March 4, 2016
Wake County
NCDWR Project No. 201601 10
Bridge 132 on SR 2052
State Project No. 17BP.S.R.47
APPROVAL of 401 WATER QUALITY CERTIFICATION and NEUSE BUFFER AUTHORIZAT[ON,
with ADDITIONAL CONDITIONS
Mr. J. Hopkins, P.E., Division Engineer
NCDOT, Division 5
2612 North Duke Street
Durham, NC 27704
Dear Mr. Hopkins:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
replacing Bridge 132 and upgrading SR 2052 in Wake County:
Stream Im�acts in_the Neuse River Basin __
Permanent Fill in �Riprap Stahilization T TemQorary � Rinrap
Intermitteni Stream to Intermittent Dewatering in Stabilization to
(linear ft) Stream Intermittent Stream Perennial Stream
(linear ft) (linear ft) (linear ft)
0 0 0 191
11 47 47 0
0 14 4 0
Total I 11 I 61 I 51
Total Stream Impact for Project: 319 linear feet.
Site
I
2a
2b
Totals
191
Temporary
�ewatering in
Perennial Stream
(linear ft)
5
0
0
Neuse Ri arian Buffer fm acts
Zone 1 Impact Zone 1 Buffer Mitigation Required Zone 2 Impact Zone 2 Buffer Mitigation
(s ft) (usin 3:1 ratio) (s ft) Re uired (usio 1.5:1 ratio
10300 N/A 4988 N/A
6564 N/A 807 N/A
854 2562 2260 3390
17718 2562 8055 3390
* n/a = Impact Allowable, no mitigation required
Totai Buifei- Impa�t for i'roject: 25773 square feet.
State of North Carolina'iL-nvironmental Quality '� Water Rescurces
i617 Mail Service Center, Raleiyh, North Carolina 27699-1617
Phcne y19-80'-63UG
The project shall be constructed in accordance with your application received February 4, 2016. After reviewing
your application, we have decided that these impacts are covered by General Water Quality Certification Number
3886. This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. This approval
is also valid for the Neuse Riparian Buffer Rules (15A NCAC 2B.0233). In addition, you should acquire any other
federal, state or local permits before you proceed with your project including (but not limited to) Sediment and
Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the
accompanying 404 permit.
This approval is valid solely for ihe pu�pose and design descr•ibed in your application (unless modified below).
Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the conditions. If total wetland fills for this proj ect (now or in the future) exceed one acre, or of total
impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation
as described in 15A NCAC 2B.0233. For this approval to remain valid, you must adhere to the conditions listed in
the attached certification and any additional conditions listed below.
Conditions of Certification: �
1. Compensatory mitigation for impacts to 854 square feet of protected riparian buffers in Zone 1 and 2260 square
feet of protected riparian buffers in Zone 2 shall be required. We understand that you have chosen to perform
compensatory mitigation for impacts to protected buffers through use of the North Carolina Division of Mitigation
Services (DMS) (formerly NCEEP). Mitigation for unavoidable impacts to Neuse Riparian Buffers shall be provided
in the Neuse River Basin and done in accordance with 15A NCAC .02B .0295. The DMS has indicated in a letter
dated January 26, 2016 that they will assume responsibility for satisfying the compensatory mitigation requirements
for the above-referenced project, in accordance with DMS's Mitigation Banking Instrument signed July 28, 2010.
2. The post-construction removal of any temporary bridge structures must return the project site to its
preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species.
[15A NCAC 02H .05061b)(2) ]
3. As a condition of this 401 Water Quality Certification, the bridge demolition and construction must be
accomplished in strict compliance with the most recent version of NCDOT's Best Management Practices for
Construction and Maintenance Activities. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)]
4. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and
pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before
entering the stream. Please refer to the most current version of Stormwater Best Management Practices. [15A
NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)]
5. Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft construction
methods. More specifically, jetting or other methods of pile driving are prohibited without prior written approval from
the NCDWR first. [15A NCAC 02H.0506(b)(2)]
6. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters.
This water shall be captured, treated, and disposed of properly. [15A NCAC 02H .0506(b)(3)]
7. .� turbidity curtain will be instalied in the stream if driving or drilling activities occur within tne stream channel,
on the stream bank, or within 5 feet of the top of bank. This condition can be waived with prior approval from the
NCDWR. [15A NCAC 02H .0506(b)(3) ]
8. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and
streams, shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than
423 inches, and 20 pereznt of the cu(vert diameter for culverts having a diameter Iess than 48 incnes, to al"low iew flcw
passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion
control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or
banks; adjacent to or upstream and down stream of the aUove structures. The a�rlicant is required to pravide evidence
that the equilibrium is being maintained if requested in writing by th� NCDWR If this condition is u;►able to be met
due to bedrock ar other limiting features encountered during construction, please contact the 1`TCDWR for guidance on
how to proceed and to c�ete_�-mine whether or not a pertnit modification will be required. f 15A NCAC 02H.0506(b)(2)]
9. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes
aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. [15A
NCAC 02H.0506(b)(2)]
10. For any streams being impacted due to site dewatering activities, the site shall be graded to its preconstruction
contours and revegetated with appropriate native species. [15A NCAC 02H.0506(b)(2)]
11. Ail stormwater runoff shall be directed as sheetflow ihrough sh•eam buffers at non-erosive velocities, unless
otherwise approved by this certification. [15A NCAC 2B.0233]
12. All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the
preconstruction contours and revegetated. Maintained buffers shall be permanently revegetated with non-woody
species by the end of the growing season following completion of construction. For the purpose of this condition,
maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular NCDOT
maintenance activities including mowing. The area with non-maintained buffers shall be permanently revegetated with
native woody species before the next growing season following completion of construction. [15A NCAC 2B.0233]
13. Pursuant to 15A NCAC 2B.0233(6), sediment and erosion control devices shall not be placed in Zone 1 of any
Neuse Buffer without prior approval by the NCDWR. At this time, the NCDWR has approved no sediment and
erosion control devices in Zone 1, outside of the approved project impacts, anywhere on this project. Moreover,
sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not
compromised and that discharge is released as diffuse flow.
14. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between
curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to
surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200]
15. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or
protected riparian buffers. [ 15A NCAC 02H.0506(b)(2)]
17. T_h,e dimension, pattern anc! profile ef rhe stream abo��e ar� belew th� yrossing shall r.n± �� modified. �isturbed
floodplains and streams shall be restored to natural geomorphic conditions. �15A NCAC 02H.0506(b)(2)]
18. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15A
NCAC 02H.0506(b)(2)]
19. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approval. [15A NCAC 02H .0507 (c) and I SA NCAC 02H .0506 (b)(2) and (c)(2)]
20. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from
the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms,
cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A NCAC
02H.0506(b)(3) and (c)(3)]
21. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream. [ 15A NCAC 02H.0506(b)(3)]
22. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC
02H.0506(b)(3)]
23. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certitication. [15A NCA� 02H.U505(bj(3 j]
24. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters
is prohibited. [15A NCA� 02H.0505(b)(3)]
25. The permittee and its authorizPd agents shall conduct its activities in a manner consistent with State v�ater quality
stan�ards (including any requirements resulting from compiiance with §303(d) of the Clean Water Act) and any other
appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being
met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that
further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A
NCAC 02B.0200]
26. A copy of this Water Quality Certification shal] be maintained on the construction site at all times. In addition, the
Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and
the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
27. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization
shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the
fencing are prohibited unless otherwise authorized by this certification. [I SA NCAC 02H.0501 and .0502]
28. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, storniwater management rules, soil erosion and
sedimentation control requirements, etc.
29. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of
discovery. [15A NCAC 02B.0506(b)(2)]
30. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division
Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all
work included in the 401 Certification has been completed. [15A NCAC 02H.0502(fl]
31. Native riparian vegetation (i.e., trees and shrubs native to your geographic region) must be reestablished in the
riparian areas within the construction limits of the project by the end of the growing season following completion of
construction.[15A NCAC 02B.0233(10)]
32. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be
locatPd ir wetlands or streams, com�;er.satery miti�ation will be reqt�ired sir.ce that is a dire�t impact from road
construction activities.[15A NCAC 02H.0506(b)(3) and (c)(3)]
33. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design,
installation and operation and maintenance of such Best Management Practices in order to protect surface waters
standards [15A NCAC 02H.0506(b)(3) and (c)(3)]:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must
be such that they equal, or exceed, the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Mana�a[. The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
34. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this
CEriification. [ 1 �A NCAC 02H.0506(b�(3 j and (c)(3)�
[f you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the oftice of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except
for official state holidays. The original and one (1) copy of the petition must be filed with the Office of
Administrative Hearings.
The petiiion may be faxed-provided the original and one copy ur tne document is received by the Ofiice of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919) 431-3000, Facsimile: (919) 431-3100
A copy of the petition must also be served on DEQ as follows:
Mr. Sam M. Hayes, General Counsel
Department of Environmental Quality
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. [f you
have any questions, please contact Rob Ridings at 919-707-8786.
Sincerely,
���
S. Jay "Limmerman, Director
Division of Water Resources
Electronic copy only distribution:
Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office
Chris Murray, Division 5 Environmental Officer
Beth Harmon, Division of Mitigation Services
File Copy
Water Resources
ENVIRONMENTAL OUnLIlY
NCDWR Project No.:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
COUlltj':
I':� I ,Ail�( IZ(�IZI�
�)�)'V�:��,�� ��. ��r1�' �)� �Z � .��1��V �
ti. J -�Y 'I,IMM}iRMnN
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting
Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form
may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certifccation
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Sigr�atu� e: Da�e:
�fgen.'s Certifrcation
!, � , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Date:
Engineer's Certifrcation
Partial Final
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature _ _ Registration No.
DatP
State of North CarolinT'Emironmental Quality W�ter Rcsources
1"017 Mail Service Cenier, Raleigh, North Carolina 27699-io17
Phene:919-80i-630C�