HomeMy WebLinkAboutNCC243397_ESC Approval Submitted (2)_20241101 Neil R Uldrick
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Thursday, October 31, 2024 9:30 AM
To: Neil R Uldrick
Subject: NCDEQ Erosion & Sedimentation Control Letter of Plan Approval with Modifications Needed
CRM:0170241
Attachments: DAVID-2025-0181_Bristol Fields Lots.pdf; Application Report -Thursday, October 31, 2024 920
AM.pdf
[External]
0,tHF-STATE
1K4
1 O!
c s� ,ezi71 �L.
\S Q JAM V10��:
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Mary Penny Kelley
Secretary
William Vinson Jr. (Acting)
Director
10-31-2024
LETTER OF APPROVAL WITH MODIFICATIONS
DR Horton, Inc.
4150 Mendenhall Oaks Parkway
High Point, NC 27265
RE: Project Name: Bristol Fields Lots
Acres Approved: 13.27
Application ID: PA-007710
Permit Number: DAVID-2025-0181
Address:Zimmerman Rd
City: Lexington
1
County: Davidson
River Basin:Yadkin-Pee Dee
Stream Classification: C:Aquatic Life,Secondary Contact Recreation, Fresh water
Plan Type: New Plan
Dear DR Horton, Inc.,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are
listed on the attached page.The Certificate of Approval must be posted at the job site. Please see the attached
Application Report (FRO form), Letter of Approval (LOA) and the Certificate of Approval (COA), if applicable. This plan
approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as
is required by Title 15A NCAC 4B .0129.
The attached, signed, digital copy of the letter may be used to submit with your electronic Notice of Intent (eN01) in order
to receive your Certificate of Coverage (COC). As of April 1, 2019, all new construction activities are required to complete
and submit an electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit.After the form is reviewed and found to be complete, you will receive a link with payment
instructions for the $120 annual permit fee.After the fee is processed,you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of
any land disturbing activity.TheeNOlform may be accessed atdeq.nc.gov/NCG01. Please direct questions about
the eNOlform to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in
the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form,which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee.ln addition, it would be helpful if you notify this office of a change to the proposed starting
date for this project.
2
Modifications Required for Approval:
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
2.Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800
and asking to speak with the Land Quality inspector for your county. Permission must be obtained and granted
from NC DEQ DEMLR prior to the removal of any ESC measures. All additional permits should be obtained, as
necessary, prior to beginning construction. [GS 113A-51, 15A NCAC 4B .0120]
3. Any off-site borrow and waste required for this project must come from a site with an approved erosion
control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid
Waste Management. Trash/debris from demolition activities or generated by any activities on site must be
disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste
Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
4. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If
the approved erosion and sedimentation control measures prove insufficient, the applicant must take those
additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]
5. The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to
yearly NCG01 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR
prior to filing the Notice of Termination (NOT) to terminate NCG01 coverage. The closure inspection should
not be requested until after the site has achieved full vegetative stabilization and measures have been
removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full
growing season is necessary between initial seeding/mulching and removal of measures. Please plan your
construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised
you may be asked for representative site pictures prior to a closure inspection. [General Comment]
Your cooperation is appreciated.
Sincerely,
Jack Lawry-Popelka, EIT
336-776-9659
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
3
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land
-_ Resources
DE Q�� Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 I Winston-Salem NC,
27105
336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
CAUTION:This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
4