HomeMy WebLinkAboutNCC243308_(ARPA) DWI Letter of Intent to Fund_20241106 :=-t,;c STATE a ,,
-moo
ROY COOPER 1 1.
Governor
ELIZABETH S.BISER + ter''
Secretary *f#f Qum.,lot___
SHADI ESKAF NORTH CAROLINA
Director Environmental Quality
April 21, 2022
David Odom, Town Manager
Town of Taylorsville
67 Main Avenue Drive SE
Taylorsville NC 28681
Subject: Letter of Intent to Fund
Wastewater System Reliability
Improvements
American Rescue Plan-Earmark
Project No.: SRP-W-ARP-0083
Dear Mr. Odom:
The Division of Water Infrastructure has reviewed your Request for Funding, and
determined your project is eligible to receive American Rescue Plan (ARP) funding from the
State Fiscal Recovery Fund established in S.L. 2021-180. Projects funded from the State Fiscal
Recovery Fund must meet applicable federal law and guidance for the ARP funds. The ARP
Project Grant will be one hundred percent of eligible project costs up to a maximum of
$1,205,130.
The first milestone is the submittal of a Bid and Design Package by August 1, 2022.
Please note that this intent to fund is contingent on meeting all of the following milestones:
Milestone Date
Apply for all Necessary Permits* ASAP
Bid and Design Package Submittal (obtain all permits) August 1, 2022
Bid and Design Package Approval December 1, 2022
Advertise Project, Receive Bids, Submit Bid Information, April 3, 2023
and Receive Authority To Award
Execute Construction Contract(s) _May 1, 2023
Receive last reimbursement- Statutory December 31, 2026
*An engineering alternatives analysis (EAA) may be required on certain projects.
Failure to meet any milestone may result in the forfeiture of funding for the proposed
project.
Note that the Division will make no reimbursements of ARP funds after December 31, 2026
D E Q' North Carolina Department of Environmental Quality I Division of Water Infrastructure
NORTH CAROLINA
OOO 512 N.Salisbury Street 1 1633 Mail Service Center I Raleigh,North Carolina 27699-1633
D p,m.eoi�a�m.taioai\ � 919.707.9160
David Odom, Town Manager
April 21, 2022
Page 2 of 2
The State Environmental Policy Act exempts projects funded by the State Reserve (such
as this project) from state-mandated environmental review. Federal requirements may still apply.
[NCGS 113A-12(2)h.]
Upon detailed review of the project during the funding process, it may be determined that
portions of your project are not eligible for funding.
US Treasury Requirements
Projects with an expected total cost of ten million dollars or more must meet US Treasury
requirements for prevailing wage rates, project labor agreements, and related requirements.
Recipients can either certify meeting the requirements or provide plans and reports as the SLFRF
Compliance and Reporting Guidance (treasury.gov) specifies.
If you have any questions,please contact Tesfu'Steve' Tsadwa, by phone at(919) 707-
9172 or by email at steve.tsadwa@ncdenr.gov.
Sincerely,
Jon Risgaard, Chief
State Revolving Fund Section
CC: Benjamin B, Thomas, PE, West Consultants, PLLC, Morganton,NC
Ken Pohlig, PE (DWI, via email)
Tesfu'Steve' Tsadwa(DWI, via email)
Mark Hubbard, PE (DWI, via email)
ARP Project File (COM_LOIF)