HomeMy WebLinkAboutNCC243434_ESC Approval Submitted_20241112 ';;;— ,KTF q„`
,. —
ROY COOPER 's y 1 2
Governor �\� C f
ELIZABETH S.BISER
Secretary " —
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interim Director Environmental Quality
08-12-2024
LETTER OF APPROVAL
Reaper Holdings LLC
Tobaccoville,NC 27050
Click or tap here to enter text.
RE: Project Name: 0 Meadowbrook Drive
Permit Number: STOKE-2025-0109
Acres Approved: 4.77
County: Stokes
City: King
Address: 0 Meadowbrook Drive
River Basin: Yadkin - Pee Dee
Stream Classification: WS-IV: Water Supply IV
Submitted By: matthew greene
Plan Type: Revised Plan
Dear Reaper Holdings LLC,
This office has reviewed the subject erosion and sedimentation control plan. We hereby issue this
Letter of Approval. Any modifications required for approval are listed in the body of the email that
accompanied this attached letter. The enclosed Certificate of Approval must be posted at the job site.
This plan approval shall expire three (3) years following the date of approval, if no land-disturbing
activity has been undertaken,as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities not explicitly exempt are required to complete and
submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you
will receive a link with payment instructions for the annual permit fee. After the fee is processed,you
will receive the COC. As the Financially Responsible Party shown on the FRO form submitted for this
project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI
form may be accessed at deq.nc.gov/NCG01.
Q-.A\ North
North Carolina DepartmentSalisburyStreet of
1612 EnvironmentalMailServiceCenter I Raleigh Quality I Division
North of Energy,MineralCarolina276
and
99-16 Land12 Resources
NORTH CAROLINAD_E
,
Department of Environmental Dual 919.707.9200
Letter of Approval
Reaper Holdings LLC
08-12-2024
Page 2 of 2
Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central
office. If the owner/operator of this project changes in the future, the new responsible party must
obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC,once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. ll3A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project,
the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also
apply to this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form and on the plan, which you provided. You are requested to file an
amended form if there is any change in the information included on the form.
Your cooperation is appreciated.
Sincerely,
Margeory Castellanos Figueroa
Land Quality Section