Loading...
HomeMy WebLinkAboutSWG040149_(ARPA) DWI Letter of Intent to Fund_20220310 STATE�Fti MpY o.1- 0 ROY COOPER Governor ELIZABETH S.BISER Secretary *FA'f Qup.+NaE"'* SHADI ESKAF NORTH CAROLINA Director Environmental Quality March 10, 2022 Kenneth Waldroup, Executive Director Cape Fear Public Utility Authority 235 Government Center Drive Wilmington NC 28403 Subj ect: Letter of Intent to Fund Northern Regional Pump Stations and Force Main Improvements American Rescue Plan-Earmark Project No.: SRP-W-ARP-0062 Dear Mr. Waldroup: The Division of Water Infrastructure has reviewed your Request for Funding, and determined your project is eligible to receive American Rescue Plan (ARP) funding from the State Fiscal Recovery Fund established in S.L. 2021-180. Projects funded from the State Fiscal Recovery Fund must meet applicable federal law and guidance for the ARP funds. The ARP Project Grant will be one hundred percent of eligible project costs up to a maximum of $30,000,000. The first milestone is the submittal of a Bid and Design Package by August 1, 2022. Please note that this intent to fund is contingent on meeting all of the following milestones: Milestone Date Apply for all Necessary Permits` ASAP Bid and Design Package Submittal obtain allpermits) August 1, 2022 Bid and Design Package Approval December 1, 2022 Advertise Project, Receive Bids, Submit Bid Information, April 3, 2023 and Receive Authority To Award Execute Construction Contracts May 1, 2023 Receive last reimbursement- Statutory December 31, 2026 *An engineering alternatives analysis (EAA) may be required on certain projects. Failure to meet any milestone may result in the forfeiture of funding for the proposed project. Note that the Division will make no reimbursements of ARP funds after December 31,2026 D E Q� North Carolina Department of Environmental Quality I Division of Water Infrastructure 512 N.Salisbury Street 1 1633 Mail Service Center I Raleigh,North Carolina 27699-1633 NORTH CAROLINA o.Panm.MorEnm--miousiN / 919.707.9160 Kenneth Waldroup, Executive Director March 10, 2022 Page 2 of 2 The State Environmental Policy Act exempts projects funded by the State Reserve (such as this project) from state-mandated environmental review. Federal requirements may still apply. [NCGS 113A-12(2)h.] Upon detailed review of the project during the funding process, it may be determined that portions of your project are not eligible for funding. US Treasury Requirements Projects with an expected total cost of ten million dollars or more must meet US Treasury requirements for prevailing wage rates, project labor agreements, and related requirements. Recipients can either certify meeting the requirements or provide plans and reports as the SLFRF Compliance and Reporting Guidance (treasury.gov) specifies. If you have any questions, please contact Ishwar Devkota, by phone at(919) 707-9192 or by email at Ishwar.devkota@ncdenr.gov. Sincerely, 9&;� /�� Jon Risgaard, Chief State Revolving Fund Section CC: Carel Vandermeyden, Cape Fear Utility Authority, Wilmington Ken Pohlig,PE (DWI,via email) Ishwar Devkota(DWI,via email) Mark Hubbard, PE (DWI, via email) ARP Project File (COM LOIF)