Loading...
HomeMy WebLinkAboutSW3241002_Calculations_20241118 { III... - ,j11111 jak 11/44\ y am'• - - ----r _ o -4- . � -' rl — -4mo .„� - _ mot• ti L l— _� ~ '**"..'•...............2%.: gib Shelby Rucker Stormwater Impact Analysis and Final Design of Stormwater Management Facility a MCADAMS Shelby Rucker The City of Shelby, North Carolina Stormwater Impact Analysis & Design of Stormwater Control Measures Project Number: TRU-23006 Designed By: Liam McNally, El Checked By: Stuart Woodard, PE Date: June 2024 ***�%uau'' '''' �N CAR°< 0;1' SS/O'o y'�: ti • Q r: 6 9 •R. VANC;oss MC A DA M S 2024.07.01 15:34:13-04'00' 2100 South Tryon Street, Suite 400 Charlotte, North Carolina 28203 NC Lic. #C-0293 �la MCADAMS STORMWATER IMPACT ANALYSIS GENERAL DESCRIPTION Located in the City of Shelby, North Carolina, is the proposed development known as Shelby Rucker. The existing site is wooded and has some farmed land. Proposed development on this site will consist of the construction of single-family homes, along with the associated roads, sidewalks, utilities, and three stormwater control measures. The proposed development is located within the Broad River basin with stormwater runoff from the proposed development draining into a unnamed tributary of Buffalo Creek and ultimately into the Broad River. The proposed stormwater management on this site shall meet the stormwater management performance standards for development set forth in the City of Shelby Code of Ordinances. These are as follows: City of Shelby Code of Ordinances xx-302 DEVELOPMENT STANDARDS FOR LOW-DENSITY PROJECTS (A) Low-density projects shall comply with each of the following standards: Stormwater runoff from the development shall be designed to maximize dispersed flow through vegetated areas and minimize channelization of flow; (B) Stormwater that cannot be released as dispersed flow shall be transported from the development by vegetated conveyances as outlined in 15A NCAC 02H.1003(2)(c); (C) The project may use curb and gutter with outlets to convey stormwater to grassed swales or vegetated areas. Requirements for curb outlet systems are outlined in 15A NCAC 02H.1003(2)(d); (D) All built-upon area shall be at a minimum of 30 feet landward of all perennial and intermittent surface waters. A perennial or intermittent surface water shall be deemed present if the feature is approximately shown on either the most recent version of the soil survey map prepared by the Natural Resources Conservation Service of the United States Department of Agriculture (USDA) or the most recent version of the 1:24,000 scale (7.5 minute) quadrangle topographic maps prepared by the United States Geologic Survey (USGS). An exception to this requirement may be allowed when surface waters are not present in accordance with the provisions of 15A NCAC 2B .0233 (3)(a) or similar site-specific determination made using Division-approved methodology; (E) The approval of the stormwater permit shall require an enforceable restriction on property usage that runs with the land, such as a recorded deed restriction or protective covenants, to ensure that future development and redevelopment maintains the site consistent with the approved project plans. City of Shelby Code of Ordinances xx-303 DEVELOPMENT STANDARDS FOR HIGH-DENSITY PROJECTS High-density projects shall implement stormwater control measures that comply with each of the following standards: creating experiences through experience 2100 South Tryon Street,Suite 400,Charlotte,NC 28203/704.527.0800 MCADAMS STORMWATER IMPACT ANALYSIS (A) The measures shall control and treat runoff from the first inch of rain. Runoff volume drawdown time shall be pursuant to standards specific to each practice as provided in the Design Manual; (B) The measures shall discharge the storage volume at a rate equal to or less than the pre- development discharge rate for the one-year, 24-hour storm; (C) Stormwater Control Measures (SCMs) shall be designed, constructed, and maintained so that the project achieves either "runoff treatment" or "runoff volume match" as defined in the Design Manual; 19 (D) General engineering design criteria for all projects shall be in accordance with 15A NCAC 02H .1003(3), as explained in the Design Manual; (E) All built-upon area shall be at a minimum of 30 feet landward of all perennial and intermittent surface waters. A surface water shall be deemed present if the feature is approximately shown on either the most recent version of the soil survey map prepared by the Natural Resources Conservation Service of the United States Department of Agriculture (USDA) or the most recent version of the 1:24,000 scale (7.5 minute) quadrangle topographic maps prepared by the United States Geologic Survey (USGS). An exception to this requirement may be allowed when surface waters are not present in accordance with the provisions of 15A NCAC 2B .0233 (3)(a) or similar site-specific determination made using Division-approved methodology; (F) The approval of the stormwater permit shall require an enforceable restriction on property usage that runs with the land, such as recorded deed restrictions or protective covenants, to ensure that future development and redevelopment maintains the site consistent with the approved project plans. To meet the above City of Shelby requirements, Three wet ponds are proposed to treat the first inch of rainfall and control the 1 year, 24-hour storm peak runoff rates to their pre-development condition. Please refer to the appropriate section of this report for additional information. CALCULATION METHODOLOGY > Rainfall data for the analysis was taken from the most current data available from the National Oceanic and Atmospheric(NOAA) Precipitation Frequency Data Server website. > Using maps contained within the USDA Web Soil Survey, the on-site soils were determined to be hydrologic soil groups (HSG) 'B', 'C' and 'D' soils. Since the method chosen to compute post- development peak flow rates and runoff volumes is dependent upon the soil type, care was taken when selecting the appropriate Soil Conservation Service Curve Number (SCS CN). A composite SCS CN was computed for each pre-and post-development sub-basin. > A composite SCS Curve Number was calculated for both the pre- and post-development condition for each sub-basin using SCS curve numbers and land cover conditions. Land cover conditions for creating experiences through experience 2 of 3 la MCADAMS STORMWATER IMPACT ANALYSIS the pre-development condition were taken from available survey and GIS information. Land cover conditions for the post-development condition were taken from the proposed development plan. > The time of concentration was calculated using SCS TR-55 (Segmental Approach, 1986). The Tc flow path was divided into three segments: overland flow, concentrated flow, and channel flow. The travel time was then computed for each segment, from which the overall time of concentration was determine by taking the sum of each segmental time. > PondPack Version V8i was used in determined the pre- & post-development peak flow rates for the 1-, and 100-year storm events, as well as routing calculations for the proposed stormwater control measure. > The proposed stormwater control measure was designed in accordance with the Minimum Design Criteria (MDC) standards set forth in the NCDEQStormwater Design Manual. DISCUSSION OF RESULTS Peak Runoff Control Requirements: The proposed project will result in a significant increase in peak flow rates to downstream properties. To mitigate these impacts, the proposed stormwater control measures have been sized such that post- development peak flow rates are no greater than pre-development levels in the 1-year 24 hr storm event on site. Water Quality Requirements: The proposed facility has been designed in accordance with the Minimum Design Criteria (MDC) standards set forth in the NCDEQ Stormwater Design Manual. The proposed facility will provide the required 85%TSS removal. CONCLUSION If the development on this tract is built as proposed within this report, then the requirements set forth in the City of Shelby's Code of Ordinances will be met. However, modifications to the proposed development may require that this analysis be revised. Some modifications that would require this analysis to be revised include: > The proposed site impervious surface exceeds the amount accounted for in this report. > The post-development watershed breaks change significantly from those used to prepare this report. The above modifications may result in the assumptions within this report becoming invalid. The computations within this report will need to be revisited if any of the above conditions become apparent as development of the proposed site moves forward. creating experiences through experience 3 of 3 1 1 SUMMARY OF RESULTS 2 MISCELLANEOUS SITE INFORMATION 3 WATERSHED SOILS INFORMATION 4 SITE PRECIPITATION DATA 5 PRE-DEVELOPMENT HYDROLOGIC CALCULATIONS 6 POST-DEVELOPMENT HYDROLOGIC CALCULATIONS 7 STORMWATER CONTROL MEASURE A DESIGN CALCULATIONS 8 STORMWATER CONTROL MEASURE B DESIGN CALCULATIONS 9 STORMWATER CONTROL MEASURE C DESIGN CALCULATIONS SUMMARY OF RESULTS Shelby Rucker TRU-23006 'la MCADAMS SUMMARY OF RESULTS Project Name: Shelby Rucker Date: 6/5/2024 Project Number: TRU-23006 Calculated By: L.McNally,El RELEASE RATE MANAGEMENT RESULTS POINT OF ANALYSIS#1 Pre-Dev Post-Dev Return Period [cfs] [cfs] %Increase 1-Year 24 hr 2.78 2.69 -3% POINT OF ANALYSIS#2 Pre-Dev Post-Dev Return Period [cfs] [cfs] %Increase 1-Year 24 hr 4.10 3.94 -4% POINT OF ANALYSIS#3 I Pre-Dev Post-Dev Return Period [cfs] [cfs] %Increase 1-Year 24 hr 1.59 0.41 -74% POINT OF ANALYSIS#4 I Pre-Dev Post-Dev Return Period [cfs] [cfs] %Increase 1-Year 24 hr 0.23 0.08 -65% �� MCADAMS SUMMARY OF RESULTS Project Name: Shelby Rucker Date: 6/5/2024 Project Number: TRU-23006 Calculated By: L.McNally,El STORMWATER CONTROL MEASURE'A'DETENTION SUMMARY Design Drainage Area= 15.06 acres Design Impervious Area= 6.35 acres %Impervious= 42.2% Water Quality Volume= 31,099 cf Top of Dam= 760.00 ft Riser= 4x4 ft(inside dimension) Riser Elevation= 831.30 ft WQv Orifice Diameter= 2.00 in WQv Orifice Invert Elevation= 827.00 ft Barrel Diameter= 24 in Invert In= 826.90 ft Invert Out= 826.00 ft Length= 50.0 ft %Slope= 1.80% STORMWATER CONTROL MEASURE'A'ROUTING RESULTS Inflow Outflow Max WSE Freeboard Return Period [cfs] [cfs] [ft] [ft] WQV - - 827.91 -67.91 1-Year 28.23 0.15 829.08 -69.08 10-Year 67.84 1.63 831.37 -71.37 25-Year 83.56 4.06 831.48 -71.48 100-Year 107.13 26.85 831.97 -71.97 �� MCADAMS SUMMARY OF RESULTS Project Name: Shelby Rucker Date: 6/5/2024 Project Number: TRU-23006 Calculated By: L.McNally,El STORMWATER CONTROL MEASURE'B'DETENTION SUMMARY Design Drainage Area= 18.87 acres Design Impervious Area= 8.57 acres %Impervious= 45.4% Water Quality Volume= 30,431 cf Top of Dam= 720.00 ft Riser= 4x4 ft(inside dimension) Riser Elevation= 876.40 ft WQv Orifice Diameter= 2.00 in WQv Orifice Invert Elevation= 714.00 ft Barrel Diameter= 30 in Invert In= 872.90 ft Invert Out= 871.90 ft Length= 100.0 ft %Slope= 1.00% STORMWATER CONTROL MEASURE'B'ROUTING RESULTS Inflow Outflow Max WSE Freeboard Return Period [cfs] [cfs] [ft] [ft] WQV - - 874.43 -154.43 1-Year 37.46 0.19 876.34 -156.34 10-Year 87.68 21.85 876.99 -156.99 25-Year 107.36 45.79 877.48 -157.48 100-Year 136.78 54.41 878.50 -158.50 . MISCELLANEOUS SITE INFORMATION Shelby Rucker TRU-23006 ti K .. t.' '• r ., . ..•dir -illtilrk: - � ' , p °ae. Gar 1 • • �d Nr. rik A\ .. V .. alk •kfc.:c. ' b 4, . .. 0.4 .-.1... ..- - ' w v •1 �' 4 II t'ti `t f f I ' . "• R .iiet ' -: ' _: • • Ilit k. i• •••CL3) *. .' 1 r 's Njiti*k;..147A it'41,4 :41'.' , -i 7 1„ : . r„ .• ,"1.00. • �all� ► „ram ti� ,„,;__i,,y,'N.-2i!../..•,,.--e1,1--..:.,...-_'_.;,:-,.-...,7.e:„.„.,..,,:-:.„...,-'_'_'.,.,-..-, ..... .'...-__\_,_._. _ , . s• .. - y` >w ., .h°,, s, ` '. SITE N)i t' -_k.1- 1•.i1r0."o46„i4.r_.,l __• 4i'f •4. 11‘0.....,--,A- :....,i„t •. '1It-1...1•4,1•:w,i.,.'.t..tkv"h..•.)...... .,i'NiN.r.•.p••.,,..i.-.1:•P,:'.. • fRa t ' " r �k1r . �- a . ; �� • r Ir k.'. n�`' / ,1 4. .,ram. i`rl.4'!� >�_--. L- �, t. 1, . 3 �•,�� . .t,. � .�=tea.rY ••` • i R'� - - - _� i -. _. 99/ �. 1., �' r �-� .,`';. '� ir ;erg • _-- S`Iva p ; �. a� f f` , F,;' i \ 4 ri � - tr '`ti CI o '• a ' Olt �C Cce1A,MQxar,E.rrb Corr ey i h iviap.6 stnC MitOrrs3N 4e off HOG-lh r N. + Cullliina DOolt E.goo Toeaorr i ,Saba:, r. rho�co7ac hatI os-ow,Onic�o _,003244t. ' . SHELBY RUCKER liii N SITE AERIAL MAP 0 345 690 1,380 PROJECT #: TRU-23006 Feet SHELBY, NORTH CAROLINA MCADAMS MOOSE DR '1 • 00S 0090 QQ��SQO 9c.- I. 00 iO C4 BUCKER RO 0,9 PO �\\5 1- cs 3 9 O Z vs 7NR%F,430 7 O Q Q % O`er SY_t_VA DR 4_ � ti `P� tiOFf 74 •c' O 0 C�,"'Pc- F0'- 6,1 Q '',IEYSGS The Nationa.l%,�p Nalioiail,Boundaries Dataset,3DEP Elevation PkS' Program,Geographic NaTrOes j7f motion System, National Hydrography frn 4' 4‘ Dataset, National Land Cover Database;-National Structures Dataset,and Lr`` National Transportation Dataset;USGS Global Ecosystems;U.S.Census Bureau TIGER/Line data;USFS Road data;Natural Earth Data;U.S. Department of State HIU;NOAA National Centers for Environmental sy4n o Information SHEBLY RUCKER[ - al SITE TOPO MAP 0 345 690 1,380 PROJECT #: TRU-23006 Feet SHELBY, NORTH CAROLINA MCADAMS National Flood Hazard Layer FIRMette $ FEMA Legend_ 81°28'31"W 35°16'34"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT • • c, • - ' Without Base Flood Elevation(BFE) Zone 4,V.A99 �; 692•FEET With BFE or Depth Zone AE,AO,AH,VE,AR SPECIAL FLOOD .0 •� 691 3 FEET HAZARD AREAS Regulatory Floodway • • • r . _ 691 FEET 0.2%Annual Chance Flood Hazard,Areas of 1%annual chance flood with average • 690 FEET, depth less than one foot or with drainage .- r • areas of less than one square mile zone x • .1 , Future Conditions 1%Annual ' L ' ,ANA � ` 689 FEET' Chance Flood Hazard zonex �� 6�Q FFET �" Area with See educedoFlood Risk due to OTHER AREAS OF jii I � 1C2:42157 1 © FLOOD HAZARD �� Area with Flood Risk due to Leveezone D 4110 - . a� iieele \. • FE� NO SCREEN Area of Minimal Flood Hazard zonex �1 'f►r y Effective LOMRs • I ` lone�� OTHER AREAS Area of Undetermined Flood Hazard Zone 5(686.5 fE�fFJ/.� - Channel,Culvert,or Storm Sewer CITY OF SHELBY ..),— cost STRUCTURES III 1 1 1 1 Levee,Dike,or Floodwall 370064 I 684 F I O 20.2 Cross Sections with 1%Annual Chance ,' 683E�r ® 1Z•s Water Surface Elevation • .p t rY CLEVELAND COUNTY 682r7 FEET 8- - - Coastal Transect • 370302 •^ 513•---- Base Flood Elevation Line(BFE) • AREA OF MINIMAL FLOOD H .' . kb Limit of Study 'a Zone 682 FEET Jurisdiction Boundary �' • �' - - - — Coastal Transect Baseline ,)I ,' I I I \Al��� OTHER - Profile Baseline r' •► FEATURES ��[/ \ ID Hydrographic Feature •,. �_c �(G�li� Digital Data Available N ' «66 0 � � No Digital Data Available 6��1 ��� MAP PANELS Unmapped _ `�`, 1 �%F G\ V ! 6 Fss� 9 The pin displayed on the map is an approximate 611 point selected by the user and does not represent 616����� an authoritative property location. * �O� This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. r N. The basemap shown complies with FEMA's basemap accuracy standards ^a' The flood hazard information is derived directly from the �^ ! rtp authoritative NFHL web services provided by FEMA.This map 1114111r... • was exported on 6/5/2024 at 12:43 PM and does not :o— reflect changes or amendments subsequent to this date and time.The NFHL and effective information may change or become superseded by new data over time. .` This map image is void if the one or more of the following map f elements do not appear:basemap imagery,flood zone labels, 10 i legend,scale bar,map creation date,community identifiers, 81°27'53"W 35°16'4"N FIRM panel number,and FIRM effective date.Map images for Feet 1.6 00ounmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 regulatory purposes. Basemap Imagery Source:USGS National Map 2023 NC DENR-DIVISON OF WATER RESOURCES 2B .0300 . 0306 BROAD RIVER BASIN Name of Stream Description Class Class Date Index No. Little Creek From source to Brushy Creek C 09/01/74 9-50-29-4 Hickory Creek From source to First Broad River C 07/01/73 9-50-30 Beams Lake Entire lake and connecting stream to C 07/01/73 9-50-30-1 Hickory Creek Little Hickory Creek From source to Hickory Creek C 07/01/73 9-50-30-2 Sulphur Springs Branch (Little From source to Hickory Creek C 09/01/74 9-50-30-3 Hickory Creek) Logan Branch From source to Sulphur Springs C 09/01/74 9-50-30-3-1 Branch Shoal Creek From source to First Broad River C 09/01/74 9-50-31 Bear Creek From source to Shoal Creek C 09/01/74 9-50-31-1 Beaverdam Creek From source to First Broad River C 09/01/74 9-50-32 Overflow Branch From source to Beaverdam Creek C 09/01/74 9-50-32-1 Swainsville Creek From source to Beaverdam Creek C 09/01/74 9-50-32-2 Sugar Branch From source to Beaverdam Creek C 09/01/74 9-50-32-3 Poplar Branch From source to Beaverdam Creek C 09/01/74 9-50-32-4 Hawkins Branch From source to Beaverdam Creek C 09/01/74 9-50-32-5 Yancey Branch From source to Broad River C 02/01/86 9-50-33 Diller Branch From source to Broad River C 08/03/92 9-51 Boween River From source to North Carolina-South C 03/01/63 9-52 Carolina State Line Wylies Creek From source to North Carolina-South C 08/03/92 9-52-1 Carolina State Line Little Creek From source to Buffalo Creek WS-III 08/03/92 9-53-1.3 Glenn Creek From source to Little Creek WS-III 08/03/92 9-53-1.3-1 Little Buffalo Creek From source to Buffalo Creek WS-III 08/03/92 9-53-2 Long Branch From source to Buffalo Creek WS-III 08/03/92 9-53-2.3 Suck Creek From source to Buffalo Creek WS-III 08/03/92 9-53-2.7 Buffalo Creek(Kings Mountain From a point 0.3 mile upstream of WS-III;CA 08/03/92 9-53-(2.9) Reservoir) Long Creek to dam at Kings Mountain Reservoir, Buffalo Creek Long Creek From source to a point 0.3 mile WS-III 08/03/92 9-53-3-(1) upstream of mouth Long Creek From a point 0.3 mile upstream of WS-III;CA 08/03/92 9-53-3-(2) mouth to Buffalo Creek Whiteoak Creek From source to a point 0.7 mile WS-III 08/03/92 9-53-4-(1) upstream of mouth Whiteoak Creek From a point 0.7 mile upstream of WS-III;CA 08/03/92 9-53-4-(2) mouth to Kings Mountain Reservoir, Buffalo Creek Buffalo Creek From dam at Kings Mountain C 08/03/92 9-53-(5) Reservoir to North Carolina-South Carolina State Line Muddy Fork From source to Buffalo Creek C 09/01/74 9-53-6 13 WATERSHED SOILS INFORMATION Shelby Rucker TRU-23006 3 Hydrologic Soil Group—Cleveland County, North Carolina (SUB1) W . 456690 456740 456790 456840 456890 456940 456990 457040 46/090 457140 35°16'31"N 35°16'31"N .. .,-'%141/4"..11,11.04adlimmuisibmialps... ' 1 • 1 ,• .. ,,,,N,; p , .ail •� / til ki•• ` � ' �L^ ,a, ig° 1 • or �! ^ Yam. . itillij 44.. ,, ' ' Y'ryi. CaB2 IF ' , 41, PtD & — J , ' _ PsC2 . s A' ‘4N A- 4 , 8 � + � ' ,, ,,,. S , c7 . iris ix f000 dap nua h eaDoc7 aP o R11'° _ . p`, 4 " J 35°16'21"N - I 35°16'21"N 456690 456740 456790 456840 456890 456940 456990 457040 464590 457140 3 3 NMap Scale:1:2,240 if printed on A landscape(11"x 8.5")sheet. Meters a N 0 30 60 120 180 a Feet 0 100 200 m 400 600 Map projection:Web Mercator Coer coordinates:WG584 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Cleveland County, North Carolina (SUB1) MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 CID Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways n CID US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as .v B/D of the version date(s)listed below. • r C Soil Survey Area: Cleveland County, North Carolina Survey Area Data: Version 27,Sep 13,2023 • • CID Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Apr 22,2022—May Soil Rating Points 10,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Cleveland County,North Carolina SUB1 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CaB2 Cecil sandy clay loam,2 B 7.8 57.0% to 8 percent slopes, moderately eroded PsC2 Pacolet-Saw complex,8 B 4.6 33.3% to 15 percent slopes, moderately eroded PtD Pacolet-Saw complex, B 1.3 9.6% 15 to 25 percent slopes,stony Totals for Area of Interest 13.7 100.0% USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Cleveland County, North Carolina SUB1 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 4 of 4 3 Hydrologic Soil Group—Cleveland County, North Carolina N (SUB 2) to N W 457000 457040 457080 457120 457160 457200 457240 45725) 457320 457360 35°16'27'N 35°16'27'N ;11f• \ r t .1 "x' \ • • • Iiila ikift ""' • ' ' ..' ;ilic 4"...9 1 .. A ..4". ' r �1. r 4 . MID CaB2 PsC�2 • .� ss .} Ali �. •71•f j: ' ' }r. pio • , t A '• .41 X0n1 GIRT,nia�r3ot1 I5:. ea0oc7 aR�IGo3 oiga1Q° •. .. . , 35°16'19"N 1 35°16'19"N 457000 457040 457080 457120 457160 45iu0 457240 457280 457320 457360 3 3 N to Map Scale:1:1,810 if printed on A landscape(11"x 8.5")sheet. N Meters o, N 0 25 50 100 150 ° Feet 0 50 100 200 300 Map projedion:Web Mercator Corner coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 5/30/2024 -041-0 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Cleveland County, North Carolina (SUB 2) MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 C/D Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as .v B/D of the version date(s)listed below. • r C Soil Survey Area: Cleveland County, North Carolina Survey Area Data: Version 27,Sep 13,2023 • • C/D Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Apr 22,2022—May Soil Rating Points 10,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Cleveland County,North Carolina SUB 2 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CaB2 Cecil sandy clay loam,2 B 0.1 1.3% to 8 percent slopes, moderately eroded PsC2 Pacolet-Saw complex,8 B 3.6 48.4% to 15 percent slopes, moderately eroded PtD Pacolet-Saw complex, B 3.8 50.3% 15 to 25 percent slopes,stony Totals for Area of Interest 7.5 100.0% USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Cleveland County, North Carolina SUB 2 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 4 of 4 a Hydrologic Soil Group—Cleveland County, North Carolina a N (SUB 3) 456740 456820 456900 456980 457060 457140 45 z4b 4b/au0 457380 457460 35°16'27'N 1 1 35°16'27'N ' Y• . .M.". f r _ 4 ,','': ' i T 1 Al V..' ,+ a if}'.S;... ,,, .14 �, 1 , .. , .... ..<\._,' (i);-/ _, . , Lr'l7 ul trChXS ,,,,,, ..., .- 1 ly 'r M <t�.,. .44,�.tp� 8 kit �>>00 Galap`nilaf DIotP Vic. _III-1-' 11},telB5 ,1',�a0.N° 'r> h .. .. ,., __ 35°16'11"N 1 35°16'11"N 456740 456820 456900 456980 457060 457140 457220 45/3W 457380 457460 3 3 in in Map Scale:1:3,420 if printed on A landscape(11"x 8.5")sheet. N Meters o, N1 0 50 100 200 300 Feet 0 150 300 oo 600 900 Map projection:Web Mercator Comerordinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Cleveland County, North Carolina (SUB 3) MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 CID Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as .v B/D of the version date(s)listed below. • r C Soil Survey Area: Cleveland County, North Carolina Survey Area Data: Version 27,Sep 13,2023 • • CID Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Apr 22,2022—May Soil Rating Points 10,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Cleveland County,North Carolina SUB 3 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CaB2 Cecil sandy clay loam,2 B 7.4 36.1% to 8 percent slopes, moderately eroded PsC2 Pacolet-Saw complex,8 B 6.8 33.0% to 15 percent slopes, moderately eroded PtD Pacolet-Saw complex, B 6.4 31.0% 15 to 25 percent slopes,stony Totals for Area of Interest 20.6 100.0% USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Cleveland County, North Carolina SUB 3 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 4 of 4 3 Hydrologic Soil Group—Cleveland County, North Carolina a (SUB 4) 7 0, 457090 457120 457150 457180 457210 457240 45r2N 457300 457330 457360 457380 457420 35°16'16"N 35°16'16"N 1 Ille CaB2 g q i Ps0-2 I . 0 i ? i M .' r I . . . . . 4,if . • ,,,,x,..„. •,.. .,, • ... .. . . . a `; ,, _ PsB2 •Sh 'ono G ap uu-a-,,n _ -ilkl 0V') c�auc�° 35°16'8"N I P' 35°16'8"N 457090 457120 457150 457180 457210 457240 4512I0 457300 457330 457360 457390 457420 3 3 ro v Map Scale:1:1,620 if printed on A landscape(11"x 8.5")sheet. N Meters a N 0 20 40 80 120 ° Feet 0 50 100 Z00 300 Map projection:Web Men m abOr Coer 000rdinatPs:WG584 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Cleveland County, North Carolina (SUB 4) MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 CID Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as .v B/D of the version date(s)listed below. • r C Soil Survey Area: Cleveland County, North Carolina Survey Area Data: Version 27,Sep 13,2023 • • CID Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Apr 22,2022—May Soil Rating Points 10,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Cleveland County,North Carolina SUB 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CaB2 Cecil sandy clay loam,2 B 0.2 2.8% to 8 percent slopes, moderately eroded PsB2 Pacolet-Saw complex,2 B 1.0 12.0% to 8 percent slopes, moderately eroded PsC2 Pacolet-Saw complex,8 B 4.9 61.8% to 15 percent slopes, moderately eroded PtD Pacolet-Saw complex, B 1.9 23.5% 15 to 25 percent slopes,stony Totals for Area of Interest 8.0 100.0% USDA Natural Resources Web Soil Survey 5/30/2024 1111-1. Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Cleveland County, North Carolina SUB 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 4 of 4 Hydrologic Soil Group—Cleveland County, North Carolina (SUB 5) N N N W W 456500 456600 456700 456800 45E800 457000 457100 45rau0 4bia3 457400 457500 35°16'21"N 35°16'21"N r 1 ,d 1 .•A . 4 2 I fit , i PitD' At_47.A av* - Ps B2 • AO PsC2 Thr' ApB - fChA a � 4.R j CaB2 NQ 1. ! • s �_ r <. �. a' `• ,��.Q . t't !' PaC2 f Soil 'a0� r. bTA i0oc7al2thif�ink— I { 4 J` Y. 35°15'56"N •"' I•'"' — • I •* ��� -- 35°15'56"N 456500 456600 456700 456800 45E800 45/000 457100 45r.eu0 40iaA 457403 457500 En 3 3 .i Map Scale:1:5,340 if printed on A landscape(11"x 8.5")sheet. N Meters o, N 0 50 100 200 300 Feet 0 250 500 1000 1500 Map projection:Web Mercator Corner coordinates:WG584 Edge tics:UTM Zone 17N WGSS84 USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Cleveland County, North Carolina (SUB 5) MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 CID Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as .v B/D of the version date(s)listed below. • r C Soil Survey Area: Cleveland County, North Carolina Survey Area Data: Version 27,Sep 13,2023 • • CID Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Apr 22,2022—May Soil Rating Points 10,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Cleveland County,North Carolina SUB 5 Hydrologic Soil Group • Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ApB Appling sandy loam, 1 to B 6.0 12.9% 6 percent slopes CaB2 Cecil sandy clay loam,2 B 3.5 7.6% to 8 percent slopes, moderately eroded ChA Chewacla loam,0 to 2 B/D 4.4 9.4% percent slopes, frequently flooded PaC2 Pacolet sandy clay B 3.1 6.6% loam,8 to 15 percent slopes,moderately eroded PaD2 Pacolet sandy clay C 6.0 12.9% loam, 15 to 25 percent slopes,moderately eroded PsB2 Pacolet-Saw complex,2 B 0.7 1.5% to 8 percent slopes, moderately eroded PsC2 Pacolet-Saw complex,8 B 12.3 26.4% to 15 percent slopes, moderately eroded PtD Pacolet-Saw complex, B 10.6 22.8% 15 to 25 percent slopes,stony Totals for Area of Interest 46.6 100.0% USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Cleveland County, North Carolina SUB 5 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 5/30/2024 Conservation Service National Cooperative Soil Survey Page 4 of 4 PRECIPITATION DATA Shelby Rucker TRU-23006 2/22/24, 10:11 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 �'°`°�,,, Location name:Shelby,North Carolina, USA* � ''* Latitude:35.2788°, Longitude:-81.5012° E nonn N. Elevation: 895 ft** I °A.fi"" *source:ESRI Maps " # � `g O"" **source:USGS `' POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration - - 1 2 5 10 25 50 100 200 500 1000 5-min 0.400 I 0.474 0.557 0.622 0.702 0.761 0.820 0.879 0.954 1.01 (0.365-0.438) (0.433-0.519) (0.508-0.610) (0.565-0.680) (0.635-0.767) (0.684-0.832) (0.735-0.898) (0.781-0.963) (0.840-1.05) (0.884-1.12) 10-min 0.639 0.757 0.893 0.995 1.12 I 1.21 1.30 1.39 1.51 1.60 (0.584-0.700)](0.693-0.829) (0.814-0.977) (0.904-1.09) (1.01-1.22) I (1.09-1.32) (1.17-1.43) (1.24-1.53) (1.33-1.66) (1.39-1.76) 15-min 0.799 0.952 1.13 1.26 1.42 1.53 1.65 1.76 I 1.90 2.00 (0.729-0.875) (0.871-1.04) (1.03-1.24) (1.14-1.38) (1.28-1.55) (1.38-1.68) (1.48-1.80) (1.56-1.92) (1.67-2.09) (1.75-2.21) 30-min 1.10 1.32 1.60 1.82 2.10 2.31 2.52 2.74 3.02 3.25 (1.00-1.20) (1.20-1.44) (1.46-1.76) (1.66-1.99) (1.90-2.30) (2.08-2.52) (2.26-2.76) (2.43-3.00) (2.66-3.32) (2.83-3.58) 60-min 1.37 1.65 2.06 2.37 2.80 3.13 3.48 3.84 4.34 4.74 (1.25-1.50) (1.51-1.81) (1.88-2.25) (2.16-2.59) (2.53-3.06) (2.82-3.42) (3.11-3.80) I (3.41-4.20) i (3.82-4.76) (4.13-5.23) 2-hr 1.59 1.93 2.42 I 2.81 3.36 3.80 I 4.26 1 4.76 I 5.48 6.07 (1.47-1.74) (1.78-2.12) (2.23-2.65) (2.57-3.07) (3.06-3.66) (3.44-4.14) (3.84-4.66) (4.26-5.21) (4.84-6.02) (5.30-6.69) 3-hr 1.70 2.06 2.59 3.02 3.64 4.16 4.71 5.32 6.21 6.97 (1.56-1.88) (1.88-2.27) (2.37-2.85) (2.75-3.32) (3.29-4.00) (3.74-4.57) (4.20-5.18) (4.70-5.87) (5.40-6.87) (6.00-7.72) - 6-hr 2.08 2.51 3.15 3.67 4.43 5.07 5.76 6.52 7.64 8.59 (1.92-2.28) (2.31-2.75) (2.89-3.45)_ (3.36-4.01) (4.02-4.84) (4.57-5.53) (5.15-6.30) (5.77-7.14) I (6.64-8.38) (7.39-9.45) 12-hr 2.52 3.05 3.83 4.47 5.40 6.18 7.03 7.95 9.32 10.5 (2.32-2.76) (2.80-3.34) (3.51-4.18) (4.08-4.87) 1 (4.90-5.88) (5.58-6.72) (6.28-7.63) (7.02-8.64) (8.12-10.1) (9.01-11.4) 24-hr I 3.05 3.69 4.64 5.40 6.45 7.31 8.20 9.14 I 10.5 11.5 (2.84-3.29) (3.43-3.97) (4.31-4.99) I (5.00-5.80) (5.96-6.92) (6.73-7.84) , (7.51-8.79) (8.32-9.80) (9.46-11.2) (10.4-12.4) 2-day 3.62 4.36 5.46 6.33 7.54 8.51 9.53 10.6 12.1 13.3 (3.36-3.89) (4.04-4.69) (5.06-5.87) (5.86-6.80) I (6.95-8.09) (7.82-9.14) (8.72-10.2) (9.65-11.4) (10.9-13.0) (11.9-14.3) 3-day 3.84 4.62 5.75 6.64 7.86 8.84 9.85 10.9 12.4 13.5 (3.58-4.13) (4.31-4.96) (5.35-6.17) (6.16-7.12) (7.27-8.42) (8.15-9.47) (9.06-10.6) (9.99-11.7) (11.3-13.3) (12.3-14.5) 4-day 4.07 4.89 6.04 6.94 8.18 9.17 10.2 11.2 12.6 13.8 (3.81-4.36) (4.57-5.24) (5.63-6.46) (6.46-7.43) (7.59-8.75) (8.48-9.80) (9.40-10.9) (10.3-12.0) (11.6-13.6) (12.6-14.8) 7-day 4.73 5.65 6.88 7.86 9.21 10.3 11.4 12.5 14.1 15.3 (4.44-5.04) (5.30-6.01) (6.45-7.32) (7.36-8.36) (8.59-9.79) (9.57-10.9) (10.6-12.1) (11.6-13.3) (12.9-15.0) (14.0-16.3) 10-day 5.37 6.39 7.69 8.70 10.1 11.1 12.2 13.3 14.8 16.0 (5.08-5.71) (6.04-6.79) (7.25-8.16) (8.20-9.24) (9.46-10.7) (10.4-11.8) (11.4-13.0) (12.4-14.2) (13.8-15.8) (14.8-17.0) 20-day 7.17 8.46 9.99 11.2 12.8 14.1 15.4 16.7 18.4 19.8 (6.80-7.55) (8.02-8.91) (9.47-10.5) I (10.6-11.8) (12.1-13.5) (13.3-14.8) (14.4-16.2) , (15.6-17.6) (17.2-19.5) (18.4-21.0) 30-day 8.76 10.3 12.0 13.3 15.0 16.3 17.6 I 18.9 20.6 22.0 (8.35-9.18) (9.83-10.8) (11.4-12.6) (12.6-13.9) (14.2-15.7) (15.5-17.1) (16.7-18.5) (17.9-19.9) (19.4-21.7) (20.6-23.2) 45-day 11.1 12.9 14.8 16.2 18.0 19.4 20.8 22.1 23.9 25.2 (10.6-11.6) (12.4-13.5) (14.1-15.4) (15.5-16.9) (17.2-18.8) (18.5-20.3) (19.8-21.7) (21.0-23.1) (22.6-25.0) (23.8-26.4) 60-day 13.2 15.4 17.3 18.9 20.9 22.4 23.8 25.2 27.0 28.4 (12.6-13.7) (14.7-16.0) (16.6-18.0) (18.1-19.6) (20.0-21.7) (21.4-23.3) (22.7-24.8) I (24.1-26.3) I (25.7-28.3) (27.0-29.7) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.2788&Ion=-81.5012&data=depth&units=english&series=pds 1/4 2/22/24, 10:11 AM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.2788°, Longitude: -81.5012° Average recurrence interval 25 - (years) c — 1 =- 20 - — — 2 a — 5 a) v — 10 c 15 - — 25 .y Co - 50 •a▪ 10 - A — 100 •V tL 011 500 5 �! — 1000 0- c c c c c - - - - >, >,>, >, >, >, >, >,>, •E •E •E •� •E L L L L L ro r0 r0 ro ex; r0 r0 r0 r0 i N re) 40 ry ,I 7'1" 7 7 7 77 0, $ Duration N N N ,-, N M •v taa 25 - - c L 20 - Duration y 5-min — 2-day -o c 15 - — 10-min — 3-day •��., 15-min — 4-day r0 a 10 - _ — 30-mm — 7-day _ a � r- �� — 60-mm — 10-day y JiJ� __ - � — 2-hr — 20-day 5 —� — 3-hr — 30-day miwo — 6fir — 45-day J 0 — 12-hr — 60-day r I . I I ' 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT) Thu Feb 22 15:10 54 2024 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.2788&Ion=-81.5012&data=depth&units=english&series=pds 2/4 2/22/24, 10:11 AM Precipitation Frequency Data Server lip,, fr- . i W Marion ____„/ 4010 / helby • r s• s � L'----.. i S • A lb .415.1.\\ 0,.). II t . 4 //�� 0 \�� (2ya on Q�a yJ , J 3km • 2mi ii f vi Large scale_terrain •Kingsport' Br ' Bristol — C� - 7 11 ' Johnson City' 0 ,, Winston-Salem • L. -,:,''''' Greensboro �• t �;, r.n Mitchell ilk P'' i'.�1���, 'Asheville I NORTH CARC>LIN= AE _._ 9 Charlotte Fayet Cr. Greenville + ` Sl>L1TH CAR ��LIN, y 100km 60mi Large scale map COJohnson y Inston-S lem o Greensb •xvill Asheylll Nort ' Carol' �■ ' arlotte --- —_ oGr - ' le ' + TM 100km 60mi cy• mhia v Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.2788&Ion=-81.5012&data=depth&units=english&series=pds 3/4 2/22/24, 10:11 AM Precipitation Frequency Data Server 4 Johnson Ci • Winston-Salem ville • • D Greensboro Asheville • Nort Carol Charlotte Greenville • • 111 100km oOmi Cdumbia • Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions(c�noaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.2788&Ion=-81.5012&data=depth&units=english&series=pds 4/4 PRECIPITATION DATA Shelby Rucker TRU-23006 1 1 SITE .11 s 'POt o MCADAMS The John R.McAdams Company,Inc. 2100 South Tryon Street ti Suite 400 Charlotte,NC 28203 02 r , P - g phone 704.527.0800 I " k fax 919.361.2269 VICINITY MAP W license number C-0293,C-187 NTS I POA 3 POA 4 POA 5 www.mcadamsco.com CLIENT SHAUN GASPARINI 2649 BREKON RIDGE CENTRE DRIVE - _- MONROE,NC 28110 ',is c PHONE:704.779.4126 is'cs_..o ° s ,- EMAIL:SGASPARINI@TRUEHOMESUSA.COM SUB4 \\ \ L -/ AREA=7.97AC ( �lllllll�ll,Il TrUE! Homes 0 5%�/� , TcASSUMED 12.24MIN. 1ll/l'i V ��� *,- /. -- Y\ / -1. �1 Q � v _,_ f�/ fa %,I1 A/ i/ � - - „ \ I i, r __ LLII lwS/7%/ //'/ 6 q �I • m ,.,// IYll'i�l/ / _,-- � A : LL/ ?I lli ,vp, /i � , / _ 1 1 // � > AIIII/ ��� %/( /y � ,5 _ z AV / � � i i � _ s rCL POA 2 4 //_//' / -' � Q % l SUB l r� lr- _� , ..��� i /� \ x AREA 7.47AC SU63 �^ o W Tc ASSUMED=21.23MIN. , ,V_: �, AREA=20.59AC �& s W '/tip r�'%i//l�/e A Tc ASSUMED=28.83 MIN. )w�Q ), .3 = �'� J�� o a ��\AIA�ll/ %�//C///////1 52� 760 l� SUBS "�AI� 'E Ce Q Z Z d -x‹a5 �r ili�. '� VA A\VA�A�AVIVAVAAI�A - ' ''.ro ite'i%/%2': AREA-46.58AC ;o"\VA ° - Q j ,"" , 'Ally ,A�\V \\�: j5 � `", \� w //,4 Tc ASSUMED 18.53 MIN \A\� v .-a i ,. /15� VAI V ..� 5 ��A". 1 i4t _;/�/t 1�/!t /I s�150S, 'V c. -\A / , co - Z m 11� // l 1 11 II i z i_ VA_,� q`Z' o:,/TVA��\VJ" `U e �lA Vll l A\�s i VAI A�dA�A �� J Q 2 VA��AA,...QP�� -� /J)/�jl, ��k ��., ��VA�.�Avwsk�\V -�ll,\�A�\O� ��„ll,,,,, ), ,1--y vt j/ � :i A VA l '\�5 _� �o A ary , I 1l/_ A\�'c�1 —�V 11 Vv Cl_ e III // \\ t \o > 4. 'N v cc ��� A 1 ../Uri -�o�vvAwAI��_�� _ �����A'• vl W _„,„,„ . 8 z, . V ��w\A I III i� :.v��A �_ N'D,), l�V11I II1, - r /L. >,�: , � s s CC o� ,�, l/N /fir/ �A 0 9s mA / ,,,')l1•77/ _ x s 7 o CO ,.. _, ..... 11 ..........".ftrip _ .9 --4 ))- zs �llll i) LL �v_ LL Kliirri • �, � /<<• / S�6 z /4 '`r I v J J a SUB1 �, ,-, _J 1 d 1 • AREA=13.69 AC `r ' i �- Tc ASSUMED=19.94 MIN. / N 1 4* ,:i. 1 i ` I g \ \ REVISIONS 3 NO. DATE ua F, 6 3 PLAN INFORMATION i ii O PROJECT NO. TRU-23006 8 8/I ��°-2. FILENAME TRU23006-PRE in 1111110/c/00 CHECKED BY SAW DRAWN BY KLP I Know what's below. SCALE 1"=200' Call before you dig. DATE 06.04.2024 E. SHEET 8 CONTRACTOR SHALL NOTIFY"NC811"(811)OR(1-800-632-4949) AT GRAPHIC SCALE PRE DEVELOPMENT 8 LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION o ioo zoo aoo OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. I 11 IAder- CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE 1 inch=200ft. PRE g, THEIR OWN LOCATOR SERVICES INDEPENDENT OF"NC811". t. REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. PRELIMINARY DRAWING-NOT RELEASED FOR CONSTRUCTION �la MCADAMS PRE DEVELOPMENT HYDROLOGIC SUMMARY Project Name: Shelby Rucker Date: 6/5/2024 Project Numbe TRU23006 Calculated By: S.Woodard,PE INPUT SUMMARY Onsite Area[acres] Offsite Area[acres] Total Area Subbasin ID Impervious Open Wooded Pond Total Impervious Open Wooded Pond Total [acres] SCS CN Tc[min] Sub-basin 1 0.00 0.35 2.38 0.00 2.73 2.89 6.95 1.12 0.00 10.97 13.69 67 19.94 Sub-basin 2 0.00 4.01 3.46 0.00 7.47 0.00 0.00 0.00 0.00 0.00 7.47 58 21.23 Sub-basin 3 0.28 11.49 3.49 0.00 15.26 1.09 3.20 1.04 0.00 5.33 20.59 62 28.83 Sub-basin 4 0.00 7.64 0.33 0.00 7.97 0.00 0.00 0.00 0.00 0.00 7.97 61 12.24 Sub-basin 5 0.38 21.97 22.88 0.00 45.22 0.40 0.86 0.09 0.00 1.36 46.58 62 18.53 Totals 0.66 45.45 32.54 0.00 78.65 4.38 11.02 2.26 0.00 17.66 96.30 i McADAMs PRE DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shelby Rucker Date: 6/5/2024 Project Numbei TRU23006 Calculated By: S.Woodard,PE Subbasin ID: Sub-basin 1 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 100% HSG'C'= 0% HSG'D'= 0% Cover Composite Condition SCS CN Comments Impervious 98 - Open 61 Assume good condition Wooded 55 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area SCS CN [sf] [acres] Comments _ Onsite Impervious 98 0 0.00 - Onsite Open 61 15,235 0.35 Assume good condition Onsite Wooded 55 103,476 _ 2.38 Assume good condition Onsite Pond 100 0 0.00 - Offsite Impervious 98 125,946 2.89 - Offsite Open 61 302,853 6.95 Assume good condition Offsite Wooded 55 48,963 1.12 Assume good condition Offsite Pond 100 0 0.00 - Total Area= 596,473 sf = 13.69 acres Composite SCS CN= 67 %Impervious= 21.12% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Segment 1:Overland Flow Segment 2:Concentrated Flow Length= 300 ft Length= 325 ft Upstream Elevation= 853.00 ft Upstream Elevation= 828.00 ft Downstream Elevation= 828.00 ft Downstream Elevation= 806.00 ft Height= 25.00 ft Height= 22.00 ft Slope= 0.0833 ft/ft Slope= 0.0677 ft/ft Manning's n= 0.24 Grass Paved? No P(2-year/24-hour)= 3.69 inches(Shelby,NC) Velocity= 4.20 ft/sec Segment Time= 18.08 minutes Segment Time= 1.29 minutes Segment 3:Channel Flow Length= 555 ft Upstream Elevation= 806.00 ft Downstream Elevation= 765.00 ft Height=_ 41.00 ft Slope= 0.0739 ft/ft Manning's n= 0.013 natural channel Flow Area= 2 sf(assume 30"CPP) Wetted Perimeter= 6 If(assume 30"CPP) Channel Velocity= 16.38 ft/sec Segment Time= 0.56 minutes Time of Concentration= 19.94 minutes SCS Lag Time= 11.96 minutes MCADAMS PRE DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shelby Rucker Date: 6/5/2024 Project Numbe TRU23006 Calculated By: S.Woodard,PE Subbasin ID: Sub-basin 2 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 100% HSG'C'= 0% HSG'D'= 0% Cover Composite Condition SCS CN Comments Impervious 98 - Open 61 Assume good condition Wooded 55 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area SCS CN [sf] [acres] Comments Onsite Impervious 98 0 0.00 - Onsite Open 61 174,518 4.01 Assume good condition Onsite Wooded 55 150,854 3.46 Assume good condition Onsite Pond 100 0 0.00 - Offsite Impervious 98 0 0.00 - Offsite Open 61 0 0.00 - Offsite Wooded 55 0 0.00 - Offsite Pond 100 0 0.00 - Total Area= 325,372 sf = 7.47 acres Composite SCS CN= 58 %Impervious= 0.00% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Segment 1:Overland Flow Segment 2:Concentrated Flow Length= 300 ft Length= 277 ft Upstream Elevation= 823.00 ft Upstream Elevation= 773.00 ft Downstream Elevation= 773.00 ft Downstream Elevation= 712.00 ft Height= 50.00 ft Height= 61.00 ft Slope= 0.1667 ft/ft Slope= 0.2202 ft/ft Manning's n= 0.40 Wooded light underbursh Paved? No P(2-year/24-hour)= 3.69 inches(Shelby,NC) Velocity= 7.57 ft/sec Segment Time= 20.62 minutes Segment Time= 0.61 minutes Time of Concentration= 21.23 minutes SCS Lag Time= 12.74 minutes MCADAMS PRE DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shelby Rucker Date: 6/5/2024 Project Numbei TRU23006 Calculated By: S.Woodard,PE Subbasin ID: Sub-basin 3 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 100% HSG'C'= 0% HSG'D'= 0% Cover Composite Condition SCS CN Comments Impervious 98 - Open 61 Assume good condition Wooded 55 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area SCS CN [sf] [acres] Comments _ Onsite Impervious 98 12,337 0.28 - Onsite Open 61 500,506 _ 11.49 Assume good condition _ Onsite Wooded 55 151,827 3.49 - Onsite Pond 100 0 0.00 Offsite Impervious 98 47,345 1.09 - Offsite Open 61 139,459 3.20 - Offsite Wooded 55 45,350 1.04 - Offsite Pond 100 0 0.00 - Total Area= 896,824 I sf = 20.59 acres Composite SCS CN= 62 %Impervious= 6.65% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Segment 1:Overland Flow Segment 2:Concentrated Flow Length= 300 ft Length= 1782 ft Upstream Elevation= 843.00 ft Upstream Elevation= 827.00 ft Downstream Elevation= 827.00 ft Downstream Elevation= 711.00 ft Height= 16.00 ft Height= 116.00 ft Slope= 0.0533 ft/ft Slope= 0.0651 ft/ft Manning's n= 0.24 Grass Paved? No P(2-year/24-hour)= 3.69 inches(Shelby,NC) Velocity= 4.12 ft/sec Segment Time= 21.62 minutes Segment Time= 7.21 minutes Time of Concentration= 28.83 minutes SCS Lag Time= 17.30 minutes MCADAMS PRE DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shelby Rucker Date: 6/5/2024 Project Numbei TRU23006 Calculated By: S.Woodard,PE Subbasin ID: Sub-basin 4 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 100.0% HSG'C'= 0.0% HSG'D'= 0.0% Cover Composite Condition SCS CN Comments Impervious 98 - Open 61 Assume good condition Wooded 55 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area SCS CN [sf] [acres] Comments _ Onsite Impervious 98 0 0.00 - Onsite Open 61 332,652 7.64 Assume good condition _ Onsite Wooded 55 14,540 0.33 - Onsite Pond 100 0 0.00 Offsite Impervious 98 0 0.00 - Offsite Open 61 _ 0 0.00 - Offsite Wooded 55 _ 0 0.00 - Offsite Pond 100 0 0.00 - Total Area= 347,192 sf = 7.97 acres Composite SCS CN= 61 %Impervious= 0.00% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Segment 1:Overland Flow Segment 2:Concentrated Flow Length= 300 ft Length= 125 ft Upstream Elevation= 788.00 ft Upstream Elevation= 753.00 ft Downstream Elevation= 753.00 ft Downstream Elevation= 718.00 ft Height= 35.00 ft Height= 35.00 ft Slope= 0.1167 ft/ft Slope= 0.2800 ft/ft Manning's n= 0.17 Cultivated soil Paved? No P(2-year/24-hour)= 3.69 inches(Shelby,NC) Velocity= 8.54 ft/sec Segment Time= 12.00 minutes Segment Time= 0.24 minutes Time of Concentration= 12.24 minutes SCS Lag Time= 7.34 minutes 'J MCADAMS PRE DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shelby Rucker Date: 6/5/2024 Project Numbei TRU23006 Calculated By: S.Woodard,PE Subbasin ID: Sub-basin 5 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 78% HSG'C'= 13% HSG'D'= 9% Cover Composite Condition SCS CN Comments Impervious 98 - Open 64 Assume good condition Wooded 59 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area SCS CN [sf] [acres] Comments _ Onsite Impervious 98 16,356 0.38 - Onsite Open 64 956,888 21.97 Assume good condition _ Onsite Wooded 59 _ 996,612 _ 22.88 - Onsite Pond 100 _ 0 0.00 Offsite Impervious 98 17,495 0.40 - Offsite Open 64 _ 37,628 _ 0.86 - Offsite Wooded 59 _ 4,137 0.09 - Offsite Pond 100 0 0.00 - Total Area= 2,029,116 sf = 46.58 acres Composite SCS CN= 62 %Impervious= 1.67% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Segment 1:Overland Flow Segment 2:Concentrated Flow Length= 300 ft Length= 500 ft Upstream Elevation= 825.00 ft Upstream Elevation= 790.00 ft Downstream Elevation= 790.00 ft Downstream Elevation= 737.00 ft Height= 35.00 ft Height= 53.00 ft Slope= 0.1167 ft/ft Slope= 0.1060 ft/ft Manning's n= 0.17 Cultivated Soils Paved? No P(2-year/24-hour)= 3.69 inches(Shelby,NC) Velocity= 5.25 ft/sec Segment Time= 12.00 minutes Segment Time= 1.59 minutes Segment 3:Channel Flow Length= 1373 ft Upstream Elevation= 737.00 ft Downstream Elevation= 691.00 ft Height= 46.00 ft Slope= 0.0335 ft/ft Manning's n= 0.045 natural channel Flow Area= 4 sf(assume 2'x2'channel) Wetted Perimeter= 6 If(assume 2'x2'channel) Channel Velocity= 4.63 _ft/sec Segment Time= 4.95 minutes Time of Concentration= 18.53 minutes SCS Lag Time= 11.12 minutes �I MCADAM Scenario: Pre 1 year 24 hr SUB* 1 . . 0 UsarosCMa .lb SUB 5 TO SCM POA-1 A Ai 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �� MCADAMS Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ft3) Pre 50 year 50 239,893.000 214.00 52.535 Pre 100 year 100 177,182.000 739.00 30.975 Pre 100 year 100 101,512.000 731.00 21.628 Pre 100 year 100 367,713.000 757.00 51.184 Pre 100 year 100 23,397.000 731.00 5.045 Pre 100 year 100 27,455.000 735.00 5.281 SUB-1 Pre 1 year 24 hr 1 30,030.000 734.00 6.150 SUB-1 Pre 10 year 10 102,999.000 731.00 24.136 SUB-1 Pre 25 year 25 142,362.000 731.00 32.486 SUB-2 Pre 1 year 24 hr 1 7,756.000 753.00 0.846 SUB-2 Pre 10 year 10 37,487.000 733.00 7.606 SUB-2 Pre 25 year 25 55,144.000 733.00 11.388 SUB-3 Pre 1 year 24 hr 1 30,763.000 745.00 3.988 SUB-3 Pre 10 year 10 124,966.000 738.00 22.895 SUB-3 Pre 25 year 25 178,407.000 738.00 32.682 SUB-4 Pre 1 year 24 hr 1 11,039.000 729.00 2.057 SUB-4 Pre 10 year 10 46,512.000 727.00 12.887 SUB-4 Pre 25 year 25 66,819.000 727.00 18.240 SUB-5 Pre 1 year 24 hr 1 70,011.000 734.00 11.381 SUB-5 Pre 10 year 10 283,891.000 731.00 65.634 SUB-5 Pre 25 year 25 405,089.000 731.00 92.598 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ft3) Pre 50 year 50 239,893.000 214.00 52.535 Pre 100 year 100 367,713.000 757.00 51.184 Pre 100 year 100 305,824.000 739.00 57.782 Pre 100 year 100 23,397.000 731.00 5.045 Pre 100 year 100 128,967.000 732.00 26.807 POA-1 Pre 1 year 24 hr 1 30,030.000 734.00 6.150 POA-1 Pre 10 year 10 102,999.000 731.00 24.136 POA-1 Pre 25 year 25 142,362.000 731.00 32.486 POA-2 Pre 1 year 24 hr 1 7,756.000 753.00 0.846 POA-2 Pre 10 year 10 37,487.000 733.00 7.606 POA-2 Pre 25 year 25 55,144.000 733.00 11.388 POA-3 Pre 1 year 24 hr 1 30,763.000 745.00 3.988 POA-3 Pre 10 year 10 124,966.000 738.00 22.895 POA-3 Pre 25 year 25 178,407.000 738.00 32.682 POA-4 Pre 1 year 24 hr 1 11,039.000 729.00 2.057 POA-4 Pre 10 year 10 46,512.000 727.00 12.887 POA-4 Pre 25 year 25 66,819.000 727.00 18.240 POA-5 Pre 1 year 24 hr 1 70,011.000 734.00 11.381 POA-5 Pre 10 year 10 283,891.000 731.00 65.634 POA-5 Pre 25 year 25 405,089.000 731.00 92.598 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 PRECIPITATION DATA Shelby Rucker TRU-23006 _S- 11 SITE ,oeo s�yg egibe. ,, qo t o MCADAMS The John R.McAdams Company,Inc. 2100 South Tryon Street , Suite 400 02 Charlotte,NC 28203 i gi C _ g phone 704.527.0800 " k fax 919.361.2269 © VICINITY MAP W license number:C-0293,C-187 NT$ SUB 4 to BYPASS POA 4 I POA 5 www.mcadamsco.com AREA=0.80 AC CLIENT Tc ASSUMED=10.50 MIN. SHAUN GASPARINI POA 3 2649 BREKONRIDGE CENTRE DRIVE -. MONROE,NC 28110 PHONE:704.779.4126 o s s EMAIL:SGASPARINIt4TRUEHOMESUSA.COM ---'-i r'ii-s-ii‘.7-i-:&-Z<4--.-,-initell -_-__.-- _- i-i-.1111.....",'"4,-; i-i'ii,i -------/'::°\ , „ �i i—'32Q SUB 4toSCMB L SUB 0 �i/ ,tsAREA=18.17 AC tt C True Homes AREA 1.53AC ,� �1 �� ,� TcASSUMED=S.00MIN ��� `tea WEV,wEW„,..o"VALUE Tc ASSUMED=9.77 MIN. � � �‘ � � �� �ry I� ��-/// '‘•-•.7.4 . 4*Tr4Ii)I'-• 'c,,'- - •--'- �'S /yam - qq��A // �y 17/ �lj� ,.!, �`� ,,, .AN, ' .f 1 ,�,�� � SUB 5 TO BYPASS , SUB 2 TO BYPASS II �i �` � ��, AREA-22.04 AC I- AREA=1.52 AC ; i b• \ "t" s '� Tc ASSUMED=13.38 MI.._ Tc ASSUMED=8.62 MIN. ° �a , e /� . gay {�� POA 2 y ye.�os�" , ` --„ �� / _ 1 \1 SUB 2 TO SCM C ��C� w �� ° x AREA=23.45 ACif. e �_ ,, 3 "�: ��� ��1 W W // ,<,,,' ,(,„.„. I 'mil I �I� �3� 0 0- o jTcASsUD5:oMiN \. Irr*sltk tie, Mira a0 N POA 1 , ,5 :. >> iul H// w —Al l of l = .,_...in , ` � s a°° 'ram IIIIII I' ' "" ,,,,, �� .. °, ss,N, .'S° ' z �-� .�� � ° �° ��I \ SUB5TOSCMA ��� Z , „ „.. d/�,iaer• °-i` �.4 %ii ` 1 AREA=17.88 AC r\� �� z Q m i / ,y �'' (�1. . A A . .w "",. / �, - I ,� _, �°° 1 - TcASSUMED=5.00MIN. i ` \\..� ,tnlI, . _ 1 ..' '" COi z w A _ i y��C i �'' ���4-1171 -=-7 ° - .-• � �� s ' � .ems • �► rfd fi W W OC i,,�11 iI `y ° -p . \,\I:r..-may ',00 4•1 i yl� it o I �� � 4.1 W L II I �.. , ( Off. ® 0 ir II. lir ft , ..,,,,,,,, , ?„.„__\\__,.0,, , ,,, .. „ , - __. �1i n � y I� . , cc, __________ J _, fl SUB 1 :'� AREA=10.91AC = Tc ASSUMED=19.94 MIN. . f 1 **4 \ REVISIONS 3 NO. DATE i 0 3 PLAN INFORMATION i. O PROJECT NO. TRU-23006 ��°- _� FILENAME TRU23006-POST 8 81x . CHECKED BY SAW DRAWN BY KLP Know what's below. SCALE 1"=200' Call before you dig. DATE 06.04.2024 E. SHEET 8 CONTRACTOR SHALL NOTIFY"NC811"(811)OR(1-800-632-4949) AT GRAPHIC SCALE POST DEVELOPMENT 8 LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION 0 000 zoo 000 OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. I �� I CONTRACTOR SHTSERVICES CONTACT ANY LOCAL PEND UTILITIES THAT PROVIDE t�D�h=z�h. POST � THEIR OWN LOCATOR SERVICES INDEPENDENT OF"NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. PRELIMINARY DRAWING-NOT RELEASED FOR CONSTRUCTION �la MCADAMS POST DEVELOPMENT HYDROLOGIC SUMMARY Project Name: Shebly Rucker Date: 6/5/2024 Project Number: TRU23006 Calculated By: S.WOODARD,PE INPUT SUMMARY Onsite Area[acres] Offsite Area[acres] Total Area Subbasin ID Impervious Open Wooded Pond Total Impervious _ Open Wooded Pond Total _ [acres] SCS CN Tc[min] SUB 1 0.00 0.43 0.49 0.00 0.92 2.66 6.21 1.12 0.00 9.99 10.91 69 19.94 SUB 2 TO BYPASS 0.09 0.97 0.47 0.00 1.52 0.00 0.00 0.00 0.00 0.00 1.52 61 8.62 SUB 2 TO SCM C 8.33 8.21 0.62 0.00 17.16 1.32 3.97 1.00 0.00 6.28 23.45 76 5.00 SUB 3 0.00 1.31 0.22 0.00 1.53 0.00 0.00 0.00 0.00 0.00 1.53 60 9.77 SUB 4 TO BYPASS 0.00 0.50 0.30 0.00 0.80 0.00 0.00 0.00 0.00 0.00 0.80 59 10.50 SUB 4 TO SCM B 9.86 8.31 0.00 0.00 18.17 0.00 0.00 0.00 0.00 0.00 18.17 81 5.00 SUB 5 TO BYPASS 0.69 8.24 13.11 0.00 22.04 0.00 0.00 0.00 0.00 0.00 22.04 66 13.38 SUB 5 TO SCM A 8.11 3.10 5.30 0.00 16.52 0.41 0.85 0.09 0.00 1.36 17.88 77 5.00 Totals 27.09 31.06 20.51 0.00 78.66 4.39 11.03 2.21 0.00 17.63 96.29 McADAMs POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shebly Rucker Date: 6/5/2024 Project Numbe TRU23006 Calculated By: S.WOODARD,PE Subbasin ID: SUB 1 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 100.0% HSG'C'= 0% HSG'D'= 0.0% Cover Composite Condition SCS CN Comments Impervious 98 - Open 61 Assume good condition Wooded 55 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area SCS CN [sf] [acres] Comments Onsite Impervious 98 0 0.00 - Onsite Open 61 18,673 0.43 Assume good condition Onsite Wooded 55 21,452 0.49 Assume good condition Onsite Pond 100 0 0.00 - Offsite Impervious 98 115,863 2.66 - Offsite Open 61 270,421 6.21 - Offsite Wooded 55 48,684 1.12 - Offsite Pond 100 0 - 0.00 - Total Area= 475,093.00 sf = 10.91 acres Composite SCS CN= 69 Impervious= 24.39% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Segment 1:Overland Flow Segment 2:Concentrated Flow Length=1 300 ft Length= 325 ft Upstream Elevation= 853.00 ft Upstream Elevation= 828.00 ft Downstream Elevation=_ 828.00 ft Downstream Elevation= 806.00 ft Height= 25.00 ft Height=_ 22.00 ft Slope= 0.0833 ft/ft Slope=_ 0.0677 ft/ft Manning's n= 0.24 Grass Paved? No P(2-year/24-hour)= 3.69 inches(Shelby,NC) Velocity= 4.20 ft/sec Segment Time= 18.08 minutes Segment Time= 1.29 minutes Segment 3:Channel Flow Length= 555 ft Upstream Elevation= 806.00 ft Downstream Elevation= 765.00 ft Height= 41.00 ft Slope= 0.0739 ft/ft Manning's n= 0.013 natural channel Flow Area= 2 sf(assume 30"CPP) Wetted Perimeter= 6 If(assume 30"CPP) Channel Velocity= 16.38 ft/sec Segment Time= 0.56 minutes Time of Concentration= 19.94 minutes SCS Lag Time= 11.96 minutes IMPERVIOUS AREA DELINEATION On-Site Buildings/Lots(st) 0.00 total on-site BUA allocated to the individual lots that is located within the drainage area(not con On-Site Streets(sf) 0.00 total on-site BUA associated with roadways that is located within the drainage area On-Site Parking(st) 0.00 total on-site BUA assoicated with the portions of the driveways that are not located on individua On-Site Sidewalks(st) 0.00 total on-site BUA associated with sidewalks that are not located on the individual lots that is lock Other On-Site(ft) 0.00 total on-site BUA that does not fall into the categories above(amenity area) Future(sf) 0.00 total on-site future BUA that is located within the drainage area Off-Site(st) 115,863.00 total off-site BUA that is located within the drainage area Existing BUA(st) 0.00 total existing on-site BUA that will remain in post-construction conditions that is located within th Total 115,863.00 'I MCADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shebly Rucker Date: 6/5/2024 Project Numbe TRU23006 Calculated By: S.WOODARD,PE Subbasin ID: SUB 2 TO BYPASS SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 100% HSG'C'= 0% HSG'D'= 0% Cover Composite Condition SCS CN Comments Impervious 98 - Open 61 Assume good condition Wooded 55 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area _ SCS CN [sf] [acres] _ Comments Onsite Impervious 98 4,000 0.09 - _ Onsite Open _ 61 42,059 0.97 Assume good condition Onsite Wooded 55 20,282 0.47 Assume good condition Onsite Pond 100 0 0.00 - Offsite Impervious 98 0 0.00 - Offsite Open _ 61 _ 0 0.00 - Offsite Wooded 55 0 0.00 - Offsite Pond 100 0 0.00 - Total Area= 66,341.00 sf = 1.52 acres Composite SCS CN= 61 Impervious= 6.03% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Segment 1:Overland Flow Segment 2:Concentrated Flow Length=1 100 ft Length= 185 ft Upstream Elevation= 788.00 ft Upstream Elevation= 768.00 ft Downstream Elevation= 768.00 ft Downstream Elevation= 714.00 ft Height= 20.00 ft Height= 54.00 ft Slope= 0.2000 ft/ft Slope= 0.2919 ft/ft Manning's n= 0.40 bermudagrass Paved? No P(2-year/24-hour)= 3.69 inches(Shelby,NC) Velocity= 8.72 ft/sec Segment Time=_ 7.96 minutes Segment Time= 0.35 minutes Segment 3:Channel Flow Length= 55 ft Upstream Elevation= 714.00 ft Downstream Elevation= 712.00 ft Height= 2.00 ft Slope= 0.0364 ft/ft Manning's n= 0.045 natural channel Flow Area= 1 sf(assume 1'X1') Wetted Perimeter= 3 If(assume 1'X1') Channel Velocity= 3.04 ft/sec Segment Time= 0.30 minutes Time of Concentration= 8.62 minutes SCS Lag Time= 5.17 minutes IMPERVIOUS AREA DELINEATION On-Site Buildings/Lots(st) 4,000.00 total on-site BUA allocated to the individual lots that is located within the drainage area(not cc On-Site Streets(sf) 0.00 total on-site BUA associated with roadways that is located within the drainage area On-Site Parking(st) 0.00 total on-site BUA assoicated with the portions of the driveways that are not located on individu On-Site Sidewalks(st) 0.00 total on-site BUA associated with sidewalks that are not located on the individual lots that is to Other On-Site(ft) 0.00 total on-site BUA that does not fall into the categories above(amenity area) Future(st) 0.00 total on-site future BUA that is located within the drainage area Off-Site(st) 0.00 total off-site BUA that is located within the drainage area Existing BUA(st) 0.00 total existing on-site BUA that will remain in post-construction conditions that is located within Total 4,000.00 'I MCADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shebly Rucker Date: 6/5/2024 Project Numbe TRU23006 Calculated By: S.WOODARD,PE Subbasin ID: SUB 2 TO SCM C SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 100% HSG'C'= 0% HSG'D'= 0% Cover Composite Condition SCS CN Comments Impervious 98 - Open 61 Assume good condition Wooded 55 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area _ SCS CN [sf] [acres] Comments Onsite Impervious 98 362,979 I 8.33 - _ Onsite Open _ 61 357,595 8.21 Assume good condition Onsite Wooded 55 26,978 0.62 Assume good condition Onsite Pond _ 100 0 0.00 - Offsite Impervious 98 57,427 1.32 - Offsite Open _ 61 _ 172,960 3.97 - Offsite Wooded I 55 43,350 1.00 - Offsite Pond 100 0 0.00 - Total Area= 1,021,289.00 sf = 23.45 acres Composite SCS CN= 76 Impervious= 41.16% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Time of Concentration= 5.00 minutes SCS Lag Time= 3.00 minutes IMPERVIOUS AREA DELINEATION On-Site Buildings/Lots(sf) 252,000.00 total on-site BUA allocated to the individual lots that is located within the drainage area(not cc On-Site Streets(sf) 77,058.00 total on-site BUA associated with roadways that is located within the drainage area On-Site Parking(st) 8,357.00 total on-site BUA assoicated with the portions of the driveways that are not located on individu On-Site Sidewalks(sf) 25,564.00 total on-site BUA associated with sidewalks that are not located on the individual lots that is to Other On-Site(ft) 0.00 total on-site BUA that does not fall into the categories above(amenity area) Future(st) 0.00 total on-site future BUA that is located within the drainage area Off-Site(st) 57,427.00 total off-site BUA that is located within the drainage area Existing BUA(sf) 0.00 total existing on-site BUA that will remain in post-construction conditions that is located within Total 420,406.00 �la MCADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shebly Rucker Date: 6/5/2024 Project Numbe TRU23006 Calculated By: S.WOODARD,PE Subbasin ID: SUB 3 SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 100% HSG'C'= 0% HSG'D'= 0% Cover Composite Condition SCS CN Comments Impervious 98 - Open 61 Assume good condition Wooded 55 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area SCS CN [sf] _Lacres] Comments Onsite Impervious 98 0 0.00 - Onsite Open 61 56,910 1.31 Assume good condition Onsite Wooded 55 9,647 0.22 Assume good condition Onsite Pond 100 0 0.00 - Offsite Impervious 98 0 0.00 - Offsite Open 61 0 0.00 - Offsite Wooded 55 0 0.00 - Offsite Pond 100 0 0.00 - Total Area= 66,557.00 sf = 1.53 acres Composite SCS CN= 60 Impervious=, 0.00% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Segment 1:Overland Flow Length= 100 ft Upstream Elevation= 723.00 ft Downstream Elevation= 711.00 ft Height= 12.00 _ft Slope= 0.1200 _ft/ft Manning's n= 0.40 Woods,light underbrush P(2-year/24-hour)= 3.69 _inches(Shelby,NC) Segment Time= 9.77 _minutes Time of Concentration= 9.77 minutes SCS Lag Time= 5.86 minutes IMPERVIOUS AREA DELINEATION On-Site Buildings/Lots(sf) 0.00 total on-site BUA allocated to the individual lots that is located within the drainage area(not co On-Site Streets(st) 0.00 total on-site BUA associated with roadways that is located within the drainage area On-Site Parking(sf) 0.00 total on-site BUA assoicated with the portions of the driveways that are not located on individu On-Site Sidewalks(st) 0.00 total on-site BUA associated with sidewalks that are not located on the individual lots that is log Other On-Site(ft) 0.00 total on-site BUA that does not fall into the categories above(amenity area) Future(sf) 0.00 total on-site future BUA that is located within the drainage area Off-Site(st) 0.00 total off-site BUA that is located within the drainage area Existing BUA(at) 0.00 total existing on-site BUA that will remain in post-construction conditions that is located within Total 0.00 �la MCADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shebly Rucker Date: 6/5/2024 Protect Numbe TRU23006 Calculated By: S.WOODARD,PE Subbasin ID: SUB 4 TO BYPASS SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 100% HSG'C'= 0% HSG'D'= 0% Cover Composite Condition SCS CN Comments Impervious 98 - Open 61 Assume good condition Wooded 55 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area SCS CN 1sf] (acres] Comments Onsite Impervious 98 0 0.00 - Onsite Open 61 21,699 0.50 Assume good condition Onsite Wooded 55 13,181 0.30 Assume good condition Onsite Pond 100 0 0.00 - Offsite Impervious 98 0 0.00 - Offsite Open 61 0 0.00 - Offsite Wooded 55 0 0.00 - Offsite Pond 100 0 0.00 - Total Area= 34,880.00 sf = 0.80 acres Composite SCS CN= 59 Impervious=, 0.00% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Segment 1:Overland Flow Length= 100 ft Upstream Elevation= 728.00 ft Downstream Elevation= 718.00 _ft Height= 10.00 _ft Slope= 0.1000 _ft/ft Manning's n= 0.40 Woods,light underbrush P(2-year/24-hour)= 3.69 _inches(Shelby,NC) Segment Time= 10.50 _minutes Time of Concentration= 10.50 minutes SCS Lag Time= 6.30 minutes IMPERVIOUS AREA DELINEATION On-Site Buildings/Lots(st) 0.00 total on-site BUA allocated to the individual lots that is located within the drainage area(not co On-Site Streets(st) 0.00 total on-site BUA associated with roadways that is located within the drainage area On-Site Parking(sf 0.00 total on-site BUA assoicated with the portions of the driveways that are not located on individu On-Site Sidewalks(st) 0.00 total on-site BUA associated with sidewalks that are not located on the individual lots that is log Other On-Site(ft) 0.00 total on-site BUA that does not fall into the categories above(amenity area) Future(st) 0.00 total on-site future BUA that is located within the drainage area Off-Site(st) 0.00 total off-site BUA that is located within the drainage area Existing BUA(at) 0.00 total existing on-site BUA that will remain in post-construction conditions that is located within Total 0.00 'I MCADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shebly Rucker Date: 6/5/2024 Project Numbe TRU23006 Calculated By: S.WOODARD,PE Subbasin ID: SUB 4 TO SCM B SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 100% HSG'C'= 0% HSG'D'= 0% Cover Composite Condition SCS CN Comments Impervious 98 - Open 61 Assume good condition Wooded 55 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area _ SCS CN_ [sf] [acres] Comments Onsite Impervious 98 429,646 I 9.86 - _ Onsite Open _ 61 361,779 8.31 Assume good condition Onsite Wooded 55 0 0.00 Assume good condition Onsite Pond _ 100 0 0.00 - Offsite Impervious 98 0 0.00 - Offsite Open _ 61 _ 0 0.00 - Offsite Wooded 55 0 0.00 - Offsite Pond 100 0 0.00 - Total Area= 791,425.00 sf = 18.17 acres Composite SCS CN= 81 Impervious= 54.29% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Time of Concentration= 5.00 minutes SCS Lag Time= 3.00 minutes IMPERVIOUS AREA DELINEATION On-Site Buildings/Lots(st) 306,000.00 total on-site BUA allocated to the individual lots that is located within the drainage area(not cc On-Site Streets(st) 86,529.00 total on-site BUA associated with roadways that is located within the drainage area On-Site Parking(st) 8,926.00 total on-site BUA assoicated with the portions of the driveways that are not located on individu On-Site Sidewalks(st) 28,191.00 total on-site BUA associated with sidewalks that are not located on the individual lots that is to Other On-Site(ft) 0.00 total on-site BUA that does not fall into the categories above(amenity area) Future(st) 0.00 total on-site future BUA that is located within the drainage area Off-Site(st) 0.00 total off-site BUA that is located within the drainage area Existing BUA(st) 0.00 total existing on-site BUA that will remain in post-construction conditions that is located within Total 429,646.00 'I MCADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shebly Rucker Date: 6/5/2024 Project Numbe TRU23006 Calculated By: S.WOODARD,PE Subbasin ID: SUB 5 TO BYPASS SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 55.2% HSG'C'= 25.0% HSG'D'= 19.8% Cover Composite Condition SCS CN Comments Impervious 98 - Open 68 Assume good condition Wooded 63 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area _ SCS CN [sf] [acres] _ Comments Onsite Impervious 98 30,000 I 0.69 - _ Onsite Open _ 68 _ 359,096 8.24 Assume good condition Onsite Wooded 63 570,985 13.11 Assume good condition Onsite Pond _ 100 _ 0 0.00 - Offsite Impervious 98 0 0.00 - Offsite Open _ 68 _ 0 0.00 - Offsite Wooded 63 0 0.00 - Offsite Pond 100 0 0.00 - Total Area= 960,081.00 sf = 22.04 acres Composite SCS CN= 66 Impervious= 3.12% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Segment 1:Overland Flow Segment 2:Concentrated Flow Length=I 100 ft Length= 127 ft Upstream Elevation= 779.00 ft Upstream Elevation= 760.00 ft Downstream Elevation= 760.00 ft Downstream Elevation= 737.00 ft Height= 19.00 ft Height= 23.00 ft Slope= 0.1900 ft/ft Slope= 0.1811 ft/ft Manning's n= 0.40 Bermudagrass Paved? No P(2-year/24-hour)= 3.69 inches(Shelby,NC) Velocity= 6.87 ft/sec Segment Time=_ 8.13 minutes Segment Time= 0.31 minutes Segment 3:Channel Flow Length= 1373 ft Upstream Elevation= 737.00 ft Downstream Elevation= 691.00 ft Height= 46.00 ft Slope= 0.0335 ft/ft Manning's n= 0.045 natural channel Flow Area= 4 sf(assume 2'x2'channel) Wetted Perimeter= 6 If(assume 2'x2'channel) Channel Velocity= 4.63 ft/sec Segment Time= 4.95 minutes Time of Concentration= 13.38 minutes SCS Lag Time= 8.03 minutes IMPERVIOUS AREA DELINEATION On-Site Buildings/Lots(st) 30,000.00 total on-site BUA allocated to the individual lots that is located within the drainage area(not cc On-Site Streets(sf) 0.00 total on-site BUA associated with roadways that is located within the drainage area On-Site Parking(st) 0.00 total on-site BUA assoicated with the portions of the driveways that are not located on individu On-Site Sidewalks(st) 0.00 total on-site BUA associated with sidewalks that are not located on the individual lots that is to Other On-Site(ft) 0.00 total on-site BUA that does not fall into the categories above(amenity area) Future(st) 0.00 total on-site future BUA that is located within the drainage area Off-Site(st) 0.00 total off-site BUA that is located within the drainage area Existing BUA(st) 0.00 total existing on-site BUA that will remain in post-construction conditions that is located within Total 30,000.00 'I MCADAMS POST DEVELOPMENT HYDROLOGIC CALCULATIONS Project Name: Shebly Rucker Date: 6/5/2024 Project Numbe TRU23006 Calculated By: S.WOODARD,PE Subbasin ID: SUB 5 TO SCM A SCS CURVE NUMBER (REF: TR-55 and NRCS Web Soil Survey). HSG Impervious Open Wooded Pond A 98 39 30 100 B 98 61 55 100 C 98 74 70 100 D 98 80 77 100 HSG'A'= 0% HSG'B'= 97% HSG'C'= 0% HSG'D'= 3% Cover Composite Condition SCS CN Comments Impervious 98 - Open 62 Assume good condition Wooded 56 Assume good condition Pond 100 - WATERSHED BREAKDOWN Composite Area Area Contributing Area _ SCS CN [sf] [acres] _ Comments Onsite Impervious 98 353,392 I 8.11 - _ Onsite Open _ 62 _ 134,971 3.10 Assume good condition Onsite Wooded 56 231,070 5.30 Assume good condition Onsite Pond _ 100 _ 0 0.00 - OffsiteImpervious 98 18,000 0.41 - Offsite Open — 62 — 37,123 0.85 - Offsite Wooded 56 4,137 0.09 - Offsite Pond 100 0 0.00 - Total Area= 778,693 sf = 17.88 acres Composite SCS CN= 77 Impervious= 47.69% TIME OF CONCENTRATION (REF: SCS Segmental Approach,TR-55). Time of Concentration= 5.00 minutes SCS Lag Time= 3.00 minutes IMPERVIOUS AREA DELINEATION On-Site Buildings/Lots(st) 252,000.00 total on-site BUA allocated to the individual lots that is located within the drainage area(not communal bi On-Site Streets(sf) 63,444.00 total on-site BUA associated with roadways that is located within the drainage area On-Site Parking(sf) 7,948.00 total on-site BUA assoicated with the portions of the driveways that are not located on individual lots and On-Site Sidewalks(sf) 30,000.00 total on-site BUA associated with sidewalks that are not located on the individual lots that is located withii Other On-Site(ft) 0.00 total on-site BUA that does not fall into the categories above(amenity area) Future(st) 0.00 total on-site future BUA that is located within the drainage area Off-Site(st) 18,000.00 total off-site BUA that is located within the drainage area Existing BUA(sf) 0.00 total existing on-site BUA that will remain in post-construction conditions that is located within the drainag Total 371,392.00 MCADAMS Scenario: Post 1 year 24 hr Pa . . SUBaT+BANn Sl1B5T+SCMA • SCM C SCM B L SCM A POA-1 r r Pons POA a POA-3 POA 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �J MCADAMS Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ft3) Post 50 year 50 227,523.000 186.00 127.243 Post 50 year 50 16,131.000 190.00 7.190 Post 50 year 50 100,518.000 213.00 23.668 Post 50 year 50 24,568.000 199.00 7.803 SUB-1 Post 1 year 24 hr 1 27,581.000 733.00 5.975 SUB-1 Post 10 year 10 88,591.000 731.00 21.046 SUB-1 Post 25 year 25 121,057.000 731.00 27.848 SUB-1 Post 100 year 100 178,404.000 731.00 38.601 SUB-2 Post 1 year 24 hr 1 2,125.000 727.00 0.463 SUB-2 Post 10 year 10 8,901.000 724.00 2.804 SUB-2 Post 25 year 25 12,785.000 724.00 3.973 SUB-2 Post 100 year 100 19,886.000 724.00 5.861 SUB-3 Post 1 year 24 hr 1 1,950.000 728.00 0.368 SUB-3 Post 10 year 10 8,513.000 725.00 2.530 SUB-3 Post 25 year 25 12,318.000 725.00 3.629 SUB-3 Post 100 year 100 19,312.000 725.00 5.412 SUB-4 Post 1 year 24 hr 1 931.000 729.00 0.152 SUB-4 Post 10 year 10 4,247.000 726.00 1.213 SUB-4 Post 25 year 25 6,193.000 725.00 1.758 SUB-4 Post 100 year 100 9,789.000 725.00 2.670 SUB-5 Post 1 year 24 hr 1 45,509.000 729.00 11.049 SUB-5 Post 10 year 10 159,680.000 728.00 44.860 SUB-5 Post 25 year 25 221,962.000 728.00 60.203 SUB-5 Post 100 year 100 333,279.000 727.00 84.728 SUB 2 TO SCM C Post 1 year 24 hr 1 89,267.000 722.00 38.929 SUB 2 TO SCM C Post 10 year 10 243,799.000 721.00 98.949 SUB 2 TO SCM C Post 25 year 25 321,309.000 721.00 123.369 SUB 2 TO SCM C Post 100 year 100 454,774.000 721.00 160.274 SUB 4 TO SCM B Post 1 year 24 hr 1 89,171.000 721.00 40.295 SUB 4 TO SCM B Post 10 year 10 220,084.000 721.00 89.530 SUB 4 TO SCM B Post 25 year 25 283,597.000 721.00 108.407 SUB 4 TO SCM B Post 100 year 100 391,402.000 721.00 136.434 SUB 5 TO SCM A Post 1 year 24 hr 1 71,759.000 722.00 31.578 SUB 5 TO SCM A Post 10 year 10 191,875.000 721.00 77.989 SUB 5 TO SCM A Post 25 year 25 251,702.000 721.00 96.638 SUB 5 TO SCM A Post 100 year 100 354,400.000 721.00 124.710 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ft3) Post 50 year 50 325,783.000 209.00 52.462 POA-1 Post 1 year 24 hr 1 27,581.000 733.00 5.975 POA-1 Post 10 year 10 88,591.000 731.00 21.046 POA-1 Post 25 year 25 121,057.000 731.00 27.848 POA-1 Post 100 year 100 178,404.000 731.00 38.601 POA-2 Post 1 year 24 hr 1 65,649.000 727.00 0.579 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �J MCADAMS Subsection: Master Network Summary Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ft3) POA-2 Post 10 year 10 163,318.000 753.00 10.253 POA-2 Post 25 year 25 243,599.000 753.00 28.564 POA-2 Post 100 year 100 382,953.000 730.00 64.149 POA-3 Post 1 year 24 hr 1 1,950.000 728.00 0.368 POA-3 Post 10 year 10 8,513.000 725.00 2.530 POA-3 Post 25 year 25 12,318.000 725.00 3.629 POA-3 Post 100 year 100 19,312.000 725.00 5.412 POA-4 Post 1 year 24 hr 1 65,684.000 729.00 0.287 POA-4 Post 10 year 10 138,178.000 754.00 9.486 POA-4 Post 25 year 25 202,866.000 753.00 21.341 POA-4 Post 100 year 100 313,454.000 730.00 52.516 POA-5 Post 1 year 24 hr 1 99,006.000 729.00 11.155 POA-5 Post 10 year 10 278,336.000 728.00 46.844 POA-5 Post 25 year 25 399,230.000 728.00 66.309 POA-5 Post 100 year 100 611,806.000 727.00 94.370 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ft3) Surface (ft3) Elevation (ft) Post 50 year 50 227,523.000 186.00 127.243 (N/A) (N/A) Post 50 year 50 184,566.000 212.00 20.613 804.708 145,780.000 SCM C(IN) Post 1 year 24 1 89,267.000 722.00 38.929 (N/A) (N/A) hr SCM C Post 1 year 24 1 63,524.000 1,445.00 0.206 731.512 81,118.000 (OUT) hr SCM C(IN) Post 10 year 10 243,799.000 721.00 98.949 (N/A) (N/A) SCM C Post 10 year 10 154,417.000 757.00 9.386 732.761 128,033.000 (OUT) SCM C(IN) Post 25 year 25 321,309.000 721.00 123.369 (N/A) (N/A) SCM C Post 25 year 25 230,815.000 753.00 27.137 733.454 155,901.000 (OUT) SCM C(IN) Post 100 year 100 454,774.000 721.00 160.274 (N/A) (N/A) SCM C Post 100 year 100 363,067.000 730.00 60.145 733.957 176,986.000 (OUT) SCM B(IN) Post 1 year 24 1 89,171.000 721.00 40.295 (N/A) (N/A) hr SCM B Post 1 year 24 1 64,754.000 1,445.00 0.212 716.645 80,576.000 (OUT) hr SCM B(IN) Post 10 year 10 220,084.000 721.00 89.530 (N/A) (N/A) SCM B Post 10 year 10 133,931.000 756.00 9.048 717.802 120,627.000 (OUT) SCM B(IN) Post 25 year 25 283,597.000 721.00 108.407 (N/A) (N/A) SCM B Post 25 year 25 196,673.000 753.00 20.618 718.515 146,712.000 (OUT) SCM B(IN) Post 100 year 100 391,402.000 721.00 136.434 (N/A) (N/A) 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �J MCADAMS Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ft3) Surface (ft3) Elevation (ft) SCM B Post 100 year 100 303,664.000 730.00 50.360 718.964 163,737.000 (OUT) SCM A(IN) Post 1 year 24 1 71,759.000 722.00 31.578 (N/A) (N/A) hr SCM A Post 1 year 24 1 53,496.000 1,445.00 0.177 755.912 64,668.000 (OUT) hr SCM A(IN) Post 10 year 10 191,875.000 721.00 77.989 (N/A) (N/A) SCM A Post 10 year 10 118,656.000 781.00 6.178 756.955 104,072.000 (OUT) SCM A(IN) Post 25 year 25 251,702.000 721.00 96.638 (N/A) (N/A) SCM A Post 25 year 25 177,269.000 759.00 8.932 757.729 135,053.000 (OUT) SCM A(IN) Post 100 year 100 354,400.000 721.00 124.710 (N/A) (N/A) SCM A Post 100 year 100 278,527.000 755.00 19.140 758.899 184,774.000 (OUT) 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 PRECIPITATION DATA Shelby Rucker TRU-23006 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Above NP 6/5/2024 STAGE-STORAGE FUNCTION-ABOVE NORMAL POOL Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 754.00 0.00 29,238 754.50 0.50 33,094 31166 15583 15583 0.50 755.00 1.00 34,281 33688 16844 32427 1.00 756.00 2.00 36,699 35490 35490 67917 1.98 757.00 3.00 39,173 37936 37936 105853 2.99 758.00 4.00 41,703 40438 40438 146291 4.04 759.00 5.00 44,290 42997 42997 189287 5.14 760.00 6.00 46,933 45612 45612 234899 6.28 Storage vs.Stage 160000 - 140000 - 1 075 y=32589x 120000 - Rz=0.9998 6 100000 - o w 80000 - m . 60000 - co 40000 - 20000 - 0 1 1 11 0.00 1.00 2.00 3.00 4.00 5.00 Stage(feet) KS= 32589 b= 1.0750 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Main Pool 6/5/2024 STAGE-STORAGE FUNCTION-MAIN POOL Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) - (CF) (feet) 748.00 -1.00 13,135 749.00 0.00 14,217 Sediment Storage 750.00 1.00 15,329 I 14773 14773 14773 1.01 752.00 3.00 17,645 I 16487 32974 47747 2.95 753.00 4.00 18,848 18247 18247 65994 3.98 753.50 4.50 19,461 19155 9577 75571 4.51 754.00 5.00 I 21,870 20666 10333 I 85904 I 5.07 *surface area and volume used for avg.depth calculation Storage vs.Stage 100000 90000 — 80000 — y=14685x1 0882 70000 R2=0.9994 ii o 60000 & 50000 m 0 40000 N 30000 20000 — 10000 — 0 r I 1 1 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Stage(feet) KS= 14685 b= 1.0882 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Forebay 6/5/2024 STAGE-STORAGE FUNCTION-FOREBAY Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) - (CF) (feet) 747.00 -1.00 856 748.00 0.00 1,021 Sediment Storage 749.00 1.00 1,794 1408 1408 1408 1.01 750.00 2.00 2,366 2080 2080 3488 1.95 752.00 4.00 3,707 3037 6073 9561 4.05 753.00 5.00 4,474 4091 4091 13651 5.24 753.50 5.50 4,882 4678 2339 15990 5.87 754.00 6.00 6,369 5626 2813 18803 6.61 Storage vs.Stage 12000 - 10000 - y=1384x1 382 8000 - R2=0.9994 I4000 - 2000 - 0 i i 0.00 1.00 2.00 3.00 4.00 5.00 Stage(feet) KS= 1384.0 b= 1.3820 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Forebay 6/5/2024 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 Volume Calculation 6/5/2024 TOTAL VOLUME OF FACILITY Volume of Main Pool below Normal Pool= 85,904 cf Volume of Forebay below Normal Pool= 18,803 cf Total Volume Below Normal Pool= 104,706 cf Total Volume Above Normal Pool= 234,899 cf Total Volume of Facility= 339,605 cf 1pREBAY PERCENTAGE OF PERMANENT POOL VOLUM Per NCDEQ Minimum Design Criteria,the forebay volume should equal approximately 15-20%of the main pool volume. Total Main Pool Volume= 85,904 cf Provided Forebay Volume= 18,803 cf Provided Forebay Volume%= 22% Main Pool Volume at Normal Pool= 85,904 cf Main Pool Area at Normal Pool= 21,870 sf Average Depth= 3.93 ft Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU 23006 Surface Area Calculation 6/5/2024 WET DETENTION BASIN SUMMARY Enter the drainage area characteristics==> Total drainage area to pond= 17.88 acres Total impervious area to pond= 8.53 acres Note The basin must be sized to treat all impervious surface runoff draining into the pond,not just the impervious surface from on-site development. Drainage area= 17.88 acres @ 47.7% impervious Estimate the surface area required at pond normal pool elevation==> Wet Detention Basins are based on an minimum average depth of = 3.93 feet(Calculated) 3.0 3.93 4.0 Lower Boundary=> 40.0 1.51 1.24 Site%impervious=> 47.7 1.73 1.47 1.45 Upper Boundary=> 50.0 1.79 1.51 Therefore,SA/DA required= 1.47 Surface area required for main pool at normal pool= 11,429 ft2 = 0.26 acres Surface area provided for main pool at normal pool= 21,870 ft2 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 WQV Calculation 6/5/2024 DETERMINATION OF WATER QUALITY VOLUME WQ v=(P)(R v)(A)/12 where, WQv=water quality volume(in acre-ft) Rv=0.05+0.009(1)where I is percent impervious cover A=area in acres P=rainfall(in inches) Input data: Total area,A= 17.88 acres Impervious area= 8.53 acres Percent impervious cover,I= 47.7 % Rainfall,P= 1.00 inches Calculated values: Rv= 0.48 WQv= 0.71 acre-ft = 31099 cf. ASSOCIATED DEPTH IN POND JIM- WQv= 31099 cf. Stage/Storage Data: Ks= 32589 b= 1.075 Zo= 754.00 Volume in 1"rainfall= 31099 cf. Calculated values: Depth of WQv in Basin= 0.96 ft = 11.49 inches Elevation= 754.96 ft WILLOWBROOK STORMWATER CONTROL MEASURE LIAM MCNALLY,El MNG-23004 WQV Drawdown Calculation 6/5/2024 DRAWDOWN ORIFICE DESIGN D orifice= 2.25 inch #orifices= 1 Ks= 32589 b= 1.0750 Cd orifice= 0.60 Normal Pool Elevation= 754.00 feet Volume @ Normal Pool= 0 cf Orifice Invert= 754.00 feet WSEL @ 1"Runoff Volume= 754.96 feet WSEL Vol.Stored Orifice Flow Avg.Flow Incr.Vol. Incr.Time (feet) (cf) (cfs) (cfs) (cf) (sec) 754.96 31099 0.123 754.87 28158 0.117 0.120 2940 24451 754.79 25239 0.111 0.114 2919 25629 754.70 22343 0.104 0.107 2896 27023 754.62 19474 0.096 0.100 2870 28709 754.53 16633 0.088 0.092 2840 30807 754.45 13826 0.079 0.084 2807 33528 754.37 11059 0.069 0.074 2767 37267 754.28 8339 0.058 0.063 2720 42911 754.20 5681 0.043 0.050 2658 53088 754.11 3110 0.019 0.031 2571 83531 Drawdown Time= 4.48 days By comparison,if calculated by the average head over the orifice (assuming average head is one-third the total depth),the result would be: Average driving head on orifice= 0.288 feet Orifice composite loss coefficient= 0.600 Cross-sectional area of siphon= 0.028 sf Q= 0.0713 cfs Drawdown Time=Volume/Flowrate/86400(sec/day) Drawdown Time= 5.05 days 'J MCADAMS RISER ANTI-FLOTATION CALCULATION Project Name: Shelby Rucker Date: 6/5/2024 Project Number: TRU-23006 Calculated By: S.Woodard,PE Facility ID: SCM A INPUT DATA Inside Length= 4.00 ft Inside Width= 4.00 ft Wall Thickness= 6.00 in Standard Base Length= 5.00 ft Standard Base Width= 5.00 ft Standard Base Thickness= 6.00 in Inside Height of Riser= 4.30 ft Concrete Unit Weight= 142.00 pcf I Unit weight of manhole concrete is 142 pcf per NC Products Outside Diameter of Barrel= 18.00 in Drain Pipe(if present)= 0.00 in CONCRETE PRESENT IN RISER STRUCTURE Riser Walls= 38.700 cf Standard Base of Riser= 12.500 cf Less Opening for Barrel= 0.884 cf Less Opening for Drain Pipe= 0.000 cf Total Concrete Less Openings= 50.316 cf Weight of Concrete= 7,145 lbs AMOUNT OF WATER DISPLACED BY RISER STRUCTURE Displacement by Concrete= 50.316 cf Displacement by Open Air= 68.800 cf Total Water Displaced= 119.116 cf Weight of Water Displaced= 7,433 lbs AMOUNT OF CONCRETE TO ADD TO RISER STRUCTURE Safety Factor= 1.15 I Recommend 1.15 or higher Add'I Weight for Bouyancy= 1,403 lbs Bouyant Weight of Concrete= 79.60 pcf Bouyant Weight w/SF= 69.22 pcf Add'I Concrete to Add= 20.267 cf Less Standard Base= 12.500 cf New Base Design Required= 32.767 cf ANTI FLOTATION BLOCK DESIGN CALCULATIONS AF Block Length= 7.00 ft AF Block Width= 7.00 ft AF Block Thickness= 9.00 in AF Block Provided= 36.750 cf Total Concrete Present= 74.566 cf = 10,588 lbs 'J MCADAMS DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Project: Shelby Rucker Date: 5/31/2024 Project Number: TRU-23006 Calculated By: LPM Outlet Number: SCM A Outlet flowrate= 6.178 cfs Pipe diameter= 18 inches Number of pipes= 1 Pipe separation= 0 feet Outlet Velocity= 7.33 ft/sec Figure 8.06.b.1 25 zone 7 20 �i� �f•f•------ uu f•�f• w 15 --� f• f•- t" _--- Zone 5 u• 10 f•f•__ -Zeno-4 11b.. MIIIIINE �f•f•f•--- 5 MM = ;; Zone-- --- -0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 2 Outlet pipe diameter 18 in. Length= 9.0 ft. Outlet flowrate 6.2 cfs Width= 5.1 ft. Outlet velocity 7.3 ft/sec Stone diameter= 6 in. Material= Class B Thickness= 18 in. Zone Material Diameter Thickness Length Width 1 Class A 3 12 4xD(o) 3xD(o) 2 Class B 6 18 6 x D(o) 3 x D(o) 3 Class 13 24 8 x D(o) 3 x D(o) 4 Class 13 24 8xD(o) 3xD(o) 5 Class 11 23 36 10 x D(o) 3 x D(o) 6 Class 11 23 36 10 x D(o) 3 x D(o) 7 Special study required 1. Calculations based on NY DOT method-Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full flow velocity �I MCADAM Subsection: Elevation-Area Volume Curve Return Event: 1 years Label: SCM A Storm Event: 1 year Scenario: Post 1 year 24 hr Elevation Planimeter Area Al+A2+sqr Volume Volume(Total) (ft) (ft2) (ft2) (A1*A2) (ft3) (ft3) (ft2) 754.000 0.000 29,238.00 0.00 0.000 0.000 754.500 0.000 33,094.00 93,438.31 15,573.000 15,573.000 755.000 0.000 34,281.00 101,057.27 16,843.000 32,416.000 756.000 0.000 36,699.00 106,449.40 35,483.000 67,899.000 757.000 0.000 39,173.00 113,787.83 37,929.000 105,828.000 758.000 0.000 41,703.00 121,294.21 40,431.000 146,260.000 759.000 0.000 44,290.00 128,970.04 42,990.000 189,250.000 760.000 0.000 46,933.00 136,815.35 45,605.000 234,855.000 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �� MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM A Storm Event: 1 year Scenario: Post 1 year 24 hr Requested Pond Water Surface Elevations Minimum (Headwater) 754.000 ft Increment(Headwater) 0.500 ft Maximum (Headwater) 760.000 ft Outlet Connectivity Structure Type Outlet ID Direction Outfall El E2 (ft) (ft) Orifice-Area SCM A- 10 Forward SCM A 756.000 760.000 YR Orifice Culvert Inlet Box SCM A Forward SCM A 758.200 760.000 Riser Culvert Orifice-Circular SCM A- Forward SCM A 754.000 760.000 WQV Culvert Orifice Culvert-Circular SCM A Forward TW 753.900 I 760.000 Culvert Tailwater Settings Tailwater (N/A) (N/A) 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �� MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM A Storm Event: 1 year Scenario: Post 1 year 24 hr Structure ID: SCM A Culvert Structure Type: Culvert-Circular Number of Barrels 1 Diameter 18.000 in Length 55.00 ft Length (Computed Barrel) 55.01 ft Slope(Computed) 0.016 ft/ft Outlet Control Data Manning's n 0.013 Ke 0.20 Kb 0.02 Kr 0.00 Convergence Tolerance 0.001 ft Inlet Control Data Equation Form Form 1 K 0.0045 M 2.0000 C 0.0317 Y 0.6900 T1 ratio(HW/D) 1.09 T2 ratio(HW/D) 1.19 Slope Correction Factor -0.50 Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 &T2... T1 Elevation 755.531 ft T1 Flow 7.575 ft3/s T2 Elevation 755.684 ft T2 Flow 8.657 ft3/s 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �J MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM A Storm Event: 1 year Scenario: Post 1 year 24 hr Structure ID: SCM A Riser Structure Type: Inlet Box Number of Openings 1 Elevation 758.200 ft Orifice Area 16.000 ft2 Orifice Coefficient 0.60 Weir Length 16.00 ft Weir Coefficient 3.00(ft^0.5)/s K Reverse 1.00 Manning's n 0.00 Key, Charged Riser 0.00 Weir Submergence False Orifice H to crest False Structure ID: SCM A-WQV Orifice Structure Type: Orifice-Circular Number of Openings 1 Elevation 754.000 ft Orifice Diameter 2.250 in Orifice Coefficient 0.60 Structure ID: SCM A- 10 YR Orifice Structure Type: Orifice-Area Number of Openings 1 Elevation 756.000 ft Orifice Area 1.500 ft2 Top Elevation 756.500 ft Datum Elevation 756.250 ft Orifice Coefficient 0.60 Structure ID: TW Structure Type: TW Setup, DS Channel Tailwater Type Free Outfall Convergence Tolerances Maximum Iterations 30 Tailwater Tolerance 0.010 ft (Minimum) Tailwater Tolerance 0.500 ft (Maximum) Headwater Tolerance 0.010 ft (Minimum) Headwater Tolerance 0.500 ft (Maximum) 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �J MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM A Storm Event: 1 year Scenario: Post 1 year 24 hr Convergence Tolerances Flow Tolerance(Minimum) 0.001 ft3/s Flow Tolerance(Maximum) 10.000 ft3/s 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �J MCADAMS Subsection: Composite Rating Curve Return Event: 1 years Label: SCM A Storm Event: 1 year Scenario: Post 1 year 24 hr Composite Outflow Summary Water Surface Flow Tailwater Elevation Convergence Error Contributing Structures Elevation (ft3/s) (ft) (ft) (ft) 754.000 0.000 (N/A) 0.000 (no Q: SCM A- 10 YR Orifice,SCM A Riser,SCM A -WQV Orifice,SCM A Culvert) 754.500 0.084 (N/A) 0.000 SCM A-WQV Orifice,SCM A Culvert (no Q: SCM A- 10 YR Orifice,SCM A Riser) 755.000 0.126 (N/A) 0.000 SCM A-WQV Orifice,SCM A Culvert (no Q: SCM A- 10 YR Orifice,SCM A Riser) 755.500 0.156 (N/A) 0.000 SCM A-WQV Orifice,SCM A Culvert (no Q: SCM A- 10 YR Orifice,SCM A Riser) 756.000 0.182 (N/A) 0.000 SCM A-WQV Orifice,SCM A Culvert (no Q: SCM A- 10 YR Orifice,SCM A Riser) 756.500 3.774 (N/A) 0.000 SCM A- 10 YR Orifice,SCM A-WQV Orifice,SCM A Culvert (no Q: SCM A Riser) 757.000 6.415 (N/A) 0.000 SCM A- 10 YR Orifice,SCM A-WQV Orifice,SCM A Culvert (no Q: SCM A Riser) 757.500 8.249 (N/A) 0.000 SCM A- 10 YR Orifice,SCM A-WQV Orifice,SCM A Culvert (no Q: SCM A Riser) 758.000 I 9.739 (N/A) 0.000 SCM A- 10 YR Orifice,SCM A-WQV Orifice,SCM A Culvert (no Q: SCM A Riser) 758.200 10.276 (N/A) 0.000 SCM A- 10 YR Orifice,SCM A-WQV Orifice,SCM A Culvert (no Q: SCM A Riser) 758.500 15.604 (N/A) 0.000 SCM A- 10 YR Orifice,SCM A Riser,SCM A -WQV Orifice,SCM A Culvert 759.000 20.039 (N/A) 0.000 SCM A Riser,SCM A Culvert (no Q: SCM A- 10 YR Orifice,SCM A- WQV Orifice) 759.500 21.234 (N/A) 0.000 SCM A Riser,SCM A Culvert (no Q: SCM A- 10 YR Orifice,SCM A- WQV Orifice) 760.000 22.364 (N/A) 0.000 SCM A Riser,SCM A Culvert (no Q: SCM A- 10 YR Orifice,SCM A- WQV Orifice) 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �� MCADAMS Subsection: Level Pool Pond Routing Summary Return Event: 1 years Label: SCM A (IN) Storm Event: 1 year Scenario: Post 1 year 24 hr Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 754.000 ft Initial) Volume(Initial) 0.000 ft3 Flow(Initial Outlet) 0.000 ft3/s Flow(Initial Infiltration) 0.000 ft3/s Flow(Initial,Total) 0.000 ft3/s Time Increment 1.00 min Inflow/Outflow Hydrograph Summary Flow(Peak In) 31.578 ft3/s Time to Peak(Flow, In) 722.00 min Flow(Peak Outlet) 0.177 ft3/s Time to Peak(Flow, Outlet) 1,445.00 min Elevation (Water Surface, 755.912 ft Peak) Volume(Peak) 64,667.709 ft3 Mass Balance(ft3) Volume(Initial) 0.000 ft3 Volume(Total Inflow) 71,759.000 ft3 Volume(Total Infiltration) 0.000 ft3 Volume(Total Outlet 53,496.000 ft3 Outflow) Volume(Retained) 18,218.000 ft3 Volume(Unrouted) -45.000 ft3 Error(Mass Balance) 0.1 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �I MCADAMS Subsection: Level Pool Pond Routing Summary Return Event: 100 years Label: SCM A (IN) Storm Event: 100 Year Scenario: Post 100 year Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 754.000 ft Initial) Volume(Initial) 0.000 ft3 Flow(Initial Outlet) 0.000 ft3/s Flow(Initial Infiltration) 0.000 ft3/s Flow(Initial,Total) 0.000 ft3/s Time Increment 1.00 min Inflow/Outflow Hydrograph Summary Flow(Peak In) 124.710 ft3/s Time to Peak(Flow, In) 721.00 min Flow(Peak Outlet) 19.140 ft3/s Time to Peak(Flow, Outlet) 755.00 min Elevation (Water Surface, 758.899 ft Peak) Volume(Peak) 184,774.428 ft3 Mass Balance(ft3) Volume(Initial) 0.000 ft3 Volume(Total Inflow) 354,400.000 ft3 Volume(Total Infiltration) 0.000 ft3 Volume(Total Outlet 278,527.000 ft3 Outflow) Volume(Retained) 75,696.000 ft3 Volume(Unrouted) -177.000 ft3 Error(Mass Balance) 0.1 % 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 PRECIPITATION DATA Shelby Rucker TRU-23006 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Above NP 6/5/2024 STAGE-STORAGE FUNCTION-ABOVE NORMAL POOL Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 714.00 0.00 25,801 714.50 0.50 29,016 27409 13704 13704 0.50 715.00 1.00 30,011 29514 14757 28461 1.00 716.00 2.00 32,043 31027 31027 59488 1.98 717.00 3.00 34,132 33088 33088 92576 2.99 718.00 4.00 36,277 35205 35205 127780 4.04 719.00 5.00 38,479 37378 37378 165158 5.13 720.00 6.00 40,738 39609 39609 204767 6.28 Storage vs.Stage 140000 120000 - y=28601 x1.m18 100000 - Rz=0.9998 I60000 - iii 40000 - 20000 - 0 1 1 11 0.00 1.00 2.00 3.00 4.00 5.00 Stage(feet) KS= 28601 b= 1.0718 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Main Pool 6/5/2024 STAGE-STORAGE FUNCTION-MAIN POOL Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) - (CF) (feet) 708.00 -1.00 12,918 709.00 0.00 13,799 Sediment Storage 711.00 2.00 15,643 I 14721 29442 29442 2.01 712.00 3.00 16,607 I 16125 16125 45567 2.98 713.00 4.00 17,598 17103 17103 62670 3.98 713.50 4.50 18,104 17851 8926 71595 4.49 714.00 5.00 I 20,037 19071 9535 I 81130 I 5.03 *surface area and volume used for avg.depth calculation Storage vs.Stage 90000 80000 — y=13642x1 to32 70000 — R2=0.9997 60000 LL — 50000 ts rn co 40000 rn 30000 20000 — 10000 — 0 r i 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Stage(feet) KS= 13642 b= 1.1032 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Forebay 6/5/2024 STAGE-STORAGE FUNCTION-FOREBAY Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) - (CF) (feet) 707.00 -1.00 337 708.00 0.00 613 Sediment Storage 709.00 1.00 999 806 806 806 1.00 711.00 3.00 1,966 1483 2965 3771 2.94 712.00 4.00 2,550 2258 2258 6029 4.07 713.00 5.00 3,200 2875 2875 8904 5.34 713.50 5.50 3,552 3376 1688 10592 6.02 714.00 6.00 4,833 4193 2096 12688 6.83 Storage vs.Stage 7000 - 6000 - y=800.855x1.4385 5000 - R2=0.9979 I 2000 - 1000 - 0 1 1 I 1 I 0.00 1.00 2.00 3.00 4.00 5.00 Stage(feet) K5= 800.8 b= 1.4385 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Forebay 6/5/2024 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 Volume Calculation 6/5/2024 TOTAL VOLUME OF FACILITY Volume of Main Pool below Normal Pool= 81,130 cf Volume of Forebay below Normal Pool= 12,688 cf Total Volume Below Normal Pool= 93,819 cf Total Volume Above Normal Pool= 204,767 cf Total Volume of Facility= 298,585 cf 1pREBAY PERCENTAGE OF PERMANENT POOL VOLUMrlil Per NCDEQ Minimum Design Criteria,the forebay volume should equal approximately 15-20%of the main pool volume. Total Main Pool Volume= 81,130 cf Provided Forebay Volume= 12,688 cf Provided Forebay Volume%= 16% Main Pool Volume at Normal Pool= 81,130 cf Main Pool Area at Normal Pool= 20,037 sf Average Depth= 4.05 ft Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU 23006 Surface Area Calculation 6/5/2024 WET DETENTION BASIN SUMMARY Enter the drainage area characteristics==> Total drainage area to pond= 18.17 acres Total impervious area to pond= 8.31 acres Note The basin must be sized to treat all impervious surface runoff draining into the pond,not just the impervious surface from on-site development. Drainage area= 18.17 acres @ 45.7% impervious Estimate the surface area required at pond normal pool elevation==> Wet Detention Basins are based on an minimum average depth of = 4.05 feet(Calculated) 4.0 4.05 5.0 Lower Boundary=> 40.0 1.24 1.09 Site%impervious=> 45.7 1.39 1.39 1.22 Upper Boundary=> 50.0 1.51 1.31 Therefore,SA/DA required= 1.39 Surface area required for main pool at normal pool= 10,965 ft2 = 0.25 acres Surface area provided for main pool at normal pool= 20,037 ft2 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 WQV Calculation 6/5/2024 DETERMINATION OF WATER QUALITY VOLUME WQ v=(P)(R v)(A)/12 where, WQv=water quality volume(in acre-ft) Rv=0.05+0.009(1)where I is percent impervious cover A=area in acres P=rainfall(in inches) Input data: Total area,A= 18.17 acres Impervious area= 8.31 acres Percent impervious cover,I= 45.7 % Rainfall,P= 1.00 inches Calculated values: Rv= 0.46 WQv= 0.70 acre-ft = 30431 cf. ASSOCIATED DEPTH IN POND WQv= 30431 cf. Stage/Storage Data: Ks= 28601 b= 1.072 Zo= 714.00 Volume in 1"rainfall= 30431 cf. Calculated values: Depth of WQv in Basin= 1.06 ft = 12.72 inches Elevation= 715.06 ft Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 WQV Drawdown Calculation 6/5/2024 DRAWDOWN ORIFICE DESIGN D orifice= 2.25 inch #orifices= 1 Ks= 28601 b= 1.0718 Cd orifice= 0.60 Normal Pool Elevation= 714.00 feet Volume @ Normal Pool= 0 cf Orifice Invert= 714.00 feet WSEL @ 1"Runoff Volume= 715.06 feet WSEL Vol.Stored Orifice Flow Avg.Flow Incr.Vol. Incr.Time (feet) (cf) (cfs) (cfs) (cf) (sec) 715.06 30431 0.130 714.97 27559 0.124 0.127 2872 22573 714.87 24708 0.117 0.121 2852 23655 714.78 21878 0.110 0.113 2830 24932 714.69 19073 0.102 0.106 2805 26472 714.59 16295 0.094 0.098 2778 28383 714.50 13548 0.084 0.089 2746 30849 714.40 10839 0.074 0.079 2709 34214 714.31 8174 0.062 0.068 2664 39232 714.22 5568 0.047 0.054 2607 48055 714.12 3043 0.022 0.034 2525 73747 Drawdown Time= 4.08 days By comparison,if calculated by the average head over the orifice (assuming average head is one-third the total depth),the result would be: Average driving head on orifice= 0.322 feet Orifice composite loss coefficient= 0.600 Cross-sectional area of siphon= 0.028 sf Q= 0.0754 cfs Drawdown Time=Volume/Flowrate/86400(sec/day) Drawdown Time= 4.67 days 'J MCADAMS RISER ANTI-FLOTATION CALCULATION Project Name: Shelby Rucker Date: 6/5/2024 Project Number: TRU-23006 Calculated By: S.Woodard,PE Facility ID: SCM B INPUT DATA Inside Length= 5.00 ft Inside Width= 5.00 ft Wall Thickness= 6.00 in Standard Base Length= 6.00 ft Standard Base Width= 6.00 ft Standard Base Thickness= 6.00 in Inside Height of Riser= 4.50 ft Concrete Unit Weight= 142.00 pcf I Unit weight of manhole concrete is 142 pcf per NC Products Outside Diameter of Barrel= 36.00 in Drain Pipe(if present)= 0.00 in CONCRETE PRESENT IN RISER STRUCTURE Riser Walls= 49.500 cf Standard Base of Riser= 18.000 cf Less Opening for Barrel= 3.534 cf Less Opening for Drain Pipe= 0.000 cf Total Concrete Less Openings= 63.966 cf Weight of Concrete= 9,083 lbs AMOUNT OF WATER DISPLACED BY RISER STRUCTURE Displacement by Concrete= 63.966 cf Displacement by Open Air= 112.500 cf Total Water Displaced= 176.466 cf Weight of Water Displaced= 11,011 lbs AMOUNT OF CONCRETE TO ADD TO RISER STRUCTURE Safety Factor= 1.15 I Recommend 1.15 or higher Add'I Weight for Bouyancy= 3,580 lbs Bouyant Weight of Concrete= 79.60 pcf Bouyant Weight w/SF= 69.22 pcf Add'I Concrete to Add= 51.722 cf Less Standard Base= 18.000 cf New Base Design Required= 69.722 cf ANTI FLOTATION BLOCK DESIGN CALCULATIONS AF Block Length= 8.00 ft AF Block Width= 8.00 ft AF Block Thickness= 14.00 in AF Block Provided= 74.667 cf Total Concrete Present= 120.632 cf = 17,130 lbs '� MCADAMS DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Project: Shelby Rucker Date: 5/31/2024 Project Number: TRU-23006 Calculated By: LPM Outlet Number: SCM B Outlet flowrate= 9.048 cfs Pipe diameter= 36 inches Number of pipes= 1 Pipe separation= 0 feet Outlet Velocity= 7.77 ft/sec Figure 8.06.b.1 25 Znnt 7 20 '4,' 15 w N� Zone 5 10 Zone 4 :--....__...._...._____. • 7.8 ft/sec I 5 Zone l Zone 2 --________ - 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 2 Outlet pipe diameter 36 in. Length= 18.0 ft. Outlet flowrate 9.0 cfs Width= 10.2 ft. Outlet velocity 7.8 ft/sec Stone diameter= 6 in. Material= Class B Thickness= 18 in. Zone Material Diameter Thickness Length Width 1 Class A 3 12 4xD(o) 3xD(o) 2 Class B 6 18 6 x D(o) 3 x D(o) 3 Class 13 24 8 x D(o) 3 x D(o) 4 Class 13 24 8xD(o) 3xD(o) 5 Class 11 23 36 10 x D(o) 3 x D(o) 6 Class 11 23 36 10 x D(o) 3 x D(o) 7 Special study required 1. Calculations based on NY DOT method-Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full flow velocity �I MCADAM Subsection: Elevation-Area Volume Curve Return Event: 1 years Label: SCM B Storm Event: 1 year Scenario: Post 1 year 24 hr Elevation Planimeter Area Al+A2+sqr Volume Volume(Total) (ft) (ft2) (ft2) (A1*A2) (ft3) (ft3) (ft2) 714.000 0.000 25,801.00 0.00 0.000 0.000 714.500 0.000 29,016.00 82,178.32 13,696.000 13,696.000 715.000 0.000 30,011.00 88,536.31 14,756.000 28,452.000 716.000 0.000 32,043.00 93,064.36 31,021.000 59,474.000 717.000 0.000 34,132.00 99,246.01 33,082.000 92,556.000 718.000 0.000 36,277.00 105,597.16 35,199.000 127,755.000 719.000 0.000 38,479.00 112,117.78 37,373.000 165,128.000 720.000 0.000 40,738.00 118,809.39 39,603.000 204,731.000 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �� MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM B Storm Event: 1 year Scenario: Post 1 year 24 hr Requested Pond Water Surface Elevations Minimum (Headwater) 714.000 ft Increment(Headwater) 0.500 ft Maximum (Headwater) 720.000 ft Outlet Connectivity Structure Type Outlet ID Direction Outfall El E2 (ft) (ft) Orifice-Area SCM B- 10 Forward SCM B 716.700 720.000 YR Orifice Culvert Rectangular Weir SCM B-25 Forward SCM B 717.900 720.000 Yr Weir Culvert Inlet Box SCM B Forward SCM B 718.400 720.000 Riser Culvert Orifice-Circular SCM B- Forward SCM B 714.000 720.000 WQV Culvert Orifice Culvert-Circular SCM B Forward TW 713.900 720.000 Culvert Tailwater Settings Tailwater (N/A) (N/A) 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �� MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM B Storm Event: 1 year Scenario: Post 1 year 24 hr Structure ID: SCM B Culvert Structure Type: Culvert-Circular Number of Barrels 1 Diameter 36.000 in Length 55.00 ft Length (Computed Barrel) 55.01 ft Slope(Computed) 0.016 ft/ft Outlet Control Data Manning's n 0.013 Ke 0.20 Kb 0.01 Kr 0.00 Convergence Tolerance 0.001 ft Inlet Control Data Equation Form Form 1 K 0.0045 M 2.0000 C 0.0317 Y 0.6900 T1 ratio(HW/D) 1.09 T2 ratio(HW/D) 1.19 Slope Correction Factor -0.50 Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 &T2... T1 Elevation 717.161 ft T1 Flow 42.851 ft3/s T2 Elevation 717.467 ft T2 Flow 48.973 ft3/s 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �� MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM B Storm Event: 1 year Scenario: Post 1 year 24 hr Structure ID: SCM B Riser Structure Type: Inlet Box Number of Openings 1 Elevation 718.400 ft Orifice Area 25.000 ft2 Orifice Coefficient 0.60 Weir Length 20.00 ft Weir Coefficient 3.00(ft^0.5)/s K Reverse 1.00 Manning's n 0.00 Key, Charged Riser 0.00 Weir Submergence False Orifice H to crest False Structure ID: SCM B-WQV Orifice Structure Type: Orifice-Circular Number of Openings 1 Elevation 714.000 ft Orifice Diameter 2.250 in Orifice Coefficient 0.60 Structure ID: SCM B- 10 YR Orifice Structure Type: Orifice-Area Number of Openings 1 Elevation 716.700 ft Orifice Area 2.000 ft2 Top Elevation 717.200 ft Datum Elevation 716.950 ft Orifice Coefficient 0.60 Structure ID: SCM B-25 Yr Weir Structure Type: Rectangular Weir Number of Openings 1 Elevation 717.900 ft Weir Length 4.00 ft Weir Coefficient 3.00(ft^0.5)/s Structure ID: TW Structure Type: TW Setup, DS Channel Tailwater Type Free Outfall Convergence Tolerances Maximum Iterations 30 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �� MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM B Storm Event: 1 year Scenario: Post 1 year 24 hr Convergence Tolerances Tailwater Tolerance 0.010 ft (Minimum) Tailwater Tolerance 0.500 ft (Maximum) Headwater Tolerance 0.010 ft (Minimum) Headwater Tolerance 0.500 ft (Maximum) Flow Tolerance(Minimum) 0.001 ft3/s Flow Tolerance(Maximum) 10.000 ft3/s 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �J MCADAMS Subsection: Composite Rating Curve Return Event: 1 years Label: SCM B Storm Event: 1 year Scenario: Post 1 year 24 hr Composite Outflow Summary Water Surface Flow Tailwater Elevation Convergence Error Contributing Structures Elevation (ft3/s) (ft) (ft) (ft) 714.000 0.000 (N/A) 0.000 (no Q: SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B Riser,SCM B- WQV Orifice,SCM B Culvert) 714.500 0.084 (N/A) 0.000 SCM B-WQV Orifice,SCM B Culvert (no Q: SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B Riser) 715.000 0.123 (N/A) 0.000 SCM B-WQV Orifice,SCM B Culvert (no Q: SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B Riser) 715.500 0.156 (N/A) 0.000 SCM B-WQV Orifice,SCM B Culvert (no Q: SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B Riser) 716.000 0.182 (N/A) 0.000 SCM B-WQV Orifice,SCM B Culvert (no Q: SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B Riser) 716.500 0.206 (N/A) 0.000 SCM B-WQV Orifice,SCM B Culvert (no Q: SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B Riser) 716.700 0.214 (N/A) 0.000 SCM B-WQV Orifice,SCM B Culvert (no Q: SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B Riser) 717.000 3.090 (N/A) 0.000 SCM B- 10 YR Orifice,SCM B-WQV 1 Orifice,SCM B Culvert (no Q: SCM B-25 Yr Weir,SCM B Riser) 717.500 7.346 (N/A) 0.000 SCM B- 10 YR Orifice,SCM B-WQV Orifice,SCM B Culvert (no 1 Q: SCM B-25 Yr Weir,SCM B Riser) 717.900 9.598 (N/A) 0.000 SCM B- 10 YR Orifice,SCM B-WQV Orifice,SCM B Culvert (no Q: SCM B-25 Yr Weir,SCM B Riser) 718.000 10.450 (N/A) 0.000 SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B-WQV Orifice,SCM B Culvert (no Q: SCM B Riser) 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �J MCADAMS Subsection: Composite Rating Curve Return Event: 1 years Label: SCM B Storm Event: 1 year Scenario: Post 1 year 24 hr Composite Outflow Summary Water Surface Flow Tailwater Elevation Convergence Error Contributing Structures Elevation (ft3/s) (ft) (ft) (ft) 718.400 16.036 (N/A) 0.000 SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B-WQV Orifice,SCM B Culvert (no Q: SCM B Riser) 718.500 19.652 (N/A) 0.000 SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B Riser,SCM B- WQV Orifice,SCM B Culvert 719.000 52.754 (N/A) 0.000 SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B Riser,SCM B- WQV Orifice,SCM B Culvert 719.500 74.720 (N/A) 0.000 SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B Riser,SCM B- WQV Orifice,SCM B Culvert 720.000 79.942 (N/A) 0.000 SCM B Riser,SCM B Culvert (no Q: SCM B- 10 YR Orifice,SCM B-25 Yr Weir,SCM B-WQV Orifice) 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �I MCADAMS Subsection: Level Pool Pond Routing Summary Return Event: 1 years Label: SCM B (IN) Storm Event: 1 year Scenario: Post 1 year 24 hr Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 714.000 ft Initial) Volume(Initial) 0.000 ft3 Flow(Initial Outlet) 0.000 ft3/s Flow(Initial Infiltration) 0.000 ft3/s Flow(Initial,Total) 0.000 ft3/s Time Increment 1.00 min Inflow/Outflow Hydrograph Summary Flow(Peak In) 40.295 ft3/s Time to Peak(Flow, In) 721.00 min Flow(Peak Outlet) 0.212 ft3/s Time to Peak(Flow, Outlet) 1,445.00 min Elevation (Water Surface, 716.645 ft Peak) Volume(Peak) 80,576.223 ft3 Mass Balance(ft3) Volume(Initial) 0.000 ft3 Volume(Total Inflow) 89,171.000 ft3 Volume(Total Infiltration) 0.000 ft3 Volume(Total Outlet 64,754.000 ft3 Outflow) Volume(Retained) 24,361.000 ft3 Volume(Unrouted) -56.000 ft3 Error(Mass Balance) 0.1 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �I MCADAMS Subsection: Level Pool Pond Routing Summary Return Event: 100 years Label: SCM B (IN) Storm Event: 100 Year Scenario: Post 100 year Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 714.000 ft Initial) Volume(Initial) 0.000 ft3 Flow(Initial Outlet) 0.000 ft3/s Flow(Initial Infiltration) 0.000 ft3/s Flow(Initial,Total) 0.000 ft3/s Time Increment 1.00 min Inflow/Outflow Hydrograph Summary Flow(Peak In) 136.434 ft3/s Time to Peak(Flow, In) 721.00 min Flow(Peak Outlet) 50.360 ft3/s Time to Peak(Flow, Outlet) 730.00 min Elevation (Water Surface, 718.964 ft Peak) Volume(Peak) 163,737.495 ft3 Mass Balance(ft3) Volume(Initial) 0.000 ft3 Volume(Total Inflow) 391,402.000 ft3 Volume(Total Infiltration) 0.000 ft3 Volume(Total Outlet 303,664.000 ft3 Outflow) Volume(Retained) 87,612.000 ft3 Volume(Unrouted) -126.000 ft3 Error(Mass Balance) 0.0 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 PRECIPITATION DATA Shelby Rucker TRU-23006 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Above NP 6/5/2024 STAGE-STORAGE FUNCTION-ABOVE NORMAL POOL Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 729.00 0.00 26,435 729.50 0.50 30,622 28529 14264 14264 0.50 730.00 1.00 31,909 31266 15633 29897 0.99 731.00 2.00 34,525 33217 33217 63114 1.98 732.00 3.00 37,197 35861 35861 98975 2.99 733.00 4.00 39,926 38562 38562 137537 4.05 734.00 5.00 42,712 41319 41319 178856 5.15 735.00 6.00 45,554 44133 44133 222989 6.31 Storage vs.Stage 160000 - 140000 - y=30064x1 0876 120000 - Rz=0.9998 6 100000 - , 80000 - m . 60000 - co 40000 - 20000 - 0 1 1 11 0.00 1.00 2.00 3.00 4.00 5.00 Stage(feet) Ks= 30064 b= 1.0876 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Main Pool 6/5/2024 STAGE-STORAGE FUNCTION-MAIN POOL Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) - (CF) (feet) 723.00 -1.00 9,324 724.00 0.00 10,424 Sediment Storage 726.00 2.00 12,723 I 11574 23147 23147 2.01 727.00 3.00 13,921 I 13322 13322 36469 2.98 728.00 4.00 15,151 14536 14536 51005 3.98 728.50 4.50 15,779 15465 7733 58738 4.49 729.00 5.00 I 18,531 17155 8578 I 67315 I 5.05 *surface area and volume used for avg.depth calculation Storage vs.Stage 80000 70000 — 60000 y=10287x1 16 R2=0.9994 50000 & 40000 2 30000 20000 10000 — 0 r 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Stage(feet) KS= 10287 b= 1.1600 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Forebay 6/5/2024 STAGE-STORAGE FUNCTION-FOREBAY Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) - (CF) (feet) 722.00 -1.00 363 723.00 0.00 611 Sediment Storage 724.00 1.00 928 770 770 770 1.00 726.00 3.00 1,743 1336 2671 3441 2.93 727.00 4.00 2,240 1992 1992 5432 4.07 728.00 5.00 2,796 2518 2518 7950 5.35 728.50 5.50 3,096 2946 1473 9423 6.04 729.00 6.00 4,267 3682 1841 11264 6.86 Storage vs.Stage 6000 - 5000 - y=764.63x1.3968 R2=0.9979 4000 - ii & 3000 - E `o rn 2000 - 1000 - 01 1 11 0.00 1.00 2.00 3.00 4.00 5.00 Stage(feet) KS= 764.6 b= 1.3968 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 SSFxn Forebay 6/5/2024 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 Volume Calculation 6/5/2024 TOTAL VOLUME OF FACILITY Volume of Main Pool below Normal Pool= 67,315 cf Volume of Forebay below Normal Pool= 11,264 cf Total Volume Below Normal Pool= 78,579 cf Total Volume Above Normal Pool= 222,989 cf Total Volume of Facility= 301,567 cf 1pREBAY PERCENTAGE OF PERMANENT POOL VOLUMrlil Per NCDEQ Minimum Design Criteria,the forebay volume should equal approximately 15-20%of the main pool volume. Total Main Pool Volume= 67,315 cf Provided Forebay Volume= 11,264 cf Provided Forebay Volume%= 17% Main Pool Volume at Normal Pool= 67,315 cf Main Pool Area at Normal Pool= 18,531 sf Average Depth= 3.63 ft Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU 23006 Surface Area Calculation 6/5/2024 WET DETENTION BASIN SUMMARY Enter the drainage area characteristics==> Total drainage area to pond= 23.45 acres Total impervious area to pond= 9.65 acres Note The basin must be sized to treat all impervious surface runoff draining into the pond,not just the impervious surface from on-site development. Drainage area= 23.45 acres @ 41.2% impervious Estimate the surface area required at pond normal pool elevation==> Wet Detention Basins are based on an minimum average depth of = 3.63 feet(Calculated) 3.0 3.63 4.0 Lower Boundary=> 40.0 1.51 1.24 Site%impervious=> 41.2 1.54 1.37 1.27 Upper Boundary=> 50.0 1.79 1.51 Therefore,SA/DA required= 1.37 Surface area required for main pool at normal pool= 14,003 ft2 = 0.32 acres Surface area provided for main pool at normal pool= 18,531 ft2 Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU-23006 WQV Calculation 6/5/2024 DETERMINATION OF WATER QUALITY VOLUME WQ v=(P)(R v)(A)/12 where, WQv=water quality volume(in acre-ft) Rv=0.05+0.009(1)where I is percent impervious cover A=area in acres P=rainfall(in inches) Input data: Total area,A= 23.45 acres Impervious area= 9.65 acres Percent impervious cover,I= 41.2 % Rainfall,P= 1.00 inches Calculated values: Rv= 0.42 WQv 0.82 acre-ft = 35786 cf. ASSOCIATED DEPTH IN POND WQv= 35786 cf. Stage/Storage Data: Ks= 30064 b= 1.088 Zo= 729.00 Volume in 1"rainfall= 35786 cf. Calculated values: Depth of WQv in Basin= 1.17 ft = 14.08 inches Elevation= 730.17 ft Shelby Rucker STORMWATER CONTROL MEASURE LIAM MCNALLY,El TRU 23006 WQV Drawdown Calculation 6/5/2024 DRAWDOWN ORIFICE DESIGN D orifice= 2.25 inch #orifices= 1 Ks= 30064 b= 1.0876 Cd orifice= 0.60 Normal Pool Elevation= 729.00 feet Volume @ Normal Pool= 0 cf Orifice Invert= 729.00 feet WSEL @ 1"Runoff Volume= 730.17 feet WSEL Vol.Stored Orifice Flow Avg.Flow Incr.Vol. Incr.Time (feet) (cf) (cfs) (cfs) (cf) (sec) 730.17 35786 0.138 730.07 32376 0.131 0.135 3410 25340 729.97 28995 0.124 0.128 3381 26494 729.86 25645 0.116 0.120 3350 27850 729.76 22330 0.108 0.112 3315 29477 729.66 19055 0.100 0.104 3275 31484 729.55 15824 0.090 0.095 3231 34052 729.45 12646 0.079 0.085 3178 37517 729.35 9532 0.067 0.073 3114 42593 729.24 6499 0.052 0.059 3033 51220 729.14 3579 0.027 0.039 2920 74668 Drawdown Time= 4.41 days By comparison,if calculated by the average head over the orifice (assuming average head is one-third the total depth),the result would be: Average driving head on orifice= 0.360 feet Orifice composite loss coefficient= 0.600 Cross-sectional area of siphon= 0.028 sf Q= 0.0798 cfs Drawdown Time=Volume/Flowrate/86400(sec/day) Drawdown Time= 5.19 days 'J MCADAMS RISER ANTI-FLOTATION CALCULATION Project Name: Shelby Rucker Date: 6/5/2024 Project Number: TRU-23006 Calculated By: S.Woodard,PE Facility ID: SCM C INPUT DATA Inside Length= 5.00 ft Inside Width= 5.00 ft Wall Thickness= 6.00 in Standard Base Length= 6.00 ft Standard Base Width= 6.00 ft Standard Base Thickness= 6.00 in Inside Height of Riser= 4.30 ft Concrete Unit Weight= 142.00 pcf I Unit weight of manhole concrete is 142 pcf per NC Products Outside Diameter of Barrel= 36.00 in Drain Pipe(if present)= 0.00 in CONCRETE PRESENT IN RISER STRUCTURE Riser Walls= 47.300 cf Standard Base of Riser= 18.000 cf Less Opening for Barrel= 3.534 cf Less Opening for Drain Pipe= 0.000 cf Total Concrete Less Openings= 61.766 cf Weight of Concrete= 8,771 lbs AMOUNT OF WATER DISPLACED BY RISER STRUCTURE Displacement by Concrete= 61.766 cf Displacement by Open Air= 107.500 cf Total Water Displaced= 169.266 cf Weight of Water Displaced= 10,562 lbs AMOUNT OF CONCRETE TO ADD TO RISER STRUCTURE Safety Factor= 1.15 I Recommend 1.15 or higher Add'I Weight for Bouyancy= 3,376 lbs Bouyant Weight of Concrete= 79.60 pcf Bouyant Weight w/SF= 69.22 pcf Add'I Concrete to Add= 48.771 cf Less Standard Base= 18.000 cf New Base Design Required= 66.771 cf ANTI FLOTATION BLOCK DESIGN CALCULATIONS AF Block Length= 8.00 ft AF Block Width= 8.00 ft AF Block Thickness= 13.00 in AF Block Provided= 69.333 cf Total Concrete Present= 113.099 cf = 16,060 lbs '� MCADAMS DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Project: Shelby Rucker Date: 5/31/2024 Project Number: TRU-23006 Calculated By: LPM Outlet Number: SCM C Outlet flowrate= 9.386 cfs Pipe diameter= 36 inches Number of pipes= 1 Pipe separation= 0 feet Outlet Velocity= 8.87 ft/sec Figure 8.06.b.1 25 I I I I 7nne 7 20 '� �� ------ Zone � --_— —. 15 _ p \ Zone 5 10 0 GJ ^..odd --\ 5 �� zoo Zone 1 _ Zone 2 —� 0 — —� 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter(ft) Zone from graph above= 2 Outlet pipe diameter 36 in. Length= 18.0 ft. Outlet flowrate 9.4 cfs Width= 10.2 ft. Outlet velocity 8.9 ft/sec Stone diameter= 6 in. Material= Class B Thickness= 18 in. Zone Material Diameter Thickness Length Width 1 Class A 3 12 4xD(o) 3xD(o) 2 Class B 6 18 6 x D(o) 3 x D(o) 3 Class 13 24 8 x D(o) 3 x D(o) 4 Class 13 24 8xD(o) 3xD(o) 5 Class 11 23 36 10 x D(o) 3 x D(o) 6 Class 11 23 36 10 x D(o) 3 x D(o) 7 Special study required 1. Calculations based on NY DOT method-Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full flow velocity �I MCADAM Subsection: Elevation-Area Volume Curve Return Event: 1 years Label: SCM C Storm Event: 1 year Scenario: Post 1 year 24 hr Elevation Planimeter Area Al+A2+sqr Volume Volume(Total) (ft) (ft2) (ft2) (A1*A2) (ft3) (ft3) (ft2) 729.000 0.000 26,435.00 0.00 0.000 0.000 729.500 0.000 30,622.00 85,508.58 14,251.000 14,251.000 730.000 0.000 31,909.00 93,789.88 15,632.000 29,883.000 731.000 0.000 34,525.00 99,625.24 33,208.000 63,091.000 732.000 0.000 37,197.00 107,558.11 35,853.000 98,944.000 733.000 0.000 39,926.00 115,660.35 38,553.000 137,498.000 734.000 0.000 42,712.00 123,933.51 41,311.000 178,809.000 735.000 0.000 45,554.00 132,376.12 44,125.000 222,934.000 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �J MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM C Storm Event: 1 year Scenario: Post 1 year 24 hr Requested Pond Water Surface Elevations Minimum (Headwater) 729.000 ft Increment(Headwater) 0.500 ft Maximum (Headwater) 735.000 ft Outlet Connectivity Structure Type Outlet ID Direction Outfall El E2 (ft) (ft) Orifice-Area SCM C- 10 Forward SCM C 731.600 735.000 Yr Orifice Culvert Rectangular Weir SCM C-25 Forward SCM C 732.800 735.000 YR Weir Culvert Inlet Box SCM C Forward SCM C 733.200 735.000 Riser Culvert Orifice-Circular SCM C- Forward SCM C 729.000 735.000 WQV Culvert Orifice Culvert-Circular SCM C Forward TW 728.900 735.000 Culvert Tailwater Settings Tailwater (N/A) (N/A) 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �� MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM C Storm Event: 1 year Scenario: Post 1 year 24 hr Structure ID: SCM C Culvert Structure Type: Culvert-Circular Number of Barrels 1 Diameter 36.000 in Length 40.00 ft Length (Computed Barrel) 40.01 ft Slope(Computed) 0.022 ft/ft Outlet Control Data Manning's n 0.013 Ke 0.20 Kb 0.01 Kr 0.00 Convergence Tolerance 0.001 ft Inlet Control Data Equation Form Form 1 K 0.0045 M 2.0000 C 0.0317 Y 0.6900 T1 ratio(HW/D) 1.08 T2 ratio(HW/D) 1.19 Slope Correction Factor -0.50 Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 &T2... T1 Elevation 732.152 ft T1 Flow 42.851 ft3/s T2 Elevation 732.458 ft T2 Flow 48.973 ft3/s 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �J MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM C Storm Event: 1 year Scenario: Post 1 year 24 hr Structure ID: SCM C Riser Structure Type: Inlet Box Number of Openings 1 Elevation 733.200 ft Orifice Area 25.000 ft2 Orifice Coefficient 0.60 Weir Length 20.00 ft Weir Coefficient 3.00(ft^0.5)/s K Reverse 1.00 Manning's n 0.00 Key, Charged Riser 0.00 Weir Submergence False Orifice H to crest False Structure ID: SCM C-WQV Orifice Structure Type: Orifice-Circular Number of Openings 1 Elevation 729.000 ft Orifice Diameter 2.250 in Orifice Coefficient 0.60 Structure ID: SCM C- 10 Yr Orifice Structure Type: Orifice-Area Number of Openings 1 Elevation 731.600 ft Orifice Area 2.000 ft2 Top Elevation 732.100 ft Datum Elevation 731.850 ft Orifice Coefficient 0.60 Structure ID: SCM C-25 YR Weir Structure Type: Rectangular Weir Number of Openings 1 Elevation 732.800 ft Weir Length 4.00 ft Weir Coefficient 3.00(ft^0.5)/s Structure ID: TW Structure Type: TW Setup, DS Channel Tailwater Type Free Outfall Convergence Tolerances Maximum Iterations 30 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �J MCADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM C Storm Event: 1 year Scenario: Post 1 year 24 hr Convergence Tolerances Tailwater Tolerance 0.010 ft (Minimum) Tailwater Tolerance 0.500 ft (Maximum) Headwater Tolerance 0.010 ft (Minimum) Headwater Tolerance 0.500 ft (Maximum) Flow Tolerance(Minimum) 0.001 ft3/s Flow Tolerance(Maximum) 10.000 ft3/s 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �I MCADAMS Subsection: Composite Rating Curve Return Event: 1 years Label: SCM C Storm Event: 1 year Scenario: Post 1 year 24 hr Composite Outflow Summary Water Surface Flow Tailwater Elevation Convergence Error Contributing Structures Elevation (ft3/s) (ft) (ft) (ft) 729.000 0.000 (N/A) 0.000 (no Q: SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C Riser,SCM C- WQV Orifice,SCM C Culvert) 729.500 0.084 (N/A) 0.000 SCM C-WQV Orifice,SCM C Culvert (no Q: SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C Riser) 730.000 0.123 (N/A) 0.000 SCM C-WQV Orifice,SCM C Culvert (no Q: SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C Riser) 730.500 0.157 (N/A) 0.000 SCM C-WQV Orifice,SCM C Culvert (no Q: SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C Riser) 731.000 0.182 (N/A) 0.000 SCM C-WQV Orifice,SCM C Culvert (no Q: SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C Riser) 731.500 0.206 (N/A) 0.000 SCM C-WQV Orifice,SCM C Culvert (no Q: SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C Riser) 731.600 0.210 (N/A) 0.000 SCM C-WQV Orifice,SCM C Culvert (no Q: SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C Riser) 732.000 4.045 (N/A) 0.000 SCM C- 10 Yr Orifice,SCM C-WQV Orifice,SCM C Culvert (no Q: SCM C-25 YR Weir,SCM C Riser) 732.500 7.969 (N/A) 0.000 SCM C- 10 Yr Orifice,SCM C-WQV Orifice,SCM C Culvert (no Q: SCM C-25 YR Weir,SCM C Riser) 732.800 9.598 (N/A) 0.000 SCM C- 10 Yr Orifice,SCM C-WQV Orifice,SCM C Culvert (no Q: SCM C-25 YR Weir,SCM C Riser) 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �I MCADAMS Subsection: Composite Rating Curve Return Event: 1 years Label: SCM C Storm Event: 1 year Scenario: Post 1 year 24 hr Composite Outflow Summary Water Surface Flow Tailwater Elevation Convergence Error Contributing Structures Elevation (ft3/s) (ft) (ft) (ft) 733.000 11.611 (N/A) 0.000 SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C-WQV Orifice,SCM C Culvert (no Q: SCM C Riser) 733.200 14.437 (N/A) 0.000 SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C-WQV Orifice,SCM C Culvert (no Q: SCM C Riser) 733.500 29.448 (N/A) 0.000 SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C Riser,SCM C- WQV Orifice,SCM C Culvert 734.000 63.014 (N/A) 0.000 SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C Riser,SCM C- WQV Orifice,SCM C Culvert 734.500 74.947 (N/A) 0.000 SCM C Riser,SCM C Culvert (no Q: SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C-WQV Orifice) 735.000 80.037 (N/A) 0.000 SCM C Riser,SCM C Culvert (no Q: SCM C- 10 Yr Orifice,SCM C-25 YR Weir,SCM C-WQV Orifice) 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �I MCADAMS Subsection: Level Pool Pond Routing Summary Return Event: 1 years Label: SCM C (IN) Storm Event: 1 year Scenario: Post 1 year 24 hr Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 729.000 ft Initial) Volume(Initial) 0.000 ft3 Flow(Initial Outlet) 0.000 ft3/s Flow(Initial Infiltration) 0.000 ft3/s Flow(Initial,Total) 0.000 ft3/s Time Increment 1.00 min Inflow/Outflow Hydrograph Summary Flow(Peak In) 38.929 ft3/s Time to Peak(Flow, In) 722.00 min Flow(Peak Outlet) 0.206 ft3/s Time to Peak(Flow, Outlet) 1,445.00 min Elevation (Water Surface, 731.512 ft Peak) Volume(Peak) 81,118.044 ft3 Mass Balance(ft3) Volume(Initial) 0.000 ft3 Volume(Total Inflow) 89,267.000 ft3 Volume(Total Infiltration) 0.000 ft3 Volume(Total Outlet 63,524.000 ft3 Outflow) Volume(Retained) 25,673.000 ft3 Volume(Unrouted) -70.000 ft3 Error(Mass Balance) 0.1 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024 �I MCADAMS Subsection: Level Pool Pond Routing Summary Return Event: 100 years Label: SCM C (IN) Storm Event: 100 Year Scenario: Post 100 year Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 729.000 ft Initial) Volume(Initial) 0.000 ft3 Flow(Initial Outlet) 0.000 ft3/s Flow(Initial Infiltration) 0.000 ft3/s Flow(Initial,Total) 0.000 ft3/s Time Increment 1.00 min Inflow/Outflow Hydrograph Summary Flow(Peak In) 160.274 ft3/s Time to Peak(Flow, In) 721.00 min Flow(Peak Outlet) 60.145 ft3/s Time to Peak(Flow, Outlet) 730.00 min Elevation (Water Surface, 733.957 ft Peak) Volume(Peak) 176,986.289 ft3 Mass Balance(ft3) Volume(Initial) 0.000 ft3 Volume(Total Inflow) 454,774.000 ft3 Volume(Total Infiltration) 0.000 ft3 Volume(Total Outlet 363,067.000 ft3 Outflow) Volume(Retained) 91,525.000 ft3 Volume(Unrouted) -182.000 ft3 Error(Mass Balance) 0.0 2021210730 S.Woodard,PE TRU-23006-Shelby Rucker.ppc 6/5/2024