HomeMy WebLinkAboutWQ0044162_Approval_20241114 From: Fuego,Karla
To: Wood.Warren;aarant(ftaeinc.com;Scott Morrison;Adam Bowersox
Subject: Final Engineering Certification Acknowledgement for Lakeside Pointe-Phase 1-Permit No.WQ0044162
Date: Thursday,November 14,2024 11:04:00 AM
Attachments: imaae006.ona
SUBJECT: Final Engineering Certification Acknowledgement
Project: Lakeside Pointe - Phase 1
Permit No.: WQ0044162
Permittee: City of Hickory
County: Catawba
Greetings,
This email is acknowledgment that your Fast Track Sewer Extension Certification for Lakeside
Pointe - Phase 1 (permit No. WQ0044162) was received by the Mooresville Regional Office on
November 8, 2024.
Per Session Law 2024-49 Senate Bill 166 (Section 4.3), after construction of the sewer system
is completed, and within 14 days of receiving all necessary certifications from a professional
engineer that the sewer system extension complies with all applicable rules and Minimum
Design Criteria, the Commission shall issue a receipt of certification. Per Part II Standard
Conditions, Item 7 of the permit, upon completion of construction and prior to operation of
these permitted facilities, the completed Engineering Certification form attached to this
permit shall be submitted with the required supporting documents to the address provided on
the form. A complete certification is one where the form is fully executed, and the supporting
documents are provided as applicable. Supporting Documentation contents are identified in
subitems a, b, and c of the same condition. Additionally, per the Fast Track Sewer Engineering
Certification form, a Final Certification shall be a complete set of record drawings and design
calculations regardless of whether partials have been submitted.
While Division staff may review the certification submittal in the future and reach out with any
questions, by certifying the project, the signatory Professional Engineer has indicated that it
complies with all applicable permit requirements, as well as State and Federal rules, the
Minimum Design Criteria for permitting Fast Track Sewer Extension projects, and has
submitted all required supporting documents. A preliminary review of the submittal has
found the certification to be complete.
Should you have any questions, please do not hesitate to contact me.
Sincerely,
Karla Fueyo (pronounced foo-eh-yo)