HomeMy WebLinkAboutSW6240401_Emails_20241113 Beeker, Jacob I
From: Beeker, Jacob I
Sent: Wednesday, November 13, 2024 2:49 PM
To: rpwellons@wellonsrealty.com; laurenwhite@wellonsrealty.com
Cc: Joyner, Melissa; svc_post_construction_stormwater; Hines, Lee R; Fleet Temple; Dylan
Eure
Subject: Re: SW6240401; Maple Drive (Harnett)
Good afternoon,
The Division of Energy, Mineral, and Land Resources (DEMLR) received a Post-Construction Stormwater
Management Permit Application for the subject project on August 13th, 2024.
15A NCAC 02H .1042(3)(c)of the North Carolina Administrative Code states that an application is considered
approved if the required response times outlined in G.S. 143-215.1 are not met, unless one of the following
exceptions applies:
i. The applicant agrees, in writing,to a longer review period.
ii. A public hearing is required for a final decision.
iii. The applicant fails to provide necessary information for the Division's review.
iv. The applicant denies the Division access to records or premises for information gathering.
As none of these exceptions were relevant to your application,SW6240401 is considered approved on
September 12th, 2024, based on the aforementioned regulation (15A NCAC 02H .1042(3)(c)).
We are forwarding Permit No.SW6240401, dated September 12th, 2024,for the construction, operation and
maintenance of the built-upon areas(BUA) and vegetated conveyances or areas associated with the subject
project.This permit shall be effective from the date of issuance and shall be subject to the conditions and
Limitations as specified therein and does not supersede any other agency permit that may be required.
The original signed permit package and approved plans are being mailed to the permittee,Wellons Realty, Inc.,
at the following address(NOTE:An electronic version of this permit can be found in our online repository:
https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources):
Wellons Realty, Inc.
Attn: Robert P.Wellons, President
2004 W. Cumberland St.
Dunn, NC 28334
1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are
noticed and corrections need to be made)after which point,they will be kept on file at the Fayetteville Regional
Office. If you have any questions, or need additional information concerning this matter, please contact Jacob
Beeker at jacob.beekerCa)deq.nc.gov.
Thankyou,
i
Jacob Beeker(He/Him)
Environmental Engineer
Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
Office:(919) 707-9214
iacob.beeker(a-)deq.nc.gov
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Holland, Brianna <brianna.holland@deq.nc.gov>
Sent: Saturday,June 29, 2024 3:02 PM
To: Fleet Temple<fleet@ftempleengineering.com>; rpwellons@wellonsrealty.com <rpwellons@wellonsrealty.com>;
laurenwhite@wellonsrealty.com <laurenwhite@wellonsrealty.com>
Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner,
Melissa <melissa.joyner@deq.nc.gov>
Subject: RE: SW6240401; Maple Drive (Harnett)
Good afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater
Management Permit Application for SW6240401 on April 1, 2024. A review of that information has determined that the
application is not complete. Attached is a letter describing the items that need to be submitted.
When responding to this request, please mail all requested documents to the address provided in the letter. Please
upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central
Office as the Primary Contact office.
https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload
Thank you,
Brianna Holland
Environmental Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-9218
brianna.holland@deg.nc.gov (email preferred)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
2
z.,..DE
NORTH CAROLINA ka ;
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Please direct all post-construction permitting questions and correspondences to our new
group email address, postconstruction@deg.nc.gov
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent:Tuesday,April 2, 2024 12:20 PM
To: Fleet Temple<fleet@ftempleengineering.com>; rpwellons@wellonsrealty.com; laurenwhite@wellonsrealty.com
Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner,
Melissa <melissa.joyner@deq.nc.gov>; Holland, Brianna <brianna.holland@deq.nc.gov>
Subject: SW6240401; Maple Drive (Harnett)
Good Afternoon,
We received your post-construction stormwater permit application for the subject project on 4/1/24. Reviews under the
Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the
review queue by emailing postconstruction@deq.nc.gov(We have an autoreply set up that has the review queue on it).
Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the
Central Office as the Primary Contact office.
https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the
"State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST-
CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type
dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last
file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not
upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file
type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps
expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan
sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for
review.
Please type in permit#: SW6240401
This project will be reviewed by Brianna Holland, if you have any questions, please contact them at
postconstruction@deg.nc.gov or at 919-707-9218.
Thank you,
3
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deq.nc.gov
D_ E
NORTH CAROLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Fleet Temple<fleet@ftempleengineering.com>
Sent:Wednesday, March 27, 2024 1:18 PM
To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; rpwellons@wellonsrealty.com; laurenwhite@wellonsrealty.com
Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner,
Melissa <melissa.ioyner@deq.nc.gov>
Subject: [External] RE: Maple Drive; Erwin, Harnett County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Kaitlin,
See attached:
Comment Response
Revised Application
C1.0
C2.0
C4.2
EZ Supplement Form
Hard copies mailing out today along with $1000.00 review fee
Thanks,
-Fleet
Fleet Temple Engineering, PLLC
5245 Red Hill Church Rd.
Coats, NC 27521
910-658-2446
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent:Wednesday, March 13, 2024 2:50 PM
4
To: rpwellons@wellonsrealty.com; Fleet Temple<fleet@ftempleengineering.com>
Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov>;Joyner,
Melissa <melissa.ioyner@deq.nc.gov>
Subject: Maple Drive; Erwin, Harnett County
Good Afternoon,
We received your application for a new post-construction stormwater permit on 3/7/24. At this time, the submission is
not administratively complete and cannot be accepted for review in its current condition. Please provide the following
submittal items within 30 calendar days (by close of business on 4/12/24) so that we may accept the project and begin
the review process, otherwise, the project will be returned as administratively incomplete.
• 1x application fee check in the correct amount (this item is required per Session Law 2023-134, Section
12.14(e)(2)):
• Please be aware that, effective October 3, 2023, our permit application fee structure is as follows:
• New Permit or Major Modification for a project with one (1) or fewer SCMs=$1,000
• New Permit or Major Modification for a project with two (2) SCMs=$1,250
• New Permit or Major Modification for a project with three (3) SCMs=$1,750
• New Permit or Major Modification for a project with four(4) or more SCMs= $2,250
• Minor Modification =$250
• Renewal =$750
• Transfer=$750
• Renewal &Transfer Combination =$1,500
• General Permit=$700
• Per the submittal items, this project will require an application fee of$1000 as this application is for a
New Permit for a Project with no SCM. Please provide a new application fee check in this amount so that
we may process your application. We will void and return the provided application fee check to the
permittee (unless a different return address is indicated by close of business tomorrow).
• 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC
02H .1042(2)(a) and per Section VI, 1 of the Application):
• Section II, 5—This project does appear to be located within 5 miles of a commercial airport. Please refer
to this map (https://www.ncdot.gov/divisions/aviation/Pages/nc-airports.aspx). If you believe that this
project is located within 5 miles of a commercial airport, please provide the airport information (name &
location).
• 1x hard copy of sealed, signed, and date calculations relevant to the application's project.This item is required
per 15A NCAC 02H .1040(2)(f) and per Section VI, 7 of the application.
• 1x hard copy of a soils map.This item is required per Section VI, 9 of the Application.
• 1x hard copy of official documentation showing that the Applicant is in good standing with the NC Secretary of
State and showing the title and position information for the signing official (These items are required per 15A
NCAC 02H .1040(1), .1042(2)(b), and per Section VI, 11 of the Application).
5
• 2x signed &sealed hard copies of a plan sheet showing the following corrected additions:
• A Location/Vicinity Map.The 2 major roads identified in the directions to the site provided in Section LIV
of the application should now be shown on the vicinity map on the plans as well as any other roads, and
distances to those intersections. We encourage the consultant to list both the local street name and the
NCSR number, if there is one.
• Existing site conditions.This item is required per Section VI, 8k&8n of the Application and 15A NCAC
02H .1042(2)(g)(v).
• Wetland delineation or a note on the plans stating that there are no wetlands located on-site.This item
is required per 15A NCAC 02H .1042(2)(g)(iii) &Section VI, 8m of the Application. Please also list the
name of the individual that made this determination in a note on the plans.
• BUA dimensions and layouts.This item is required per Section VI, 8j of the Application.The BUA
information shown in the Application, Supplement-EZ Form, and calculations should be verified from the
plans.
NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that
may be brough up during the engineering review.
If these items are received within the stipulated timeframe, we can accept the project and begin the review process.
Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our
two reviewer positions is currently vacant).
Hard copies should be mailed to the following address:
For USPS:
Jim Farkas
1612 Mail Service Center
Raleigh, NC 27699-1612
For Fed Ex/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640E
Raleigh, NC 27604
If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209.
Thank you,
6
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deg.nc.gov
D7:.,.E Q
NORTH CAROLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
7