HomeMy WebLinkAboutNCC240833_Modification Review (Corrected Lots)_20241105 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 11/5/2024 9:57:15 AM (ADD TO FILE Submittal)
Approve by bethany.georgoulias 11/5/2024 3:19:30 PM(Construction COC ADD TO FILE Review-NCC240833)
• The task was assigned to bethany.georgoulias.The due date is: November 8,2024 5:00 PM
11/5/2024 9:57:17 AM
Ago Permit for DEQMODIFICATION
Construction0i00
0000
Certificate of NCC240833
Coverage(COC)No.* Enter the Certificate of Coverage Number(Use capital letters)
2020 Annual Fee Status 2021 Annual Fee Status 2022 Annual Fee Status
May be blank if N/A May be blank if N/A May be blank if N/A
2023 Annual Fee Status 2024 Annual Fee Status
May be blank if N/A May be blank if N/A
Information associated with this permit:
Project Name Wildbrook Village AKA Jonathan Creek
Address 1585 Jonathan Creek Road,Waynesville, NC
County Haywood
Latitude 35.5429
Longitude -83.0251
Permittee Listed D.R. Horton Inc.
Legally Responsible Debra Green
Individual At the time of Modification Request(not looked up again at review)
NC Reference No. NCG01-2024-0833
E&SC Plan ID 031124
Original NOI Tracking 188071
No.*
Date COC Issued* Effective Date at Submittal
04/01/2024
Prior Rescission Date This field will populate only if COC has already been rescinded.
Modification Information:
Reason for Modification*
Closed-Out Lots/Outparcels in E&SC Plan
Additional Lots/Outparcels Approved-E&SC Revised
Other Revision(s)to E&SC Plan
Legally Responsible Individual and/or Site Contact Has Changed
Multiple Reasons(List)
Addional Explanation
More information(e.g.,new Site Contact details).If lots are being added,please include specific lot numbers.
Add Lot numbers 16,34,48-61,77-82. Modification submitted on 11/04 had the incorrect lots listed.
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload
applicable sheets).
For changes to the legally responsible individual, you must upload this form.
Supporting Documentation
Upload Supporting Documentation(Revised E&SC Approval,Close-Out Doc,etc.)
Wildbrook Village Take 3 Permit Placard.pdf 554.7KB
Wildbrook Village Take 3 LOA.pdf 166.32KB
Must be PDF format
Is this project funded with ARPA(American Rescue Plan Act)grant funds?
No
Yes
This question was added to the eNOl on 2/3/2023 and will not be answered in applications submitted prior to that date.
North Carolina General Statute 143-215.613(1)provides that:
Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document
filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000).
* I hereby request modification to coverage under the NPDES Stormwater Permit for the
subject project site. I am familiar with the information contained in this request and to
the best of my knowledge and belief such information is true,complete and accurate.
Specify if you are:* The Legally Responsible Individual
Authorized Responsible Person*
*This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a
president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item
(6)of that permit.
Signature
cr/f te0 4wt~
Type Name* Debra Green
Title* Division President
Organization* D.R. Horton Inc
Date* 11/05/2024
Email Address* hsoutherland@drhorton.com
Email for confirmation
Telephone Number* 8434554995
Contact number if we need to reach you
Note:Original permittee and site contact are copied on modification correspondence.
Additional Email Additional email for confirmation
(Optional)
Original Permittee degreen@drhorton.com
Email
Original Site Contact fbowen@drhorton.com
Email
Review Date 11/05/2024
Rescinded Since
Submitted?
Current Effective Date Current Expiration Date Permit Version
4/1/2024 3/31/2029 2.00