HomeMy WebLinkAboutNCC243531_Site Plan or Location Map_20241115 1 2 3 4 5 6 7 8
—
-- 61.US highway 264 E US Highway 264 E=,
ISSUED FOR PERMITTING
New Energy Development Company
LNG FACILITY EXPANSION,PHASE 3A
Baldwin Swamp
awS; GREENVILLE, NC D
HDR Project No:10363640
Old Pn:t0"Pd
dryly Ol Bra rdenbm 0'
S1e�en s� PROJECT LOCATION INDEX RA
DRAWINGS: —
QaGENEL
Caleo 5l xoldp dJ� 01C-01-000 COVER SHEET
CIVIL
O Bradford C,ee4 Golf Course
01C-1-001 CIVIL GENERAL NOTES
Ili. 01C-5-000 EXISTING GRADING CONDITIONS
01C-5-001 PROPOSED LAYDOWN AREA
01G5-002 EROSION AND SEDIMENTATION CONTROL PLAN-PHASE 1
01C-5-003 EROSION AND SEDIMENTATION CONTROL PLAN-PHASE 2
01C-5-004 DEMOLITION AND RELOCATION PLAN
01G5-005 GRADING AND DRAINAGE PLAN
- _ 01C-5-006 PAVING AND COVERING PLAN
01C-5-007 ROAD PLAN,PROFILE,AND CROSS-SECTION
01C-5-008 UNDERGROUND COMPOSITE PLAN
' -_ 01C-7-001 GRADING SECTIONS
- 01C-8-001 EROSION AND SEDIMENTATION CONTROL-TYPICAL DETAILS C
01C-8-002 EROSION AND SEDIMENTATION CONTROL-TYPICAL DETAILS
' , _ 01C-8-003 EROSION AND SEDIMENTATION CONTROL-TYPICAL DETAILS
-500 01C-8-004 EROSION AND SEDIMENTATION CONTROL-TYPICAL DETAILS
tlk a ����� , 01C-8-005 EROSION AND DRAINAGE,
SEDIMENTATION CONTROLDET -TYPICAL DETAILS
VICINITY MAP
-iSS , I SURVEY(BY OTHERS) GRADING,DRAINAGE,AND UTILITY DETAILS
SCALE:1"=1000' - SU1 LOCATION&TOPOGRAPHIC SURVEY
J I
�i —I - SITE DATA
tt. ll PROJECT NAME: LNG FACILITY EXPANSION,PHASE 3A
DEVELOPER: NEW ENERGY DEVELOPMENT COMPANY
I �7i11, 160 FEDERAL STREET,18TH FLOOR
1 BOSTON,MA 02110
�{ `�fI P:978-686-4583
• SITE CIVIL PLANS BY: HDR ENGINEERING,INC.OF THE CAROLINAS
_ V,_ 440 S.CHURCH ST,SUITE 1200
- CHARLOTTE,NC 28202
7 OWNER: CITY OF GREENVILLE B
a.. PO BO 720
GREENVILLE,NORTH CAROLINA 27835
- S ` P.252-329-4444
I
�¢
5 1 I I I 1 1 I PARCEL AREA: 106 AC
I I .`.i PIN: 5608425792
PARCEL NUMBER: 022506
'�' - . . e - 4. - •- /�. ADDRESS: 4150 NATURAL GAS DRIVE
GREENVILLE,NORTH CAROLINA 27835
/ I 1 WATERSHED.TURBANCE: TAR PAMLICO
a / �..
r
�� r _ _ ._ EXISTING IMPERVIOUS: 0.27 AC
-NW I PROPOSED IMPERVIOUS: 0.46 AC
}�/ SUNNYSIDE RD/S.R.1535 I t
RNV 60' /
I PARKING DATA
I p TOTAL PARKING SPACES: 11 SPACES
/ ZONING SUMMARY
/ • fli EXISTING ZONING: RA
ji PROPOSED LAND USE: LIQUEFIED NATURAL GAS STORAGE FACILITY
I;I - MINIMUM BUILDING SETBACKS: 40 FT A
BUFFER REQUIRED: 10 FT
SCALE: 1"=100'
PROJECT MANAGER TORRI BORGIANINI
FD/ DESIGNED BY V.HAYNES s New Energy N COVER SHEET
DRAWN BY F.LUNTE . Development Company
CHECKED BY K.MESSINGER STRATEGY I PROJECT DEVELOPMENT I CAPITAL
LNG FACILITY EXPANSION, PHASE 3A
1 11/05/2024 ISSUED FOR CONSTRUCTION GREENVILLE, NORTH CAROLINA FILENAME 10363640-01C-1-000.DWG SHEET
0 10/14/2024 ISSUED FOR CONSTRUCTION 01 C-1-000
ISSUE DATE DESCRIPTION PROJECT NUMBER 10363640 SCALE NONE