Loading...
HomeMy WebLinkAboutSW3241002_Supplement-EZ Form_20241118 SUPPLEMENT-EZ COVER PAGE FORMS LOADED I PROJECT INFORMATION 1 Project Name Rucker Single Family 2 Project Area(acj_ 65 • 3 Coastal Wetland Area(ac) 0 4 ,Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 I Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 i Width of vegetated setbacks provided(feet) 50 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 I Infiltration System 12 •Bioretention Cell 13 Wet Pond _ f 3 14 IStormwaterWetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 IDISConnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond _23 StormFilter 24 Silva Cell _ 25 {Bayfilter _ 26 [Filterra FORMS LOADED DESIGNER CERTIFICATION 27 'Name and Title: — _ __ Marc Van Dine.PE 28 'Organization: _ McAdams 29 Street address: __ __ 2100 S Tryon Street,Suite 400 30 City,State,Zip: _ _ _ Charlotte,NC 28203 31 Phone number(s): _4125137226 32 Email: su@mcadamsco.com Certification Statement I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer ,•. . CAR° •FESS/� Q, • �•QQO 2 . Signal a esi ner • SEAL �° • 036289 •'�tiGINE�e• •< 'is R. V AN.....°, 0-0 IF Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 8 3 Does this project have low density areas? + No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 4 Type of SCM N/A-bypass N/A-bypass Wet Pond N/A-bypass 5 Total drainage area(sq ft) 4196504 474539 83078 1002495 62005 6 Onsite drainage area(sq ft) 3428541 40075 _R 83078 728938 62005 7 Offsite drainage area(sq ft) 767963 434464 0 273557 0 8 Total BUA in project(sq ft) 1367831 sf 115863 sf 0 sf 427260 sf 0 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) 838000 sf 0 sf 0 sf 248000 sf 0 sf ir New BUA not on subdivided lots(subject to 10 permitting)(sf) 338541 sf , 0 sf 0 sf 121833 sf 0 sf 11 Offsite BUA(sq ft) 191290 sf 115863 sf 0 sf 57427 sf 0 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 25567 sf 0 sf 0 sf 8693 sf 0 sf -Sidewalk(sq ft) 77792 sf 0 sf _ 0 sf 28073 sf _ 0 sf _ -Roof(sq ft) 838000 sf 0 sf . 0 sf 248000 sf 0 sf -Roadway(sq ft) ` 235182 sf 0 sf 0 sf 85067 sf _ 0 sf -Future(sq ft) 0 sf 0 sf 0 sf 0 sf 0 sf -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) 0 sf 0 sf 0 sf _ 0 sf 0 sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft) 0 sf 0sf 0 sf __ 0 sf 0 sf Existing BUA that will remain(not subject to 15 permitting)(sq ft) 191290 sf_ 115863 sf 0 sf 57427 sf 0 sf 16 Existing BUA that is already permitted(sq ft) 0 sf 0 sf 0 sf 0 sf — 0 sf _ 1 Existing BUA that will be removed(sq ft) 0 sf 0 sf 0 sf 0 sf 0 sf _ 18 Percent BUA 33% 24% 0% 43% 0% 19 Design storm(inches) 1 3.1 in _ 3.1 in 3.1 in _ 3.1 in 3.1 in 20 I Design volume of SCM(cu ft) N/A N/A N/A 245964 cf N/A 21 jCalculation method for design volume SCS,SA/DA SCS,SA/DA SCS,SA/DA SCS,SA/DA SCS,SA/DA ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): There are 8 drainage areas that were evaluated to ensure the site was meeting all requirements.Areas 3,6,and 8 treat onsite and offsite drainage 1 using SCMs. Areas 2,4,5,&7 bypass onsite DAs with little to no BUA.Area 1 bypasses offsite drainage to reflect existing conditions. DRAINAGE AREAS ' 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 8 3 Does this project have low density areas? i No _ 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? I No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 3 6 7 8 4 T •e of SCM N/A-b sass Wet Pond N/A-b •ass _ Wet Pond ©Total drainage area(sq ft) 4196504 34880 805485 953194 780828 6 Onsite draina•e area s• ft 3428541 34880 805485 953194 721586 _ Offsite drainage area(sq ft) r r r 59242 Total BUA in project(sq ft) 363970 sf New BUA on subdivided lots(subject to permitting) (sq ft) ;��� ��I •��I 252000sf New BUA not on subdivided lots(subject to • •ermittin• s r 93970 sf MI Offsite BUA(sq ft) r 18000 sf Breakdown of new BUA not on subdivided lots: _ -Parking(sq ft) 25567 sf r sf 8926 sf WEE 7948 sf 1111. -Sidewalk s• ft) _ -Roof s• ft 838000 sf 0 sf 312000 sf 26000 sf 252000 sf -Roadway(sq ft) 235182 sf 0 sf 86529 sf 0 sf 63586 sf -Future(sq ft) r r 0 sf 0 sf 0 sf IIIOther,please specify in the comment box below s• ft -- IIINew infiltrating permeable pavement on subdivided lots(sq ft) r sf 0 sf 0 sf 0 sf 0 sf New infiltrating permeable pavement not on subdivided lots(sq ft) r sf 0 sf 0 sf 0 sf 0 sf ®Existing BUA that will remain(not subject to •ermittin• sq ft) 191290 sf 0 sf 0 sf 0 sf 18000 sf 16 Existin. BUA that is airead .ermitted s. ft r sf 0 sf 0 sf 0 sf 0 sf EMI Existin. BUA that will be removed =• ft 0 sf 0 sf 0 sf 0 sf 0 sf 18 Percent BUA 33% 0% 54% 3% 47% 19 Design storm(inches) 3.1 in 3.1 in 3.1 in 3.1 in 3.1 in 20 Design volume of SCM(cu ft) N/A N/A 298585 cf N/A 339657 cf 21 Calculation method for design volume SCS,SA/DA SCS,SA/DA SCS,SA/DA SCS,SA/DA SCS,SA/DA ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): _ ere are 8 drainage areas that were evaluated to ensure the site was meeting all requirements.Areas 3,6,and 8 treat onsite and offsite drainage ,using SCMs. Areas 2,4,5,&7 bypass onsite DAs with little to no BUA.Area i 1 bypasses offsite drainage to reflect existing conditions. WET POND 1 Drainage area number 3 6 8 2 Minimum required treatment volume(cu ft) I 245964 cf 298585 cf 339657 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes- Yes 4 Is the SCM located away from contaminated soils? Yes-- Yes Yes 5 What are the side slopes of the SCM(H:V)? I 2:1 2:1 2:1 6 Does the SCM have retaining walls,gabion walls or other engineered, No No No side slopes? i 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes Yes Yes design volume? 9 What is the method for dewatering the SCM for maintenance? i Pumpjpreferred) , Pump(preferred) Pump(preferred) , 10 if applicable.will the SCM be cleaned out after construction? Yes Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 Yes Yes Yes General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes Yes 15[Is there an O&M Plan that complies with General MDC(12)? Yes — Yes Yes -, 16 Does the SCM follow the device specific MDC? Yes Yes Yes - 17 Was the SCM designed by an NC licensed professional? Yes Yes Yes WET POND MDC FROM 0214.1053' 18 Sizing method used SA/DA - SA/DA SA/DA 19 Has a stageistorage table been provided in the calculations? Yes Yes Yes _ Elevation of the excavated main pool depth(bottom of sediment 728_00 708 00 748.00 20 removal)(fmsl) 4 - 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 729.00 709.00 749.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 734.50 713.50 753.50 23 Elevation of the permanent pool(frost) 735.00 714.00 754.00 24 Elevation of the top of the vegetated shelf(fros() 735.50 714.50 754.50 25 Elevation of the temporary pool(fmsl) I 736.49 715.24 754.94 _ 26 Surface area of the main permanent pool(square feet) 14392 20037 22115 27 Volume of the main permanent.pool(cubic feet) 52913 cf 81130 cf 86955 cf 28 Average depth of the main pool(feet) 3.68 ft 4.05 ft 3.93 ft 29 Average depth equation used Equation 2 Equation 2 Equation 2 30 If using equation 3,main pool perimeter(feet) -_ 311 If using equation 3,width of submerged veg.shelf(feet) 321Volume of the forebay(cubic feet) 10042 cf 12688 cf — 17803 cf 33 Is this 15-20%of the volume in the main pool? Yes Yes Yes 34 Clean-out depth for forebay(inches) 37.2" • 31.2" 31.3" 35 Design volume of SCM(cu ft) 245964 cf 298585 cf 339657 cf 36j Is the outlet an orifice or a weir? Weir _ Weir Weir 37 If orifice,orifice diameter(inches) 38 If weir,weir height(inches) 24 in 6 in 6 in 39i If weir,weir length(inches) i 24 in 48 in 36 in 40 Drawdown time for the temporary pool(days) 3.74 days 4.31 days _ 4.46 days 41 '�the inlet(s)and outlet located in a manner that avoids short- Yes Yes Yes circuiting? — 42 Are berms or baffles provided to improve the flow path? { Yes Yes _ Yes _ 43:Depth of forebay at entrance(inches) 60 in 60 in 60 in 44 Depth of foreba_y at exit(inches) 40 in 40 in 40 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes Yes 46 Width of the vegetated shelf(feet) 10 ft 10 ft 10 ft _ 47 Slope of vegetated shelf(H:V) 10:1 10:1 _ 10:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes Yes Yes 49'Does the pond minimize impacts to the receiving channel from the 1- Yes Yes Yes Yes r,24-hr storm? re fountains proposed?(If Y, please provide documentation that No No No 50 DC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? I Yes Yes Yes 533Species of turf that will be used on the dam and embankment Tall Fescue Tall Fescue Tall Fescue 54 Has a planting plan been provided for the vegetated shelf? Yes Yes Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about the 55 lwet pond(s): _ A_ Wet Pond 4 3:05 PM 9/23/2024