No preview available
HomeMy WebLinkAbout20160190 Ver 1_291 Revised Permit Drawings_20160229Carpenter,Kristi From: Sent: To: Allen, Yates Monday, February 29, 2016 2:17 PM Beckwith, Lori SAW Cc: Medlin, Christopher D; DeWit, Benjamin J; Chambers, Marla J; andrew_henderson@fws.gov; Carpenter,Kristi; Barnett, Kevin Subject: Bridge 291 Buncombe plan sheets Attachments: 291 Revised Permit Drawings.pdf Follow Up Flag: Flag Status: Follow up Completed Please see the attached plan sheets for Bridge 291 Buncombe County. This is the promised follow-up to the previous e- mail. Yates From: Allen, Yates Sent: Monday, February 29, 2016 2:12 PM To: Beckwith, Lori SAW Cc: Medlin, Christopher D; DeWit, Benjamin J; Chambers, Marla J; 'andrew_henderson@fws.gov'; Carpenter,Kristi; Barnett, Kevin Subject: Bridge 291 Buncombe PCN Good afternoon, Please see the attached PCN for Bridge 291 in Buncombe County. We plan to replace the existing bridge with an aluminum, double barreled culvert. I will attach plan sheets to a second e-mail. If you have any questions please call me. Yates Allen Division Environmental Specialist NC Department of Transportation 828 251 6171 office 828 713 1568 mobile vallen .ncdot.qov 55 Orange Street PO Box 3279 Asheville, NC 28802+3279 ; ,� r M � � Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. ����� ���,4�y North Carolina Department of Transportation SG[�Y�11W2tPr . I � ,,.,.,,.,, Highway Stormwater Program ��.� STORMWATER MANAGEMENT PLAN (Version 2.04; Released November 2015) FOR NCDOT PROJECTS WBS Element: 17BP.13.R.25 TIP No.: County(ies): Buncombe Page 1 of 2 General Project Information WBS Element: 17BP.13.R.25 TIP Number: Project Type: Bridge Replacement Date: 12/11/2015 NCDOT Contact: Bill Zerman, PE Contractor I Designer: Sungate Desi n Group, P.A. Address: NCDOT Hydraulics Unit Address: g15 Jones Franklin Road 1590 Mail Service Center Raleigh, NC 27606 Ralei h, NC 27699-1590 Phone: 919 707-6755 Phone: 919 859-2243 Email: bzerman ncdot. ov Email: bsmith sun atedesi n.com Cit ITown: Candler, NC Count ies : Buncombe River Basin s: French Broad CAMA County? No Wetlands within Project Limits? No Pro'ect Description Pro'ect Len th lin. miles or feet : 042 Miles Surroundin Land Use: Rural Residential Proposed Pro'ect Existin Site Pro'ect Buiit-Upon Area ac. 0.1 ac. 0.1 ac. Typical Cross Section Description: 2-10' paved lanes 2-8' paved lanes Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 70 Year: 2000 Existin : 70 Year: 2000 General Project Narrative: This project involves the replacement of Bridge No. 100291 over UT Little Pole Creek on SR 1222 (Brooks Cove Road) in Buncombe County, NC with a 2@73"x55" Aluminized (Description of Minimization of Water CSPA. This bridge replacement and the associated roadway improvements have been designed in a manner that minimizes the increase in impervious surface area. One of the Quality Impacts) two culvert barrels will have a sill that is 0.5' higher than the other barrel, causing the stream to flow through only one barrel under normal flow conditions. The northeast, northwest, and southwest quadrants of the project contain Special Cut Ditches that convey water from roadside ditches to the stream. Rip rap lining is specified where necessary to provide erosion protection. Waterbody Information Surface Water Body (1): UT Little Pole Creek NCDWR Stream Index No.: N/A NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) E-]j�sj��ti��y North Carolina Department of Transportation � � St�rtll�vrdter I �..,.,,, Highway Stormwater Program ��' STORMWATER MANAGEMENT PLAN -- (Version 2.04; Released November 2015) FOR NCDOT PROJECTS WBS Element: 17BP.13.R.2� TIP No.: County(ies): Buncombe Page 2 of 2 Bridge to Culvert Avoidance and Minimization Proposed Structure Summary Sheet No. & Station Sheet No.: 4 Station: 13+08 -L- Number of Barrels: 2 Drainage Area (ac or sq mi): 0.73 Sq. Miles Barrel Width/Diameter (ft): 6'-1" Surface Water Body: UT Little Pole Creek Barrel Height (ft : 4'-7" Culvert T e: Aluminized CSPA Culvert Length (ft 50 Avoidance and Minimization Efforts: The proposed culvert will be buried 1.0' with sills throughout the low flow channel to retain bed material. A floodplain bench and 1.5' sills in the high (Bridge to Culvert) flow barrel of the culvert promote low flow in one barrel only, maintaining the existing low flow channel dimensions and velocities as closely as possible. The culvert approximates the existing bed slope and provides a smooth transition from upstream to downstream. The proposed culvert is better aligned with the stream and provides less abrupt bends at the inlet and outlet compared to the existing bridge. Stream Slope Fish and/or Aquatic Life Passage Existing Average Stream Slope (°/a): 3.80 % Existing Low Flow Channel Dimensions 5.7' wide Proposed Culvert Slope (%): 3.60 % in the Stream: 0.4' deep Culvert Burial Proposed Culvert Burial Depth (ft): 1 Existing Streambed Material: Sand with cobbles, gravel, and boulders Proposed Low Flow Dimensions 6.1' wide Through the Culvert: 0.5' deep Proposed Sills/Baffles: The proposed culvert will have 1.0' sills at the inlet, outlet, and two additional locations spaced 16' Existing Low Flow Velocities in the throughout the low flow barrel, and 1.5' sills at the inlet Stream (ft/s): 1.4 and outlet of the high flow barrel. ropose ow ow e oci ies roug the Culvert (fUs): 1'2 Alternating Low Flow Sills/Baffles: N/A Culvert/Stream Alignment Stream Patterns Upstream and Downstream The existing stream features bends upstream and downstream of the proposed culvert. These bends are a natural part of the stream and the of the Culvert that Could Affect Fish proposed culvert was designed in a way that best promotes bank stability given the physical constraints of the roadway. Passage and Bank Stability: Bed Forms Impacted by Culvert (riffles, A long riffle runs through the proposed location of the culvert. pools, glides, etc.): Low Flow Floodplain Bench Required? Yes A floodplain bench is necessary to provide the low-flow channel geometry necessary to approximate the existing stream as well as (provide justification) adequately pass high flow events without increasing water surface elevations upstream of the culvert. Sharp Bends at Inlet/Outlet? Yes Bends are present at the inlet and outlet of the proposed culvert due to the natural alignment of the existing stream. (describe culvert alignment with stream) Stream Realignment Necessary? (provide Yes The propsed culvert is skewed to the road to provide less abrupt inlet and outlet bends than the existing bridge allows. This should justification) reduce the threat of bank degradation. Bank Stabilization: Class I rip rap has been specified for the banks upstream and downstream of the proposed culvert to provide bank stabilization. Outlet Velocities Natural Stream Channel 2-yr Velocity (ft/s): 3.5 Natural Stream Channel 10-yr Velocity (ft/s): 3.9 Proposed Culvert 2-yr Outlet Velocity (ft/s): 3.5 Proposed Culvert 10-yr Outlet Velocity (ft/s): 3.8 Roadway Geometric Considerations Evaluate/Describe Roadway Geometric Constraints: The general alignment of the stream approaches and leaves the roadway crossing on an extreme skew. It would be impracticable to install a culvert along this alignment as the skew would be very large and straightening the stream too much may be detrimental to its stability. � � + �' a� 3 � a �, � oT N=� � _� N�- NNE 00.�� � � See Sheet 9-A For Index of Sheets See Sheet 1-B For Conventlonol Symbols GRAPHIC SCALES 20 10 0 20 40 PLANS 20 10 0 20 40 PROFILE (HORIZONTAL) 4 2 0 4 8 DESIGN DATA ADT 2010 = 590 DHV = % � _ % T = 0 % * V = 40 MPH FUNC CLASS = RURAL LOCAL ��� 1L � �� ����� `�/������� �� �Y ����� �� 1LJ�1L�� V'V' � Il � B U1�COMBE CO U1�lTY LOCATI011I: BRIDGE 11r0.100291 OVER UNNAMED BRANCH OF LITTLE POLE CREEK 011t SR 1222 TYPE OF WORK: GRADI11lG, DRAl11tAGE, A111D PAVI11lG WETLAND AND SURFACE WATER IMPACTS PERMIT —L— STA I4+30.00 E111D PROJECT 17BP.13.R.25 o�� O�S� P���� P��l Q���� ����I� � �O `��� < � `�� y � � � �� �\ �� ��� O �� � _ � B,p���, S -_. O/�S C p�2�2 V� R�l —L— STA 12 + 10.00 BEGI11t PROJECT I7BP.13.R.25 PROJECT LENGTH Prepored ror� Nortn CorollRo Departmern PARSONS of Trons rtotion in the office of: SSaO Canterv�aw Dri�e LENGTH OF ROADWAY PROJECT 17BP.13.R.25 = 0.042 MILES R°""". "°a'" `°R°""° ��"e=��� 2012 ST9NDARD SPEClFICAT/ONS RIGHT OF WAY DATE: LETTING DATE: NCDOT CONTACT: EDWARD S. ROBBINS, PE PROJECT ET'GINEER DAVID GARRETT PROJECT DES7GN ENGINEER BRENDA L. MOORE, PE XOADWAY DESlGN: ENGlNEEXING COORDINATION SECTION ENGINEER 9TAT6 9TATE PROJCCT ftBPERENC6 NO. 1��� 17BP.13.R.25 9TAT¢ PR01.N0. P.A.PROJ.NO. s� OF�9CIUPlYON PE BUNCOMBE CO. STRUCTURE NO. 100291 PERMIT DRAWING SHEET 1 OF 6 HI'DRAULICS ENGINEER ROADWAY DESIGN ENGINEER PB. �� 98�s �bN PFt]EY,IMINARY FL.�NS DO NOT USE FOR CONSTRUCTION DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER � �. � � � 1 DAVID La PARKER CLASS 'I' RIP RAP � � SPEC CU DITCH � W/CL 'B' IP � � SEE TAI � � 2@73"x55" ALUMINIZED \ � CSPA WiSILLS \\\ \\� — � �. � \_— LITT� L� E POLE CREEK � WOODS __.�-� = —L — l2 +10.00 �� � BEGIN PROJECT l7BP.l3.R.25 � 4 THOMAS Je WOOD SURFACE WATER IMPACTS PERMIT SPEC CUT DITCH _ SEE DETAIL 2 2 � �ITIMOTHY Ae REE � � �' C I F � — ./ � nu�� R�iv�v v � — i F F F� � � `:� i: �i� RiP Ra,P . PDE ' ' \ S 3 MARK BLAZER o� � ���� P�c � BR��/ >�� � �- � G � C ` ' � ``� / � �`� � - FLOODPLA� � i _ /,/ � � G � , ��� G � � SPEC ITCH G �� �� 'B' RIP RAP � l SEE DETAIL 1 � � � � � �� G � FLOOD��C��J�I BEN ��� \� � \ \ � � 5 � \ , .�, �' � TIMOTHY Ae REEVES 1 � i�� // / � / / �� / ���/ � � �� � '`� /`2 �% %� �`� / � ��� � � o����`'�� , ��/�-, � / / — � � L — �4+30.00 � / E . PROJECT l7BP.l3.R.25 PROIECT REFERENCE NO. SHEET NO. l7BPJ3.R25 04 RNJ SHEET NO. ROADWAY DESIGN HYDRAUUCS ENGINEER ENGINEER � � WOOD TYPICAL-INLET AND OUTLET CHANNEL (NTS) PERMIT DRAWING SHEET 2 OF 6 �{ VARIES � I CL 'I' RIP RAP CL 'I' RIP RAP VARIES ;� 0 DETAIL 1 SPECIAL CUT DITCH ( Not To Scale) Front 0� Ditch Natural b�1 ,��e� Slope Ground ?'I D F�� d Filter Fabric Min. D=1.5 Ft. Type of Liner= Class 'B' Rip—Rap Max. d=1.0 Ft. FROM STA. 12 + 50 TO STA. 13 + 11 -L- LT FROM STA. 13 + 07 TO STA. 13 + 75 -L- RT DETAIL 2 SPECIAL CUT DITCH ( Not to Scale) Front t Ditch Natural � p�� �et Slope Ground ?•j p F\p � Min. D=1.5 Ft. FROM STA. 13 + 30 TO STA. 13 + 75 -L- LT DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER SURFACE WATER IMPACTS PERMIT PROIECT REFERENCE NO. SHEET NO. l7BPJ3.R25 04 RNJ SHEET NO. ROADWAY DESIGN HYDRAUUCS ENGINEER ENGINEER J /� � i / ' � `�,��ct.�� W00DS � ; , __� , �%pOS��.r , � , --, ��i,,�°��' 3 �� , ���� � PERMIT DRAWWG � ��� � ,� j SHEET 3 OF 6 � � � � ��,, � ti / �, . �; �� � ' � , �/ i � ,/ \ �'� , � � _ ��/ , �/ �/����v / - MARK BLAZE � '��� � sa , / �� �� 1 � / � . ,� , ,, / �v , /� ,j / . ,��., � � � SPEC� UY�iTCH �% � ,; /� �/ / /�j�� f r�. �� _ " .. , , , � \ _ � � E���ETAIL ' � ' � - ,Q,A�[I La PARKER , �� ; l� i '� i / � � -- �,��/ % ;' �,' ,/ � � �� �- � �,� ��. �,, ���/ /, - � ,- / � // �� - //� ,---� _ � / / � � r,�:s__ � i i i � � ! � � � � `� i � �� �/ � / � � � �v�/', V � � — --- CLASS� 'I' R�IP R�CP � '��� � - � � � � � �N�� �� ��i � �e �-./�� � � ���� f /i, �� I � � � ,� � , � � �-z��� � � � i I p� / � ��� � � i T // � i � v� / �� � � � . . � � `���s `�'� � ����� - � �- I � � � � �= P� '� � // c�� ��� =`� �� � �,� ,— � � — -- �� _ , R / -V // G� � '%' , � ��° ���' i � � , , _ _ _ _ � �,Q���� � � � � ' -�TI7vI0TH� Ae REE S ��e �`j-; �„��� � ,j �/� 'i, , , �� y v � � , / - %� \\\ � \ �` ,-. -, ; ,;I ;'I � / j -� � - y !: o � ,� '% // //��- � ' � , �, — � � — ���� � �— z��C [51T � � � � / � � � - � � � _ _ � �� , ,�� � ���<.! , �� � ' ����. �°� �:/ � � � � � A � �,gz�l1C L, � � � , / - , �� / � i/ / � / ���/ �� � �/ ' � � ��� / � / 1 �, , , �� ; � ��� - _� / SEE �AI �, / ��� �-- � ��/ /� 4���QOi , , , ��, ;�, - � , � � �' � , �, �, , � , � �� "° " j �� , p� / t� � i� �,/ , ���i �i �, � �,- � G ; _ ,�, , , i� �� .i , � _ � / � � �� � /�� � i/ .9 � l, � i �L3 ���1. � � \ � �7�- x���41�1v11 I��D , t�, , � � � - ,�'` ��% � /, � � � ' �� 5��4�'b1h5�CLS , - . ", , - £ il � ' �� ' � � k , � £ / � , �� F ` � � �,, �,� ,' ,' �� / � � �, , _ �� �/� �/ _ , __ , ,, � � , � _ _ , l , , �__�__ � ,,a– , , ,T �- , , , � ,� / � � � � � � � ; � r� � � - ' �`� I� ' ��� TYPICAL-INLET AND �, �� ��� ��_ _ �/ ; , '„ LAIN � �LbODP ��V �\ � � � _ � �_ — � � — — - � � - - ,, —_� � �/ � � � �� O�D OUTLET CHANNEL (NTS) � -- -� ,., �� � �� �;� �� "_ � . ,- - �_ '� � _ � �� � ; /� i � .._ 1 . , _ �' i - � � � � � '� ' VARIES -- , � , � � � r,r, ; � _ � � i ' % , , ,� � _ , �� / � � i � �� ,. - � , �� � �� I �_ % � / � � � _ I � L�T % , I — , / � � � / _ LE P0� CR�C� �� _ � _ � — - _ _ / � , � � = � -- ----�FM9- -- ���, � ' -- � � — � , -- -— � I CL I RIP RAP �- � _ = G 1 �i --- - _ � G ` � � ��� v , ; „ _ � � � �� F - � � \ � �(�\� � � � GL 'I' RIP RAP � , � -- \ � � , � �� SPE � ', - — � � � � � - '-`__ � � �- _� � � ��, .� �� �� � F � �� � G � � � ` ' B' RI P RA � �, � I I v,nRies �, —__ — � — — , , � ` _ � C � -- -= �� � � ,� . � / � � ;� '� E 1 --- ---- � , � =� � � � S'� D ET� _�- l��1�t10- - ' `� � � �-� �� � � v A � I 1 59��\\ � ,(// � II I J . � � � , � � � � ., BE�/�( PROJECT /7BP�' ���� , , � ''� �'��� �� FLO� D�;�l ��� EB N � ��'%;�'� DETAIL 1 � �� � �� i RiP �,� , , ,�p� � ! / ' SPECIAL CUT DITCH � . �. ; � �r ��� � �� � �/ �' �� � � � �� �°�� � / ' (Norto s�a�e) � � � � �� � � � � ' � FronY � � _ � � � _ �� � � � � � � 1 0� Ditch � �� � �,_ � � � Natural b'• �e� Slo e � �� � � ��\, t /�� � � � � � � � � Ground ?'I � �V0 p � � -- �— ',, ,� �5 � �, � , d � ����� \�� i � �V � �;- � � � � Filter Fabric = 4 � A �� �� , _ Min. D 1.5 Ft. �\, �.� ,'�` �� � T e of Liner= Class 'B' Ri -Ra Max. d=1.0 Ft. � TIMOTHY ��� Ae RE'EVE� Yp p p � � � �� THOMAS Je OOD �\� ���, ,� FROM STA. 12+50 TO STA. 13+11 -L- LT � ���, � FROM STA. 13 + 07 TO STA. 13 + 75 -L- RT i � / , �\ _� `� 1 � � \ --� � � � _ _�� / / � - DETAIL 2 _ _ � - ' � SPECIAL CUT DITCH \ � �� � ( Not to Scale) � Front t Ditch __, Natural � p�� �et Slope i�>C / Ground 2.) D F\O � � Min. D=1.5 Ft. FROM STA. 13 + 30 TO STA. 13 + 75 -L- LT C� STQ = 13+08 -�- GRADE POINT E�EV = 2174060 2� 73" X 55" A�UMINIZED CSP� W/ SI��S SKFW = I10� EXISTING BRIDGE TO BE REMOVED ��---_ A � �� - � - _ �� - ---- - --- - ------ - _ --------- � -_-- - �� � EXST BED WSE ON 1-17-12 =2171.3 INV ELEV=2167.6 SLOPE = 0.036 FT/FT 200 �PSTRE�M 00 ��� -1�- - I \ _� � 4:1 NORMAL __ � � TB RT ----- � � � -------- � TB LT �\ `- EXST BED O U DOWNSIREAM � ��� WETLAND PERMIT IMPACT SUMMARY WETLANDIMPACTS SURFACE WATERIMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (tt) (ft) 12+58 TO 13+30 -L- STREAMBANK STABILIZATIO < 0.01 24 CULVERT < 0.01 54 STREAMBANK STABILIZATIO < 0.01 35 TEMPORARY DEWATERING 0.01 131 TOTALS`: < 0.01 0.01 113 131 0 `Rounded totals are sum of actual impacts NOTES: �TN Revised 3/12/13