,2026
D E Q� North Carolina Department of Environmental Quality I Division of Water Infrastructure
512 N.Salisbury Street 1 1633 Mail Service Center I Raleigh,North Carolina 27699-1633
NORTH CAROLINA
o.Panm.MorEnm--miousiN / 919.707.9160
Kenneth Waldroup, Executive Director
March 10, 2022
Page 2 of 2
The State Environmental Policy Act exempts projects funded by the State Reserve (such
as this project) from state-mandated environmental review. Federal requirements may still apply.
[NCGS 113A-12(2)h.]
Upon detailed review of the project during the funding process, it may be determined that
portions of your project are not eligible for funding.
US Treasury Requirements
Projects with an expected total cost of ten million dollars or more must meet US Treasury
requirements for prevailing wage rates, project labor agreements, and related requirements.
Recipients can either certify meeting the requirements or provide plans and reports as the SLFRF
Compliance and Reporting Guidance (treasury.gov) specifies.
If you have any questions, please contact Ishwar Devkota, by phone at(919) 707-9192 or
by email at Ishwar.devkota@ncdenr.gov.
Sincerely,
9&;� /��
Jon Risgaard, Chief
State Revolving Fund Section
CC: Carel Vandermeyden, Cape Fear Utility Authority, Wilmington
Ken Pohlig,PE (DWI,via email)
Ishwar Devkota(DWI,via email)
Mark Hubbard, PE (DWI, via email)
ARP Project File (COM LOIF)